GeM Logo, Government of India
gem gem
  • Dark Mode
  • Font Size A- A A+
  • Skip to Main Content  
S.NO. Group Name Applicable for Clause Type ATC Clause Values
1 Generic MASTER NORMAL

Malicious Code Certificate:

The seller should upload following certificate in the bid:-
(a) This is to certify that the Hardware and the Software being offered, as part of the contract, does not contain Embedded Malicious code that would activate procedures to :-
        (i) Inhibit the desires and designed function of the equipment.
        (ii) Cause physical damage to the user or equipment during the exploitation.
    &nb ...Read More

NA
2 Generic goods NORMAL OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity by up to 25% of the contracted  quantity during the currency of the contract at the contracted rates. Bidders are bound to accept the orders accordingly. NA
3 Generic goods SLA The buyer organization is an institution eligible for concessional rates of GST as notified by the Government of India. The goods for which bids have been invited fall under classification of GST concession and the conditions for eligibility of concession are met by the institution. A certificate to this effect will be issued by Buyer to the Seller after award of the Contract. Sellers are requested to submit their bids after accounting for the Concessional rate of GST.
Applicable Concessiona ...Read More
1. Applicable concessional rate of GST
Type: FLOAT
2. Notification No
Type: ALPHA_NUMERIC
3. Notification Date
Type: DATE
4 OEM goods NORMAL IMPORTED PRODUCTS: In case of imported products, OEM or Authorized Seller of OEM should have a registered office in India to provide after sales service support in India. The certificate to this effect should be submitted. NA
5 Purchase Preference (State) MASTER NORMAL Bid reserved for MSE from the State of Bid Inviting Authority: Procurement under this bid is reserved for purchase from Micro and Small Enterprises from the State of Bid Inviting Authority having valid Udyam Registration and whose credentials are validated online through Udyam Registration portal. If the bidder wants to avail themselves of the reservation benefit, the bidder must be the manufacturer / OEM of the offered product on GeM. Traders are excluded from the purview of Pu ...Read More NA
6 Purchase Preference (State) MASTER SLA Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs from the State of Bid Inviting Authority having valid Udyam Registration and whose credentials are validated online through Udyam Registration portal as defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012 dated 23.03.2012 issued by Ministry of Micro, Small and Medium Enterprises and its subsequent Orders/Notifications issued by concerned Minist ...Read More 1. Quoted price as percentage margin of purchase perference/price
Type: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, ...Read More
7 Scope of Supply goods SLA Scope of supply (Bid price to include all cost components) : ${scopeOfSupply} Scope of supply (Bid price to include all cost components)
Type: Only supply of Goods, Supply Installation Testing and Commissioning of Goods, Supply Installation Testing Commissioning of Goods and Training of operators and providing Stat ...Read More
8 Service & Support MASTER NORMAL Escalation Matrix For Service Support : Bidder/OEM must provide  Escalation Matrix of Telephone Numbers for Service Support. NA
9 Service & Support MASTER NORMAL Dedicated /toll Free Telephone No. for Service Support : BIDDER/OEM  must have  Dedicated/toll Free Telephone No. for Service Support. NA
10 Service & Support services NORMAL AVAILABILITY OF OFFICE OF SERVICE PROVIDER: An office of the Service Provider must be located in the state of Consignee.  DOCUMENTARY EVIDENCE TO BE SUBMITTED. NA
11 Service & Support goods NORMAL Availability of Service Centres: Bidder/OEM must have a Functional Service Centre in the State of each Consignee\'s Location in case of carry-in warranty. (Not applicable in case of goods having on-site warranty). If service center is not already there at the time of bidding, successful bidder / OEM shall have to establish one within 30 days of award of contract. Payment shall be released only after submission of documentary evidence of having Functional Service Centre. NA
12 turnOver goods NORMAL OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitu ...Read More NA
13 turnOver goods NORMAL Bidder Turn Over Criteria: The minimum average annual financial turnover of the bidder during the last three years, ending on 31st March of the previous financial year, should be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant / Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution / incorporat ...Read More NA
14 Warranty goods SLA Timely Servicing / rectification of defects during warranty period: After having been notified of the defects / service requirement during warranty period, Seller has to complete the required Service / Rectification within ${noOfDays} days time limit. If the Seller fails to complete service / rectification with defined time limit, a penalty of 0.5% of Unit Price of the product shall be charged as penalty for each week of delay from the seller. Seller can deposit the penalty with the Buyer direct ...Read More No of Days
Type: 3, 4, 5, 6, 7, 10, 15
15 Generic services SLA The buyer organization is an institution eligible for concessional rates of GST as notified by the Government of India. The services for which bids have been invited fall under classification of GST concession and the conditions for eligibility of concession are met by the institution. A certificate to this effect will be issued by Buyer to the Seller after award of the Contract. Sellers are requested to submit their bids after accounting for the Concessional rate of GST.
Applicable Concessi ...Read More
1. Applicable concessional rate of GST
Type: FLOAT
2. Notification No
Type: ALPHA_NUMERIC
3. Notification Date
Type: DATE
16 Service & Support services SLA The Service Provider is required to have at least ${percentage} % of the required manpower on service provider’s payroll for at least one year. Necessary documents relating to such manpower will be uploaded by the bidder for verification of the buyer. Such manpower will be part of total manpower to be provided by the Service Provider in case he gets the contract against this bid. Percentage Required
Type: 10, 20, 30, 40
17 Service & Support services SLA The Service Provider must own ${percentage}% of the bid quantity of vehicles in Service Provider’s name or in the name of the proprietor / partner of the Service Provider. Necessary documents relating to proof of ownership will be uploaded by the bidder for verification of the buyer. Such Service Provider owned vehicles will be part of the fleet to be deployed by the Service Provider in case he gets the contract against this bid. Percentage Required
Type: 10, 20, 30
18 Reference Sample Clause goods NORMAL For clothing and allied items, if pre-dispatch Inspection clause has been selected in the Bid, the Inspection Agency shall forward sample from the accepted lot duly identified/ sealed by it, as Reference Sample to each consignee (one reference sample per consignee) for comparing the lot received at consignee end with such reference sample. Such reference samples will be treated as part of supplied quantity from the lot and cost shall be borne by the Buyer. NA
19 Buyback goods NORMAL Buyback for Non PFMS/Non GPA:
1. GST will apply on the value of buyback and separate invoice is to be prepared by Government buyer/Consignee for buyback items offline outside the GeM system. Vendor should work out input credit for that GST applicable on the buy back while quoting the product/services.
2. Input GST Credit consideration by seller- seller shall offer the prices in the bid by the total amount of new goods including GST- total amount of old goods quoted by the firm exclud ...Read More
NA
20 Past Project Experience goods NORMAL The Bidder / OEM {themselves or through reseller(s)}, should have executed project for supply and installation / commissioning of same or similar Category Products during preceding 3 financial years (i.e. current year and three previous financial years) as on opening of bid, as per following criteria:
 
(i) Single order of at least 35% of estimated bid value; or
(ii) Two orders of at least 20% each of estimated bid value; or
(iii) Three orders of at least 15% each of est ...Read More
NA
21 Purchase Preference (Centre) MASTER SLA Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs as defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012 dated 23.03.2012 issued by Ministry of Micro, Small and Medium Enterprises and its subsequent Orders/Notifications issued by concerned Ministry. If the bidder wants to avail the Purchase preference, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are ex ...Read More Required Percentage
Type: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56 ...Read More
22 Purchase Preference (Centre) goods NORMAL Indian suppliers of this item are not allowed to participate and/ or compete in procurement by some foreign governments. Bidders / products from such countries are not eligible / not allowed to participate in this bid in terms of clause 1 (d) of Public Procurement (Preference to Make in India) Order, 2017 NA
23 Certificates goods NORMAL The bidder is required to upload, along with the bid, all relevant certificates such as BIS licence, type test certificate, approval certificates and other certificates as prescribed in the Product Specification given in the bid document. NA
24 Inspection goods SLA Nominated Inspection Agency: On behalf of the Buyer organization, any one of the following Inspection Agency would be conducting inspection of stores before acceptance:
Pre-dispatch Inspection at Seller Premises (applicable only if pre-dispatch inspection clause has been selected in ATC): ${prelimit}
Post Receipt Inspection at consignee site before acceptance of stores: ${postlimit}
1. Pre-dispatch Inspection
Type: ALPHA_NUMERIC
2. Post Receipt Inspection
Type: ALPHA_NUMERIC
25 Forms of EMD and PBG MASTER SLA Bidders can also submit the EMD with Account Payee Demand Draft in favour of ${draftFavour} payable at ${draftPayable}.
Bidder has to upload scanned copy / proof of the DD along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.
1. Account Payee Demand Draft in favour
Type: ALPHA_NUMERIC
2. Payable
Type: ALPHA_NUMERIC
26 Forms of EMD and PBG MASTER SLA Bidders can also submit the EMD with Fixed Deposit Receipt made out or pledged in the name of A/C ${BuyerName}. The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of EMD, the FDR will be released in the favour of the bidder by the Buyer after making endorsement on the back of the FDR duly signed and stamped along with covering letter. Bidder has to upload scanned copy/ proof of the FDR along with bid and has to ensu ...Read More Fixed Deposit Receipt made out or pledged in the name A/C (Name of the Buyer)
Type: ALPHA_NUMERIC
27 Forms of EMD and PBG MASTER SLA Bidders can also submit the EMD with Banker’s Cheque in favour of ${bankerCheque} payable at ${payable}.
Bidder has to upload scanned copy / proof of the BC along with bid and has to ensure delivery of hardcopy to the Buyer within 5 days of Bid End date / Bid Opening date.
1. Banker’s Cheque in favour
Type: ALPHA_NUMERIC
2. Banker’s Cheque Payable at
Type: ALPHA_NUMERIC
28 Forms of EMD and PBG MASTER SLA Bidders can also submit the EMD with Payment online through RTGS / internet banking in Beneficiary name ${beneficiaryName} Account No. ${accountNumber} IFSC Code ${ifscCode} Bank Name ${bankName} Branch address ${branchAddress}.
Bidder to indicate bid number and name of bidding entity in the transaction details field at the time of on-line transfer. Bidder has to upload scanned copy / proof of the Online Payment Transfer along with bid.
1. Beneficiary name
Type: ALPHA_NUMERIC
2. Account Number
Type: ALPHA_NUMERIC
3. IFSC Code
Type: ALPHA_NUMERIC
4. Bank Name
Type: ALPHA_NUMERIC
5. Branch Address
Type: ALPHA_NUMERIC ...Read More
29 Forms of EMD and PBG MASTER SLA Successful Bidder can submit the Performance Security in the form of Account Payee Demand Draft also (besides PBG which is allowed as per GeM GTC). DD should be made in favour of ${ddFavour} payable at ${ddPayable}. After award of contract, Successful Bidder can upload scanned copy of the DD in place of PBG and has to ensure delivery of hard copy to the original DD to the Buyer within 15 days of award of contract. 1. DD should be made in favour
Type: ALPHA_NUMERIC
2. Payable
Type: ALPHA_NUMERIC
30 Forms of EMD and PBG MASTER SLA Successful Bidder can submit the Performance Security in the form of Fixed Deposit Receipt also (besides PBG which is allowed as per GeM GTC). FDR should be made out or pledged in the name of ${frdName} A/C (Name of the Seller). The bank should certify on it that the deposit can be withdrawn only on the demand or with the sanction of the pledgee. For release of Security Deposit, the FDR will be released in favour of bidder by the Buyer after making endorsement on the back of the FDR duly signed ...Read More FDR should be made out or pledged in the name A/C (Name of the Seller)
Type: ALPHA_NUMERIC
31 Forms of EMD and PBG MASTER SLA Successful Bidder can submit the Performance Security in the form of Payment online through RTGS / internet banking also (besides PBG which is allowed as per GeM GTC). On-line payment shall be in Beneficiary name ${beneficiaryName} Account No. ${accountNumber} IFSC Code ${ifscCode} Bank Name ${bankName} Branch address ${branchAddress}. Successful Bidder to indicate Contract number and name of Seller entity in the transaction details field at the time of on-line transfer. Bidder has to upload sca ...Read More 1. Beneficiary name
Type: ALPHA_NUMERIC
2. Account Number
Type: ALPHA_NUMERIC
3. IFSC Code
Type: ALPHA_NUMERIC
4. Bank Name
Type: ALPHA_NUMERIC
5. Branch Address
Type: ALPHA_NUMERIC ...Read More
32 Generic goods SLA Staggered Delivery: The ordered items shall be supplied in a staggered manner. ( ${quantity} Quantity shall be supplied within ${days} days of contract placement and thereafter ${weekQuantity} Quantity per ${quantityPer}) 1. Quantity Supplied
Type: FLOAT
2. Quantity Supplied Days
Type: INT
3. Contract Placement
Type: FLOAT
4. Quantity Per
Type: Week, Fortnight, Month, Quarter
33 Generic MASTER NORMAL Bidder financial standing: The bidder should not be under liquidation, court receivership or similar proceedings, should not be bankrupt. Bidder to upload undertaking to this effect with bid. NA
34 Generic MASTER NORMAL Consortium: In case of Contracts, wherein the seller alone does not have necessary expertise, the seller can form consortium with other sellers for submission of the bid, with one of the consortium company as leader. However, each and every member of the consortium shall be equally responsible for the complete execution of the project contract. An undertaking to this effect is to be uploaded with bid. NA
35 Generic goods NORMAL End User Certificate: Wherever Bidders are insisting for End User Certificate from the Buyer, same shall be provided in Buyer’s standard format only. NA
36 Generic goods NORMAL Non return of Hard Disk: As per Buyer organization’s Security Policy,Faulty Hard Disk of Servers/Desktop Computers/ Laptops etc. will not be returned back to the OEM/supplier against warranty replacement. NA
37 Generic MASTER SLA Bidders shall quote only those products (Part of Service delivery) in the bid which are not obsolete in the market and has at least ${leastYears} years residual market life i.e. the offered product shall not be declared end-of-life by the OEM before this period. Bidders shall quote only those products in the bid which are not obsolete in the market and has least years
Type: 1, 2, 3, 4, 5, 6, 7
38 Reference Sample Clause goods SLA After award of contract – Successful Bidder shall have to get advance sample approved from buyer before bulk manufacturing / starting bulk supplies. Successful Bidder shall submit ${submitSamples} samples for Buyer`s approval, within ${approvalDays} days of award of contract. Buyer shall, as per contract specifications framework, either approve the advance sample or will provide complete list of modification required in the sample within ${modificationDays} days of receipt of advance sample. S ...Read More 1. Samples Submited by Successful Bidder
Type: INT
2. Buyer approval days
Type: 5, 7, 10, 15, 21
3. Days for Complete List of Modification Required in the Sample
Type: 5, 7, 10, 15, 21
39 Generic goods SLA After award of contract – Successful Bidder shall have to get Detailed Design Drawings approved from buyer before starting fabrication. Successful Bidder shall submit Detailed Design Drawings for Buyer`s approval, within ${approvalDays} days of award of contract. Buyer shall, either approve the drawings or will provide complete list of modification required in the drawings within ${modificationDays} days. Seller shall be required to ensure supply as per approved Drawings with modifications as ...Read More 1. Successful Bidder shall submit Detailed Design Drawings for Buyer approval days
Type: 5, 7, 10, 15, 21
2. Days for Complete List of Modification Required in the Drawings
Type: 5, 7, 10, 15, 21
40 Warranty goods SLA Bidder / OEM has to give an undertaking that after expiry of warranty period, it will provide AMC Service for next ${amcService} years for the offered products at the rate not more than ${offeredPercent} % of contract price per annum. Buyer reserves the right to enter into an AMC agreement ( covering preventive maintenance and servicing)with the Successful Bidder / OEM after expiry of the Warranty period at rate as mentioned above and the payment for the AMC charges would be made ${amcCharges} ...Read More 1. AMC Service for Years
Type: 1, 2, 3, 4, 5
2. Percentage Offered Products at the Rate not More Than
Type: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
3. Payment for the AMC Charges
Type: Monthly, Quarterly, Biannually, Annu ...Read More
41 Warranty goods SLA Bidder / OEM has to give an undertaking that after expiry of warranty period, it will provide Comprehensive Maintenance Service for next ${maintenanceService} years for the offered products at the rate not more than ${productsRate} % of contract price per annum. Buyer reserves the right to enter into a CMC agreement with the Successful Bidder / OEM after expiry of the Warranty period at above mentioned rate and the payment for the CMC charges would be made ${cmcCharges} after rendering of the ...Read More 1. Comprehensive Maintenance Service Years
Type: 1, 2, 3, 4, 5
2. Percentage Offered Products at the Rate not More Than
Type: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20
3. Payment for the CMC Cha ...Read More
42 Warranty goods SLA Over and above the normal Warranty terms as per GeM GTC, the successful bidder / OEM shall have to provide Comprehensive Warranty during the entire Standard warranty period as per contract. : The comprehensive warranty shall be covering the following scope ${comprehensiveWarranty} (Upload an undertaking with the bid confirming compliance by the bidder if Bidder is taking onus of this compliance. In case OEM is taking onus of this compliance, OEM undertaking is to be uploaded along with Bidde ...Read More The comprehensive warranty shall be covering the following scope
Type: ALPHA_NUMERIC
43 Generic goods SLA The Buyer has an existing set up / inventory of similar products. The offered / supplied product must be compatible with existing system. The bidder has to ensure Compatibility of the supplied items or shall have to include in the supply the necessary hardware / software to make them compatible at no extra cost to the buyer. The details of items with which compatibility is required are as under: ${compatibilityRequired} The comprehensive warranty shall be covering the following scope
Type: ALPHA_NUMERIC
44 Generic goods SLA The successful bidder has to supply all essential accessories required for the successful installation and commissioning of the goods supplied. Besides standard accessories as per normal industry practice, following accessories must be part of supply and cost should be included in bid price: ${bidPrice}. Cost Included in Bid price
Type: ALPHA_NUMERIC
45 Warranty goods NORMAL Successful bidder will have to ensure that adequate number of dedicated technical service personals / engineers are designated / deployed for attending to the Service Request in a time bound manner and for ensuring Timely Servicing / rectification of defects during warranty period, as per Service level agreement indicated in the relevant clause of the bid. NA
46 Certificates MASTER NORMAL Bidder\'s offer is liable to be rejected if they don\'t upload any of the certificates / documents sought in the Bid document, ATC and Corrigendum if any. NA
47 Generic goods NORMAL For hazardous chemical/item, all precautionary measure as per regulation from the point of transportation/ handling/ storage/ safety/ health/ environment to be undertaken/ specified before dispatch. During dispatch, proper symbol for the hazard/ MSDS/ Batch No./ date of manufacturing/ Gross Weight/ Net Weight/ shelf Life etc are to be written/ printed/ pasted on the body of the packing. NA
48 Generic goods NORMAL Data Sheet of the product(s) offered in the bid, are to be uploaded along with the bid documents. Buyers can match and verify the Data Sheet with the product specifications offered. In case of any unexplained mismatch of technical parameters, the bid is liable for rejection. NA
49 Certificates goods NORMAL Material Test Certificate Should Be Sent Along with The Supply. The Material Will Be Checked by Buyer’s Lab & the Results of the Lab will be the Sole Criteria for Acceptance of the Item. NA
50 Generic goods NORMAL Without prejudice to Buyer’s right to price adjustment by way of discount or any other right or remedy available to Buyer, Buyer may terminate the Contract or any part thereof by a written notice to the Seller, if:
i) The Seller fails to comply with any material term of the Contract.
ii) The Seller informs Buyer of its inability to deliver the Material(s) or any part thereof within the stipulated Delivery Period or such inability otherwise becomes apparent.
iii) The Seller fails to d ...Read More
NA
51 Generic MASTER NORMAL 1. The Seller shall not assign the Contract in whole or part without obtaining the prior written consent of buyer.
2. The Seller shall not sub-contract the Contract in whole or part to any entity without obtaining the prior written consent of buyer.
3. The Seller shall, notwithstanding the consent and assignment/sub-contract, remain jointly and severally liable and responsible to buyer together with the assignee/ sub-contractor, for and in respect of the due performance of the Contract and ...Read More
NA
52 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
53 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
54 Generic goods SLA Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for ${SLA_PARAM_1} before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion. Experience Criteria in Years
Type: 1 year, 2 years, 3 years
55 Ration Item ATCs goods NORMAL Packing Material The items will be supplied by the successful bidder in its original packing material and the packing material will not be returned. Weight of packing material will not be included in quantity supplied and only net weight of the items will be counted. The packing should be of standardized weights of appropriate size. Item will not be accepted in non-standardized weights.Packing Material. The items will be supplied by the successful bidder in its original packing ...Read More NA
56 Ration Item ATCs goods NORMAL Demurrage charges In case the rejected items are not lifted by the firm within 48 hrs, the demurrage charges at the rate of 0.5% of total contract value will be charged per day. In case the items are not lifted within a month, the same will be destroyed by the station board of officers and no claim will be admitted.Demurrage charges. In case the rejected items are not lifted by the firm within 48 hrs, the demurrage charges at the rate of 0.5% of total contract value will be ...Read More NA
57 Ration Item ATCs goods NORMAL Pre-Dispatch Inspection     The following Pre-dispatch Inspection clause will form part of the contract placed on successful Bidder :-
(a) The CFL/ its representatives will carry out Pre-Despatch Inspection (PDI) of the stores in order to check their compliance with specifications in accordance with its usual standard procedures. Upon successful completion of such PDI, the Seller and CFL/ its representatives will issue and sign a Certificate of Conformity as per the spe ...Read More
NA
58 Ration Item ATCs goods NORMAL Warranty The following Warranty clause will form part of the contract placed on successful Bidder :-
(a) The Seller warrants that the goods supplied under the contract conform to Defence Food Specification prescribed and shall perform according to the said Defence Food Specification in any climate and under all conditions of storage and movement in India (the warranty period of the item is as given in the Defence Food Specification attached from the date of acceptance of stor ...Read More
NA
59 Ration Item ATCs goods NORMAL Shelf Life The supplier shall declare the shelf life/best before use for a minimum period equal to the warranty period as given in the DFS for the item. The item should be of the latest manufacture, conforming to the current production standard and having 100% defined life at the time of delivery. NA
60 Ration Item ATCs goods NORMAL Inspection and Quality Check of Goods (Analysis, Verdict and appeal) Samples drawn by the inspecting officer at the time of inspection are known as Acceptance samples.  Verdict shall be issued by CFL concerned on the basis of analysis of Original Sample.  No additional time for tendering of stocks shall be given to the suppliers in case of rejection of stocks by CFL and verdict is issued after DP / Extended DP.
(a).  In the case of rejection of stores by the Inspecting O ...Read More
NA
61 Human Resource Service MASTER NORMAL Recruitment mandated through Sewayojan Portal: Recruitment of candidates is mandated through Sewayojan Portal (url:www.sewayojan.up.nic.in). Successful bidder / Service Provider has to select candidates registered on the Sewayojan Portal only for deployment under this contract. As such successful Service provider will have to make available adequate number of candidates / resources registered on sewayojan portal for selection / short listings by the Buyer department For 1 employ ...Read More NA
62 Human Resource Service MASTER NORMAL Continuity of resources deployed by Service Provider: Successful Service provider will ensure continuity of any allocated / deployed resources with the prior consent of the buyer department. Deployed resources cannot be replaced by Service Provider without prior approval of buyer. Any replacement will also be provided through Sewayojan Portal only. NA
63 Human Resource Service MASTER SLA Deployment of Existing working / deployed resources: ${existingWorking} number of Existing working / deployed resources of the procurement department having job satisfactory certificate, will be continued by the successful Service Provider under the new contract also – subject to their consent to the Terms and conditions of new contract concluded on the basis of this bid. Number Of Existing Working / Deployed Resources
Type: FLOAT
64 Inspection MASTER SLA Inspection of Stores by Inspection Authority of buyer or their authorised Inspecting officers / empanelled inspection agency or their representatives
An independent third party Professional Inspection Body can help buyer in mitigating buyer`s risk with pre-dispatch/post-dispatch inspection in order to ensure that equipment, components , solutions and documentation conform to contractual requirements. If an institutional buyer like Defense , Railways and MHA etc desires to ap ...Read More
Cost of Inspection in Term of Percentage
Type: FLOAT
65 Inspection MASTER SLA Inspection of Stores by Inspection Authority of buyer or their authorised Inspecting officers / empanelled inspection agency or their representatives
An independent third party Professional Inspection Body can help buyer in mitigating buyer`s risk with pre-dispatch/post-dispatch inspection in order to ensure that equipment, components , solutions and documentation conform to contractual requirements. If an institutional buyer like Defense , Railways and MHA etc desires to ap ...Read More
Cost of Inspection in Term of Percentage
Type: FLOAT
66 Inspection MASTER SLA Inspection of Stores by Inspection Authority of buyer or their authorised Inspecting officers / empanelled inspection agency or their representatives
An independent third party Professional Inspection Body can help buyer in mitigating buyer`s risk with pre-dispatch/post-dispatch inspection in order to ensure that equipment, components , solutions and documentation conform to contractual requirements. If an institutional buyer like Defense , Railways and MHA etc desires to ap ...Read More
Cost of Inspection in Term of Percentage
Type: FLOAT
67 Inspection goods NORMAL Pre-dispatch inspection at Seller premises (Fee/Charges to be borne by the BUYER): Before dispatch, the goods will be inspected by Buyer / Consignee or their Authorized Representative or by Nominated External Inspection Agency (independently or jointly with Buyer or Consignee as decided by the Buyer) at Seller premises (or at designated place for inspection as declared / communicated by the seller) for their compliance to the contract specifications. Fee/Charges taken by the Ext When there is requirement of submission the advance sample, the seller shall inform the buyer promptly through emails about the date of submission of sample to the buyer nominated Inspection agency.'> ...Read More NA
68 Generic goods NORMAL The seller is required to print logo as per buyer\'s requirement. NA
69 Generic goods SLA Scope of supply includes Training: Number of employees to be trained ${numberOfEmployees} , Place for Training ${placeForTraining} and Duration of training ${durationOfTraining} days. 1. Number of employees to be trained
Type: INT
2. Place for Training
Type: ALPHA_NUMERIC
3. Duration of training
Type: INT
70 Generic MASTER SLA Actual delivery (and Installation & Commissioning (if covered in scope of supply)) is to be done at following address ${addressOne} ${addressTwo} ${addressThree} ${addressFour} ${addressFive}. 1. Address 1
Type: ALPHA_NUMERIC
2. Address 2
Type: ALPHA_NUMERIC
3. Address 3
Type: ALPHA_NUMERIC
4. Address 4
Type: ALPHA_NUMERIC
5. Address 5
Type: ALPHA_NUMERIC
71 Payment S31 NORMAL If the payments to the hired / deployed resources are delayed by the Service Provider, a penalty of 18% p.a. of the billing amount will be imposed for delay in payment beyond 5 working days. This penalty will be in addition to the existing penalty as per SLA clause in the STC of Service. NA
72 Generic goods SLA OPTIONAL SITE VISIT:

 1. The Bidder is advised to visit and examine the installation site and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the Bid. The costs of visiting the site shall be borne by the Bidder. ${address}

 2. The Bidder representative shall be allowed entry upon consignee premises for such visits, only upon the express conditions that the Bidder will release and indemnify ...Read More

Costs of Visiting the Site Shall be Borne by the Bidder
Type: ALPHA_NUMERIC
73 Financial Criteria goods NORMAL NET WORTH: Net Worth of the OEM should be positive as per the last audited financial statement. NA
74 Generic MASTER SLA Shelf Life: The Product/Spare parts to be supplied as part of the services must have minimum ${productSuppliedMinimum} Shelf Life. On the date of supply, minimum ${dateSupplyMinimum} usable shelf life should be available / balance. 1. Product to be Supplied must have Minimum
Type: ALPHA_NUMERIC
2. Date of Supply Minimum
Type: ALPHA_NUMERIC
75 Generic goods NORMAL Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower), subject to the maximum of quoted GST %. NA
76 Generic goods NORMAL Installation, Commissioning, Testing, Configuration, Training (if any - which ever is applicable as per scope of supply) is to be carried out by OEM / OEM Certified resource or OEM authorised Reseller. NA
77 Generic goods NORMAL IT equipment shall be IPv6 ready from day one. NA
78 Service & Support MASTER NORMAL In the event where the distance travelled exceeds the monthly usage variant, amount will be paid for additional Kms as per schedule. Similarly, the unused Kms in a particular month as against the minimum guaranteed usage variant will be carried forward to the next month and additional Km if any in the next month shall be adjusted against this. However, the payment for the selected usage variant in a month will be paid every month.” Further, the unused Kms in a particular month shall not be car ...Read More NA
79 Generic goods NORMAL OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity by up to 50% of the contracted  quantity during the currency of the contract at the contracted rates. Bidders are bound to accept the orders accordingly. NA
80 Generic MASTER SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Bidders shall have to upload scanned copy of signed integrity pact as per Buyer organizations policy along with bid. ${intergrityPactDoc} Uploaded Integrity Pact File
Type: UPLOADPANEL
81 Generic MASTER SLA

Quantity Variation of Price format

 a) Quantity variation (+/- 20%) to complete the ship shall be considered by the firm for the supply of ${supplyQuantity} from the quantity worked out by the firm based on applicable drawings attached in Purchase Technical Specification.

 b) Any change in the quantity of these items required to complete the ship beyond the variation mentioned above (+/- 20%) shall be considered as a variation order and unit quantity rates as per price ...Read More

1. Quantity Variation (+/- 20%) to Complete the ship shall be Considered by the firm for the Supply
Type: ALPHA_NUMERIC
2. Supply of all Items other than (+/- 5%) to Complete
Type: ALPHA_NUMERIC
82 Generic goods NORMAL Buyer reserves the right to postpone schedule of material supply after finalisation of order by 6 months without any additional cost implication. NA
83 Generic goods NORMAL Receipt inspection at yard shall be carried out by Buyer QC team and or or any external agency nominated by Buyer jointly with Seller representative. All requisite documentation including packing list, certificates, approved drawings etc are to be submitted to Buyer in advance for enabling inspection. Detailed Packing list (considered as actual supply quantity) shall clearly mention individual items in package and shall be the basis for physical inspection on receipt. NA
84 Generic goods NORMAL Calculation of Quantity:

The quantity of gas actually consumed in each batch of supply shall be acknowledged and accounted. For calculating the quantity of gas consumed in each batch, following procedures shall be followed.

 1) Weighment of vehicle with filled gas cylinders at the time of arrival.

 2) Weighment of empty vehicle after unloading of gas cylinders.

 3) Weighment of vehicle before loading of empty cylinders.

 4) Weighment ...Read More

NA
85 Generic goods NORMAL Delivery is required on ‘As and when required basis’ within 7 days of issue of delivery advice. NA
86 Generic goods NORMAL

Pre despatch inspection will be carried out by any one of the buyer’s approved third party inspection agency (TPIA) viz. IRS / Lloyds /RITES/ Bureau Veritas / DNV and TURBOSCOPE VETCO. The scope of 3rd party inspection will be as follows:

 a) Inspection of quality as per order during production.

 b) Checking of bag specification and weight of bags randomly during the production operation.

 c) Bonding of warehouse after completion of production/ inspection /t ...Read More

NA
87 Generic goods NORMAL

Pre despatch inspection will be carried out by any one of the buyer’s approved third party inspection agency (TPIA) viz. IRS / Lloyds /RITES/ Bureau Veritas / DNV and TURBOSCOPE VETCO. The scope of 3rd party inspection will be as follows:

 a) Inspection of quality as per order during production.

 b) Checking of bag specification and weight of bags randomly during the production operation.

 c) Bonding of warehouse after completion of production/ inspection /t ...Read More

NA
88 Generic goods NORMAL

Third Party Inspection (All test results to be documented and submitted to the buyer by the third party):

 (a) Third party inspection is to be carried out by any one of the buyer’s approved Third party inspection agency i.e. by IRS / Lloyds /RITES / Bureau Veritas / DNV and TUBOSCOPE VETCO.

 (b) Raw material inspection for chemical composition and mechanical properties as specified in BIS:1239(Part-1):Latest Edition.10% of number of heats of raw material and 10% of num ...Read More

NA
89 Generic goods NORMAL

(a) Third party inspection is to be carried out by BUYER’S approved Third party inspection agency i.e. by IRS / Lloyds /RITES / Bureau Veritas / DNV and TUBOSCOPE VETCO.

(b) Raw material inspection for Chemical composition & Mechanical Properties.

(c) Verification of certificate provided by the supplier for raw material from reputed manufacturer like TATA, SAIL, etc. specifying clearly suitability of material for manufacturing of pipe.

(d) Finished Tube Inspection: Checkin ...Read More

NA
90 Generic goods NORMAL Capability Maturity Model Integration (CMMI) for Software developments. NA
91 Certificates goods NORMAL ISO 9001: The bidder or the OEM of the offered products must have ISO 9001 certification. NA
92 Warranty goods SLA Warranty period of the supplied products shall be ${warrantyPeriod} from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Installati ...Read More Warranty period of the supplied products
Type: 1 years, 2 years, 3 years, 4 years, 5 years, as given in specifications
93 Generic goods NORMAL Issue of Free Issue Material (FIM): In case of certain fabrication contracts, the buyer shall provide Free Issue Material to the seller based on the tendering requirement. The Seller shall submit the necessary drawings/cutting for optimal utilization of FIM. Further, the Seller shall submit Indemnity Bond & Insurance Policy of equivalent value of FIM and shall be kept valid till such time the entire contract is executed and Material Accounting for the FIM is rendered by the form ...Read More NA
94 Generic goods NORMAL Quality surveillance:
1. Stores covered by the Contract shall be subjected to quality surveillance and inspection by the Purchaser’s authorised Inspector.
2. The Seller shall establish a quality surveillance and inspection plan in consultation with the Inspector or inspection agency and have it approved by the Purchaser before start of manufacture. The Seller shall give notice of readiness of Stores for inspection to the Inspector and shall perform all tests and inspecti 4. The Stores shall be offered by the Seller for inspection at such places as may be specified by the Inspector at the Seller\'s risk, expense and cost.
5. The stores received by the Purchaser will also be subject to inspection and test as may be considered necessary by the Inspector and his decision as regards rejection of Stores shall be final and binding on the Seller. If any stores are rejected as aforesaid without prejudice to the foregoing provision, the Purchaser shall be at liberty to: -
I. Allow the Seller to resubmit Stores in replacement of those rejected within a time specified by the Purchaser (which time shall become essence of the Contract), the contractor bearing the cost of freight for such replacement without being entitled to any extra payment thereof.
II. Buy the quantity of Stores rejected or other items of similar nature elsewhere without affecting the Seller\'s liability as regards the supply of any further consignment(s) due under the Contract, if the said Contract has not been cancelled or Terminate the total contract or portion thereof and recover damages from the Seller on that account.
6. Where consignments are required to be delivered / despatched after inspection by the Inspector as per the Contract, a Shipping Release"" issued by the Inspector shall be enclosed along with the delivery challan or other shipping documents viz. (Lorry Receipt, Railway Receipt) accompanying the consignments.
7. Test Certificates and Guarantee Certificates if required by the Inspector shall be obtained and furnished to him free of cost by the Seller and/or from the specified agency.'> ...Read More
NA
95 Generic goods NORMAL Fiscal Concessions for Nuclear Power Plant: Nuclear Power Project of capacity 440 MW or more have been notified by GOI for eligibility towards fiscal concessions. As such the goods required for setting up these projects are subject to ‘NIL’ Customs duty as per the extant policy of Government of India (vide Customs Notification No. 50/2017 dated 30-6-2017 and updated upto 05-12-2017 (in the list 32 at Sr. No. 602). In consideration of the aforesaid Fiscal Benefits, no customs ...Read More NA
96 Generic goods NORMAL Clause towards Civil Liability for Nuclear Damages: (CLND Act 2010 and Rule 2011)
In line with the CLND act section 17(a) and Rule 24 under Civil Liability for Nuclear Damage Rules, 2011:
The liability of the seller shall be to the extent of the value of the goods supplied or equivalent to the buyer\'s liability whichever is lesser

And

The duration of Seller\'s liability shall be limited to duration of initial license issued by AERB or the product liability p
And

The duration of Seller\'s liability shall be limited to duration of initial license issued by AERB or the product liability period, whichever is longer.'> ...Read More
NA
97 Generic goods NORMAL De-minimis Level: It may kindly be noted that NPCIL has no reservation about import procurement, if it is necessary, for subject of package. However, bidder shall ensure that items to be imported to India do not have US origin components above the de-minimis level. NA
98 Generic goods NORMAL Non- Disclosure: The OEM/bidder has to sign a Non-Disclosure agreement with the buyer for Software license products like Anti-Virus solutions etc. NA
99 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
100 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
101 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
102 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
103 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
104 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
105 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
106 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
107 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
108 Generic goods NORMAL PESCO Certificate: PESCO Certificate shall be mandatory for procurement of bid. NA
109 Generic MASTER NORMAL

In case the bidder is not able to furnish its audited financial statements on standalone entity basis, the unaudited unconsolidated financial statements of the bidder can be considered acceptable provided the bidder furnishes the following further documents on substantiation of its qualification:

 • Copies of the unaudited unconsolidated financial statements of the bidder along with copies of the audited consolidated financial statements of the Holding Company.

 • A ...Read More

NA
110 Generic goods NORMAL Weighment at NTPC end shall be final for accounting purpose. NA
111 Generic MASTER NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
112 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
113 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
114 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
115 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
116 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
117 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
118 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
119 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
120 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
121 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
122 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
123 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
124 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
125 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
126 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
127 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
128 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
129 Generic goods NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
130 Generic goods NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
131 Inspection goods NORMAL Testing of Sample: The testing of advance sample and bulk sample during PDI will be carried at the designated AHSP labs.When testing facilities are not available, the facilities of Govt labs/NABL/Accredited labs will be utilized. The testing charges outside the designated AHSP labs to be borne by seller\'s. NA
132 Bid Specific ATC MASTER SLA Buyer Added text based ATC clauses ${buyerTextField}. Buyer Added text based ATC clauses
Type: ALPHA_NUMERIC
133 Past Project Experience MASTER SLA

Commercial Experience Criteria for Goods:

For experience, the order(s) executed by the bidder, during the last five years ending on the last day of the month immediately preceding the month in which the last date of bid submission falls, should be considered as under:

Three orders each executed for “similar item” ${similarItem1} where executed value is not less than the amount equal to Rs. ${itemCost1}.
OR
Two orders each executed for “similar item” ${similarItem2} ...Read More

1. Three orders each executed for similar item
Type: ALPHA_NUMERIC
2. Executed value is not less than the amount equal to
Type: FLOAT
3. Two orders each executed for similar item
Type: ALPHA_NUMERIC
4. Execut ...Read More
134 Past Project Experience MASTER SLA

Commercial Experience Criteria for Service Contracts:

For experience, the single work executed by the bidder, as main or subcontractor, during any of the last five years ending on last day of the month immediately previous to the month in which the last date of bid submission (in case of extended bid submission date, original bid submission date shall be considered) falls should be considered as detailed below:

(a) Three similar successfully completed works ${similarItem1} each ...Read More

1. Three similar successfully completed works
Type: ALPHA_NUMERIC
2. Each costing not less than the amount equal to
Type: FLOAT
3. Two similar successfully completed works
Type: ALPHA_NUMERIC
4. Each costing ...Read More
135 Inspection goods NORMAL Materials shall be guaranteed for 12 months from the date of commissioning or 18 months from the date of supply whichever is earlier. NA
136 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
137 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
138 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
139 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
140 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
141 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
142 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
143 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
144 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
145 Purchase Preference (Centre) goods NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:

The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.11.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders for fa ...Read More

NA
146 Inspection goods SLA THIRD PARTY INSPECTION for IOCL:

Goods and Services shall be subjected to stage wise and final inspection by any of the IOCL approved Third Party Inspection (TPI) agency ${thirdPartyInspection}, and TPI charges are included in quoted prices, and no additional charges shall be paid by Owner.

It will be bidder’s responsibility to arrange for third party inspection and submit the third party inspection release note on time. No time extension shall be allowed by IOCL f ...Read More

1. Name of Third Party Inspection (TPI) agency
Type: ALPHA_NUMERIC
2. Upload the QAP File
Type: UPLOADPANEL
147 Bid Specific ATC MASTER SLA Buyer uploaded ATC document ${buyerAttachment}. Buyer uploaded ATC document
Type: UPLOADPANEL
148 Purchase Preference (Centre) services NORMAL Bid reserved for Make In India products: Procurement under this bid is reserved for purchase from Class 1 local suppliers as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local content to qualify as a class 1 local supplier is denoted in the bid document 50%. All bidders must upload a certificate from the OEM regarding the perc ...Read More NA
149 Purchase Preference (Centre) services NORMAL Preference to Make In India products (For bids less than 200 Crore):Preference shall be given to Class 1 local supplier as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local content to qualify as a Class 1 local supplier is denoted in the bid document 50%. If the bidder wants to avail the Purchase preference, the bidder must u ...Read More NA
150 Purchase Preference (Centre) services NORMAL Preference to Make In India products (for bids greater than 200 Crore) (can also be used in Bids less than 200 Crore but only after exemption by competent authority as defined in Deptt of Expenditure OM dated 28.5.2020): Preference shall be given to Class 1 local supplier as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local c ...Read More NA
151 Generic goods NORMAL OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 50 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity by up to 50% of the contracted  quantity during the currency of the contract at the contracted rates. Bidders are bound to accept the orders accordingly. NA
152 Bid Specific SOW services SLA Text Clause(s) ${buyerTextField} Buyer Added Scope of Work (SOW)
Type: ALPHA_NUMERIC
153 Bid Specific SOW services SLA File Attachment ${buyerAttachment}. Buyer Added Scope of Work (SOW) Attachment
Type: UPLOADPANEL
154 Bid Specific SLA services SLA Text Clause(s) ${buyerTextField} Buyer Added Bid Specific SLA
Type: ALPHA_NUMERIC
155 Bid Specific SLA services SLA File Attachment ${buyerAttachment}. Buyer Added Bid Specific SLA Attachment
Type: UPLOADPANEL
156 Inspection home_dome_bedc_bedc_bl24437430 SLA Pre-dispatch Inspection (PDI) of Blanket for CAPFs shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
157 Inspection home_dome_bedc_bedc_bl24437430 NORMAL Pre-dispatch Inspection (PDI) of Blanket for CAPFs shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
158 Inspection home_dome_bedc_bedc_bl24437430 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Blanket for CAPFs for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may c ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
159 Inspection home_dome_bedc_bedc_bl24437430 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Blanket for CAPFs along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwis ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
160 Inspection home_dome_bedc_bedc_bl24437430 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Blanket for CAPFs along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the recei ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
161 Inspection home_dome_bedc_bedc_bl24437430 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
162 Inspection home_appa_clot_clot_capf SLA Pre-dispatch Inspection (PDI) of Cap Fs Disruptive Jss shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
163 Inspection home_appa_clot_clot_capf NORMAL Pre-dispatch Inspection (PDI) of Cap Fs Disruptive Jss shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
164 Inspection home_appa_clot_clot_capf SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cap Fs Disruptive Jss for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer m ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
165 Inspection home_appa_clot_clot_capf SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cap Fs Disruptive Jss along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or othe ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
166 Inspection home_appa_clot_clot_capf SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cap Fs Disruptive Jss along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the r ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
167 Inspection home_appa_clot_clot_capf NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
168 Inspection home_dome_bedc_bedc_blan SLA Pre-dispatch Inspection (PDI) of Blankets Woolen Dyed Air Force Specification shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
169 Inspection home_dome_bedc_bedc_blan NORMAL Pre-dispatch Inspection (PDI) of Blankets Woolen Dyed Air Force Specification shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
170 Inspection home_dome_bedc_bedc_blan SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Blankets Woolen Dyed Air Force Specification for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescri ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
171 Inspection home_dome_bedc_bedc_blan SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Blankets Woolen Dyed Air Force Specification along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
172 Inspection home_dome_bedc_bedc_blan SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Blankets Woolen Dyed Air Force Specification along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate t ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
173 Inspection home_dome_bedc_bedc_blan NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
174 Inspection home_defe_pers_safe_sing SLA Pre-dispatch Inspection (PDI) of Single Texture White Rubberized Waterproof Nylon Fabric Rain Capes With Attached Hood shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
175 Inspection home_defe_pers_safe_sing NORMAL Pre-dispatch Inspection (PDI) of Single Texture White Rubberized Waterproof Nylon Fabric Rain Capes With Attached Hood shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
176 Inspection home_defe_pers_safe_sing SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Single Texture White Rubberized Waterproof Nylon Fabric Rain Capes With Attached Hood for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to sub ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
177 Inspection home_defe_pers_safe_sing SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Single Texture White Rubberized Waterproof Nylon Fabric Rain Capes With Attached Hood along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buye ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
178 Inspection home_defe_pers_safe_sing SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Single Texture White Rubberized Waterproof Nylon Fabric Rain Capes With Attached Hood along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspe ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
179 Inspection home_defe_pers_safe_sing NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
180 Inspection home_defe_pers_safe_wate SLA Pre-dispatch Inspection (PDI) of Water Proof Multi Purpose Rain Poncho With Convertibility As Bivouac - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: CIPET (0.5 % of total value of contract or Rs. 10,000/- per Man day whichever is higher), NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Se ...Read More
181 Inspection home_defe_pers_safe_wate NORMAL Pre-dispatch Inspection (PDI) of Water Proof Multi Purpose Rain Poncho With Convertibility As Bivouac - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
182 Inspection home_defe_pers_safe_wate SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Water Proof Multi Purpose Rain Poncho With Convertibility As Bivouac - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the adv ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
183 Inspection home_defe_pers_safe_wate SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Water Proof Multi Purpose Rain Poncho With Convertibility As Bivouac - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall com ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: CIPET (0.5 % of ...Read More
184 Inspection home_defe_pers_safe_wate SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Water Proof Multi Purpose Rain Poncho With Convertibility As Bivouac - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agenc ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
185 Inspection home_defe_pers_safe_wate NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
186 Inspection home_appa_clot_unif_cl22134351 SLA Pre-dispatch Inspection (PDI) of Cloth Gaberdine Disruptive Pattern/ Dyed - Uniforms shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
187 Inspection home_appa_clot_unif_cl22134351 NORMAL Pre-dispatch Inspection (PDI) of Cloth Gaberdine Disruptive Pattern/ Dyed - Uniforms shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
188 Inspection home_appa_clot_unif_cl22134351 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cloth Gaberdine Disruptive Pattern/ Dyed - Uniforms for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
189 Inspection home_appa_clot_unif_cl22134351 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cloth Gaberdine Disruptive Pattern/ Dyed - Uniforms along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the appr ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
190 Inspection home_appa_clot_unif_cl22134351 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cloth Gaberdine Disruptive Pattern/ Dyed - Uniforms along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly commun ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
191 Inspection home_appa_clot_unif_cl22134351 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
192 Inspection home_mine_fabr_wool_shir SLA Pre-dispatch Inspection (PDI) of Shirting Angola shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
193 Inspection home_mine_fabr_wool_shir NORMAL Pre-dispatch Inspection (PDI) of Shirting Angola shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
194 Inspection home_mine_fabr_wool_shir SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Shirting Angola for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may can ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
195 Inspection home_mine_fabr_wool_shir SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Shirting Angola along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
196 Inspection home_mine_fabr_wool_shir SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Shirting Angola along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receipt ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
197 Inspection home_mine_fabr_wool_shir NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
198 Inspection home_mine_fabr_spec_poly SLA Pre-dispatch Inspection (PDI) of Polyester Blend Shirting- As Per IS: 15852 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
199 Inspection home_mine_fabr_spec_poly NORMAL Pre-dispatch Inspection (PDI) of Polyester Blend Shirting- As Per IS: 15852 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
200 Inspection home_mine_fabr_spec_poly SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Polyester Blend Shirting- As Per IS: 15852 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribe ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
201 Inspection home_mine_fabr_spec_poly SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Polyester Blend Shirting- As Per IS: 15852 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of a ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
202 Inspection home_mine_fabr_spec_poly SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Polyester Blend Shirting- As Per IS: 15852 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
203 Inspection home_mine_fabr_spec_poly NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
204 Inspection home_appa_clot_unif_unif SLA Pre-dispatch Inspection (PDI) of Uniform Pc-Pv Suiting- As Per Is: 15853 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
205 Inspection home_appa_clot_unif_unif NORMAL Pre-dispatch Inspection (PDI) of Uniform Pc-Pv Suiting- As Per Is: 15853 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
206 Inspection home_appa_clot_unif_unif SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Uniform Pc-Pv Suiting- As Per Is: 15853 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed p ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
207 Inspection home_appa_clot_unif_unif SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Uniform Pc-Pv Suiting- As Per Is: 15853 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of adva ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
208 Inspection home_appa_clot_unif_unif SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Uniform Pc-Pv Suiting- As Per Is: 15853 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
209 Inspection home_appa_clot_unif_unif NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
210 Inspection home_mine_fabr_wool_twil SLA Pre-dispatch Inspection (PDI) of Twill Weave Wool Fabric Cloth Serge Dress-Is:2319-1987 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
211 Inspection home_mine_fabr_wool_twil NORMAL Pre-dispatch Inspection (PDI) of Twill Weave Wool Fabric Cloth Serge Dress-Is:2319-1987 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
212 Inspection home_mine_fabr_wool_twil SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Twill Weave Wool Fabric Cloth Serge Dress-Is:2319-1987 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within t ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
213 Inspection home_mine_fabr_wool_twil SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Twill Weave Wool Fabric Cloth Serge Dress-Is:2319-1987 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the a ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
214 Inspection home_mine_fabr_wool_twil SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Twill Weave Wool Fabric Cloth Serge Dress-Is:2319-1987 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly com ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
215 Inspection home_mine_fabr_wool_twil NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
216 Inspection home_appa_clot_unif_cl54043214 SLA Pre-dispatch Inspection (PDI) of Cloth Disruptive Polyester And Cotton ( 20:80 )- Uniform Cloth shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
217 Inspection home_appa_clot_unif_cl54043214 NORMAL Pre-dispatch Inspection (PDI) of Cloth Disruptive Polyester And Cotton ( 20:80 )- Uniform Cloth shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
218 Inspection home_appa_clot_unif_cl54043214 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cloth Disruptive Polyester And Cotton ( 20:80 )- Uniform Cloth for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
219 Inspection home_appa_clot_unif_cl54043214 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cloth Disruptive Polyester And Cotton ( 20:80 )- Uniform Cloth along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate abo ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
220 Inspection home_appa_clot_unif_cl54043214 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cloth Disruptive Polyester And Cotton ( 20:80 )- Uniform Cloth along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall prom ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
221 Inspection home_appa_clot_unif_cl54043214 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
222 Inspection home_appa_clot_coat_coat SLA Pre-dispatch Inspection (PDI) of Coat Combat Disruptive Detachable Lining shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
223 Inspection home_appa_clot_coat_coat NORMAL Pre-dispatch Inspection (PDI) of Coat Combat Disruptive Detachable Lining shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
224 Inspection home_appa_clot_coat_coat SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Coat Combat Disruptive Detachable Lining for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
225 Inspection home_appa_clot_coat_coat SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Coat Combat Disruptive Detachable Lining along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of adv ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
226 Inspection home_appa_clot_coat_coat SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Coat Combat Disruptive Detachable Lining along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to th ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
227 Inspection home_appa_clot_coat_coat NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
228 Inspection home_mine_fabr_spec_cott SLA Pre-dispatch Inspection (PDI) of Cotton Tape Newar- As Per Is: 1895 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
229 Inspection home_mine_fabr_spec_cott NORMAL Pre-dispatch Inspection (PDI) of Cotton Tape Newar- As Per Is: 1895 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
230 Inspection home_mine_fabr_spec_cott SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cotton Tape Newar- As Per Is: 1895 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
231 Inspection home_mine_fabr_spec_cott SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cotton Tape Newar- As Per Is: 1895 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance s ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
232 Inspection home_mine_fabr_spec_cott SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cotton Tape Newar- As Per Is: 1895 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buye ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
233 Inspection home_mine_fabr_spec_cott NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
234 Inspection home_dome_floo_rugs_cott SLA Pre-dispatch Inspection (PDI) of Handloom Cotton Durries- As Per Is: 1450 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
235 Inspection home_dome_floo_rugs_cott NORMAL Pre-dispatch Inspection (PDI) of Handloom Cotton Durries- As Per Is: 1450 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
236 Inspection home_dome_floo_rugs_cott SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Handloom Cotton Durries- As Per Is: 1450 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
237 Inspection home_dome_floo_rugs_cott SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Handloom Cotton Durries- As Per Is: 1450 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of adv ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
238 Inspection home_dome_floo_rugs_cott SLA Pre-dispatch Inspection (PDI) of Steel Folding Cot (As Per Drawing) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
239 Inspection home_dome_floo_rugs_cott SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Handloom Cotton Durries- As Per Is: 1450 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to th ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
240 Inspection home_dome_floo_rugs_cott NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
241 Inspection home_furn_acco_furn_st33865781 SLA Pre-dispatch Inspection (PDI) of Steel Folding Cot (As Per Drawing) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
242 Inspection home_furn_acco_furn_st33865781 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Handloom Cotton Durries- As Per Is: 1450 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to th ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
243 Inspection home_furn_acco_furn_st33865781 NORMAL Pre-dispatch Inspection (PDI) of Steel Folding Cot (As Per Drawing) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
244 Inspection home_furn_acco_furn_st33865781 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Steel Folding Cot (As Per Drawing) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
245 Inspection home_furn_acco_furn_st33865781 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Steel Folding Cot (As Per Drawing) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance s ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
246 Inspection home_furn_acco_furn_st33865781 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Steel Folding Cot (As Per Drawing) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buye ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
247 Inspection home_furn_acco_furn_st33865781 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
248 Inspection home_spor_camp_camp_li00422135 SLA Pre-dispatch Inspection (PDI) of Light Weight Ground Sheet- MHA shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
249 Inspection home_spor_camp_camp_li00422135 NORMAL Pre-dispatch Inspection (PDI) of Light Weight Ground Sheet- MHA shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
250 Inspection home_spor_camp_camp_li00422135 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Light Weight Ground Sheet- MHA for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, th ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
251 Inspection home_spor_camp_camp_li00422135 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Light Weight Ground Sheet- MHA along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sampl ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
252 Inspection home_spor_camp_camp_li00422135 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Light Weight Ground Sheet- MHA along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer ab ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
253 Inspection home_spor_camp_camp_li00422135 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
254 Inspection home_spor_camp_camp_synt SLA Pre-dispatch Inspection (PDI) of Synthetic Web Equipment Improved Version shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
255 Inspection home_spor_camp_camp_synt NORMAL Pre-dispatch Inspection (PDI) of Synthetic Web Equipment Improved Version shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
256 Inspection home_spor_camp_camp_synt SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Synthetic Web Equipment Improved Version for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
257 Inspection home_spor_camp_camp_synt SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Synthetic Web Equipment Improved Version along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of adv ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
258 Inspection home_spor_camp_camp_synt SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Synthetic Web Equipment Improved Version along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to th ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
259 Inspection home_spor_camp_camp_synt NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
260 Inspection home_defe_pers_safe_an06857353 SLA Pre-dispatch Inspection (PDI) of Anklet Web shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
261 Inspection home_defe_pers_safe_an06857353 NORMAL Pre-dispatch Inspection (PDI) of Anklet Web shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
262 Inspection home_defe_pers_safe_an06857353 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Anklet Web for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may cancel t ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
263 Inspection home_defe_pers_safe_an06857353 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Anklet Web along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to se ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
264 Inspection home_defe_pers_safe_an06857353 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Anklet Web along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receipt of a ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
265 Inspection home_defe_pers_safe_an06857353 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
266 Inspection home_appa_clot_unif_un65436687 SLA Pre-dispatch Inspection (PDI) of Uniform Jersey Woolen Ribbed V Neck Dgsd Specification shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
267 Inspection home_appa_clot_unif_un65436687 NORMAL Pre-dispatch Inspection (PDI) of Uniform Jersey Woolen Ribbed V Neck Dgsd Specification shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
268 Inspection home_appa_clot_unif_un65436687 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Uniform Jersey Woolen Ribbed V Neck Dgsd Specification for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within t ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
269 Inspection home_appa_clot_unif_un65436687 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Uniform Jersey Woolen Ribbed V Neck Dgsd Specification along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the a ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
270 Inspection home_appa_clot_unif_un65436687 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Uniform Jersey Woolen Ribbed V Neck Dgsd Specification along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly com ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
271 Inspection home_appa_clot_unif_un65436687 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
272 Inspection home_mate_cont_bags_bagk SLA Pre-dispatch Inspection (PDI) of Bag Kit Universal shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
273 Inspection home_mate_cont_bags_bagk NORMAL Pre-dispatch Inspection (PDI) of Bag Kit Universal shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
274 Inspection home_mate_cont_bags_bagk SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Bag Kit Universal for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may c ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
275 Inspection home_mate_cont_bags_bagk SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Bag Kit Universal along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwis ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
276 Inspection home_mate_cont_bags_bagk SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Bag Kit Universal along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the recei ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
277 Inspection home_mate_cont_bags_bagk NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
278 Inspection home_spor_camp_camp_li76256888 SLA Pre-dispatch Inspection (PDI) of Light Weight Sleeping Bag - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
279 Inspection home_spor_camp_camp_li76256888 NORMAL Pre-dispatch Inspection (PDI) of Light Weight Sleeping Bag - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
280 Inspection home_spor_camp_camp_li76256888 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Light Weight Sleeping Bag - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, t ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
281 Inspection home_spor_camp_camp_li76256888 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Light Weight Sleeping Bag - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance samp ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
282 Inspection home_spor_camp_camp_li76256888 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Light Weight Sleeping Bag - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer a ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
283 Inspection home_spor_camp_camp_li76256888 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
284 Inspection home_spor_camp_camp_slee SLA Pre-dispatch Inspection (PDI) of Sleeping Bag Mk 4 Jss Specification shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
285 Inspection home_spor_camp_camp_slee NORMAL Pre-dispatch Inspection (PDI) of Sleeping Bag Mk 4 Jss Specification shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
286 Inspection home_spor_camp_camp_slee SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Sleeping Bag Mk 4 Jss Specification for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed perio ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
287 Inspection home_spor_camp_camp_slee SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Sleeping Bag Mk 4 Jss Specification along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
288 Inspection home_spor_camp_camp_slee SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Sleeping Bag Mk 4 Jss Specification along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buy ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
289 Inspection home_spor_camp_camp_slee NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
290 Inspection home_mate_pack_bott_plas SLA Pre-dispatch Inspection (PDI) of Plastic Bottles Water Bottle With Carry Bag For Cpmf shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
291 Inspection home_mate_pack_bott_plas NORMAL Pre-dispatch Inspection (PDI) of Plastic Bottles Water Bottle With Carry Bag For Cpmf shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
292 Inspection home_mate_pack_bott_plas SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Plastic Bottles Water Bottle With Carry Bag For Cpmf for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
293 Inspection home_mate_pack_bott_plas SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Plastic Bottles Water Bottle With Carry Bag For Cpmf along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the app ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
294 Inspection home_mate_pack_bott_plas SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Plastic Bottles Water Bottle With Carry Bag For Cpmf along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly commu ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
295 Inspection home_mate_pack_bott_plas NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
296 Inspection home_mate_cont_stor_stee SLA Pre-dispatch Inspection (PDI) of Steel Trunk (As Per Drawing)-Is:36181996 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
297 Inspection home_mate_cont_stor_stee NORMAL Pre-dispatch Inspection (PDI) of Steel Trunk (As Per Drawing)-Is:36181996 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
298 Inspection home_mate_cont_stor_stee SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Steel Trunk (As Per Drawing)-Is:36181996 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
299 Inspection home_mate_cont_stor_stee SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Steel Trunk (As Per Drawing)-Is:36181996 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of adv ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
300 Inspection home_mate_cont_stor_stee SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Steel Trunk (As Per Drawing)-Is:36181996 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to th ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
301 Inspection home_mate_cont_stor_stee NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
302 Inspection home_appa_clot_unde_shor SLA Pre-dispatch Inspection (PDI) of Short Drawer Cotton - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
303 Inspection home_appa_clot_unde_shor NORMAL Pre-dispatch Inspection (PDI) of Short Drawer Cotton - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
304 Inspection home_appa_clot_unde_shor SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Short Drawer Cotton - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buy ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
305 Inspection home_appa_clot_unde_shor SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Short Drawer Cotton - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
306 Inspection home_appa_clot_unde_shor SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Short Drawer Cotton - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about t ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
307 Inspection home_appa_clot_unde_shor NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
308 Inspection home_dome_bedc_towe_cott SLA Pre-dispatch Inspection (PDI) of Cotton Towels- As Per IS: 7056 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
309 Inspection home_dome_bedc_towe_cott NORMAL Pre-dispatch Inspection (PDI) of Cotton Towels- As Per IS: 7056 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
310 Inspection home_dome_bedc_towe_cott SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cotton Towels- As Per IS: 7056 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, th ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
311 Inspection home_dome_bedc_towe_cott SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cotton Towels- As Per IS: 7056 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sampl ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
312 Inspection home_dome_bedc_towe_cott SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cotton Towels- As Per IS: 7056 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer ab ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
313 Inspection home_dome_bedc_towe_cott NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
314 Inspection home_appa_clot_unde_unde SLA Pre-dispatch Inspection (PDI) of Underpants Under Pant Thermal shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
315 Inspection home_appa_clot_unde_unde NORMAL Pre-dispatch Inspection (PDI) of Underpants Under Pant Thermal shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
316 Inspection home_appa_clot_unde_unde SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Underpants Under Pant Thermal for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
317 Inspection home_appa_clot_unde_unde SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Underpants Under Pant Thermal along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
318 Inspection home_appa_clot_unde_unde SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Underpants Under Pant Thermal along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer abo ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
319 Inspection home_appa_clot_unde_unde NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
320 Inspection home_appa_clot_unde_un26561870 SLA Pre-dispatch Inspection (PDI) of Undergarments Vest Thermal shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
321 Inspection home_appa_clot_unde_un26561870 NORMAL Pre-dispatch Inspection (PDI) of Undergarments Vest Thermal shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
322 Inspection home_appa_clot_unde_un26561870 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Undergarments Vest Thermal for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the bu ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
323 Inspection home_appa_clot_unde_un26561870 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Undergarments Vest Thermal along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
324 Inspection home_appa_clot_unde_un26561870 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Undergarments Vest Thermal along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
325 Inspection home_appa_clot_unde_un26561870 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
326 Inspection home_appa_clot_unif_capc SLA Pre-dispatch Inspection (PDI) of Cap Comforter Woollen Uniforms shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
327 Inspection home_appa_clot_unif_capc NORMAL Pre-dispatch Inspection (PDI) of Cap Comforter Woollen Uniforms shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
328 Inspection home_appa_clot_unif_capc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cap Comforter Woollen Uniforms for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, th ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
329 Inspection home_appa_clot_unif_capc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cap Comforter Woollen Uniforms along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sampl ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
330 Inspection home_appa_clot_unif_capc SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cap Comforter Woollen Uniforms along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer ab ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
331 Inspection home_appa_clot_unif_capc NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
332 Inspection home_appa_clot_unif_mult SLA Pre-dispatch Inspection (PDI) of Multipurpose Tactical Belt- Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
333 Inspection home_appa_clot_unif_mult NORMAL Pre-dispatch Inspection (PDI) of Multipurpose Tactical Belt- Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
334 Inspection home_appa_clot_unif_mult SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Multipurpose Tactical Belt- Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, t ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
335 Inspection home_appa_clot_unif_mult SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Multipurpose Tactical Belt- Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance samp ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
336 Inspection home_appa_clot_unif_mult SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Multipurpose Tactical Belt- Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer a ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
337 Inspection home_appa_clot_unif_mult NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
338 Inspection home_appa_clot_clot_wais SLA Pre-dispatch Inspection (PDI) of Waist Belt Nylon With Buckle And Rings For Facilitating Slithering/Rapping - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
339 Inspection home_appa_clot_clot_wais NORMAL Pre-dispatch Inspection (PDI) of Waist Belt Nylon With Buckle And Rings For Facilitating Slithering/Rapping - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
340 Inspection home_appa_clot_clot_wais SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Waist Belt Nylon With Buckle And Rings For Facilitating Slithering/Rapping - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit t ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
341 Inspection home_appa_clot_clot_wais SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Waist Belt Nylon With Buckle And Rings For Facilitating Slithering/Rapping - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer sha ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
342 Inspection home_appa_clot_clot_wais SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Waist Belt Nylon With Buckle And Rings For Facilitating Slithering/Rapping - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
343 Inspection home_appa_clot_clot_wais NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
344 Inspection home_dome_dome_dome_mugs SLA Pre-dispatch Inspection (PDI) of Mugs Stainless Steel Single Double Walled With Double Wall Moulded Handle shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
345 Inspection home_dome_dome_dome_mugs NORMAL Pre-dispatch Inspection (PDI) of Mugs Stainless Steel Single Double Walled With Double Wall Moulded Handle shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
346 Inspection home_dome_dome_dome_mugs SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Mugs Stainless Steel Single Double Walled With Double Wall Moulded Handle for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the adva ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
347 Inspection home_dome_dome_dome_mugs SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Mugs Stainless Steel Single Double Walled With Double Wall Moulded Handle along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall comm ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
348 Inspection home_dome_dome_dome_mugs SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Mugs Stainless Steel Single Double Walled With Double Wall Moulded Handle along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
349 Inspection home_dome_dome_dome_mugs NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
350 Inspection home_dome_dome_do03200135_ssco SLA Pre-dispatch Inspection (PDI) of Ss Compartmental Tray-Is:14756 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
351 Inspection home_dome_dome_do03200135_ssco NORMAL Pre-dispatch Inspection (PDI) of Ss Compartmental Tray-Is:14756 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
352 Inspection home_dome_dome_do03200135_ssco SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Ss Compartmental Tray-Is:14756 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, th ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
353 Inspection home_dome_dome_do03200135_ssco SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Ss Compartmental Tray-Is:14756 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sampl ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
354 Inspection home_dome_dome_do03200135_ssco SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Ss Compartmental Tray-Is:14756 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer ab ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
355 Inspection home_dome_dome_do03200135_ssco NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
356 Inspection home_dome_dome_do03200135_tray SLA Pre-dispatch Inspection (PDI) of Tray Mess Compartmented Ss Army Pattern shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
357 Inspection home_dome_dome_do03200135_tray NORMAL Pre-dispatch Inspection (PDI) of Tray Mess Compartmented Ss Army Pattern shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
358 Inspection home_dome_dome_do03200135_tray SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tray Mess Compartmented Ss Army Pattern for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed p ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
359 Inspection home_dome_dome_do03200135_tray SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tray Mess Compartmented Ss Army Pattern along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of adva ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
360 Inspection home_dome_dome_do03200135_tray SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Tray Mess Compartmented Ss Army Pattern along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
361 Inspection home_dome_dome_do03200135_tray NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
362 Inspection home_spor_camp_camp_tent SLA Pre-dispatch Inspection (PDI) of Tents Tent Extendable Frame Supported Complete With Accessories shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
363 Inspection home_spor_camp_camp_tent NORMAL Pre-dispatch Inspection (PDI) of Tents Tent Extendable Frame Supported Complete With Accessories shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
364 Inspection home_spor_camp_camp_tent SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tents Tent Extendable Frame Supported Complete With Accessories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
365 Inspection home_spor_camp_camp_tent SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tents Tent Extendable Frame Supported Complete With Accessories along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate ab ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
366 Inspection home_spor_camp_camp_tent SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Tents Tent Extendable Frame Supported Complete With Accessories along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall pro ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
367 Inspection home_spor_camp_camp_tent NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
368 Inspection home_spor_camp_camp_te72407105 SLA Pre-dispatch Inspection (PDI) of Tent Arctic Camping And Outdoor Equipment shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
369 Inspection home_spor_camp_camp_te72407105 NORMAL Pre-dispatch Inspection (PDI) of Tent Arctic Camping And Outdoor Equipment shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
370 Inspection home_spor_camp_camp_te72407105 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tent Arctic Camping And Outdoor Equipment for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
371 Inspection home_spor_camp_camp_te72407105 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tent Arctic Camping And Outdoor Equipment along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of ad ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
372 Inspection home_spor_camp_camp_te72407105 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Tent Arctic Camping And Outdoor Equipment along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to t ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
373 Inspection home_spor_camp_camp_te72407105 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
374 Inspection home_defe_pers_fall_ka07526048 SLA Pre-dispatch Inspection (PDI) of Karabiners Screw Type Mk-2(Defence) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
375 Inspection home_defe_pers_fall_ka07526048 NORMAL Pre-dispatch Inspection (PDI) of Karabiners Screw Type Mk-2(Defence) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
376 Inspection home_defe_pers_fall_ka07526048 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Karabiners Screw Type Mk-2(Defence) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed perio ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
377 Inspection home_defe_pers_fall_ka07526048 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Karabiners Screw Type Mk-2(Defence) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
378 Inspection home_defe_pers_fall_ka07526048 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Karabiners Screw Type Mk-2(Defence) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buy ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
379 Inspection home_defe_pers_fall_ka07526048 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
380 Inspection home_appa_lugg_purs_pu45636161 SLA Pre-dispatch Inspection (PDI) of Purses And Handbags And Bags Rucksack Thirty Liter shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
381 Inspection home_appa_lugg_purs_pu45636161 NORMAL Pre-dispatch Inspection (PDI) of Purses And Handbags And Bags Rucksack Thirty Liter shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
382 Inspection home_appa_lugg_purs_pu45636161 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Purses And Handbags And Bags Rucksack Thirty Liter for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the p ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
383 Inspection home_appa_lugg_purs_pu45636161 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Purses And Handbags And Bags Rucksack Thirty Liter along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the appro ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
384 Inspection home_appa_lugg_purs_pu45636161 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Purses And Handbags And Bags Rucksack Thirty Liter along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communi ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
385 Inspection home_appa_lugg_purs_pu45636161 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
386 Inspection home_appa_clot_slac_tr88257307 SLA Pre-dispatch Inspection (PDI) of Trousers Ecc (Combination Of Trousers Wind Cheater & Trousers Serge Polywool 1973 Pattern (Modified)) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
387 Inspection home_appa_clot_slac_tr88257307 NORMAL Pre-dispatch Inspection (PDI) of Trousers Ecc (Combination Of Trousers Wind Cheater & Trousers Serge Polywool 1973 Pattern (Modified)) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
388 Inspection home_appa_clot_slac_tr88257307 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Trousers Ecc (Combination Of Trousers Wind Cheater & Trousers Serge Polywool 1973 Pattern (Modified)) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the sel ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
389 Inspection home_appa_clot_slac_tr88257307 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Trousers Ecc (Combination Of Trousers Wind Cheater & Trousers Serge Polywool 1973 Pattern (Modified)) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of co ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
390 Inspection home_appa_clot_slac_tr88257307 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Trousers Ecc (Combination Of Trousers Wind Cheater & Trousers Serge Polywool 1973 Pattern (Modified)) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of con ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
391 Inspection home_appa_clot_slac_tr88257307 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
392 Inspection home_appa_clot_coat_ja30305563 SLA Pre-dispatch Inspection (PDI) of Jacket Wind Cheater - Defence shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
393 Inspection home_appa_clot_coat_ja30305563 NORMAL Pre-dispatch Inspection (PDI) of Jacket Wind Cheater - Defence shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
394 Inspection home_appa_clot_coat_ja30305563 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Jacket Wind Cheater - Defence for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
395 Inspection home_appa_clot_coat_ja30305563 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Jacket Wind Cheater - Defence along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
396 Inspection home_appa_clot_coat_ja30305563 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Jacket Wind Cheater - Defence along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer abo ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
397 Inspection home_appa_clot_coat_ja30305563 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
398 Inspection home_defe_publ_resc_bagc SLA Pre-dispatch Inspection (PDI) of Bag Carrying Rescue- Defence shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
399 Inspection home_defe_publ_resc_bagc NORMAL Pre-dispatch Inspection (PDI) of Bag Carrying Rescue- Defence shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
400 Inspection home_defe_publ_resc_bagc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Bag Carrying Rescue- Defence for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
401 Inspection home_defe_publ_resc_bagc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Bag Carrying Rescue- Defence along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
402 Inspection home_defe_publ_resc_bagc SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Bag Carrying Rescue- Defence along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer abou ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
403 Inspection home_defe_publ_resc_bagc NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
404 Inspection home_appa_lugg_purs_bagw SLA Pre-dispatch Inspection (PDI) of Bag Water Proof shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
405 Inspection home_appa_lugg_purs_bagw NORMAL Pre-dispatch Inspection (PDI) of Bag Water Proof shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
406 Inspection home_appa_lugg_purs_bagw SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Bag Water Proof for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may can ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
407 Inspection home_appa_lugg_purs_bagw SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Bag Water Proof along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
408 Inspection home_appa_lugg_purs_bagw SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Bag Water Proof along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receipt ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
409 Inspection home_appa_lugg_purs_bagw NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
410 Inspection home_appa_clot_clot_capg SLA Pre-dispatch Inspection (PDI) of Cap Glacier shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
411 Inspection home_appa_clot_clot_capg NORMAL Pre-dispatch Inspection (PDI) of Cap Glacier shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
412 Inspection home_appa_clot_clot_capg SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cap Glacier for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may cancel ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
413 Inspection home_appa_clot_clot_capg SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cap Glacier along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to s ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
414 Inspection home_appa_clot_clot_capg SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cap Glacier along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receipt of ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
415 Inspection home_appa_clot_clot_capg NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
416 Inspection home_mate_pa01167782_secu_co77617068 SLA Pre-dispatch Inspection (PDI) of Common And Special Proofed Tarpaulins- As Per Is: 2089/ Is: 2789 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
417 Inspection home_mate_pa01167782_secu_co77617068 NORMAL Pre-dispatch Inspection (PDI) of Common And Special Proofed Tarpaulins- As Per Is: 2089/ Is: 2789 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
418 Inspection home_mate_pa01167782_secu_co77617068 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Common And Special Proofed Tarpaulins- As Per Is: 2089/ Is: 2789 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sampl ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
419 Inspection home_mate_pa01167782_secu_co77617068 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Common And Special Proofed Tarpaulins- As Per Is: 2089/ Is: 2789 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate a ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
420 Inspection home_mate_pa01167782_secu_co77617068 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Common And Special Proofed Tarpaulins- As Per Is: 2089/ Is: 2789 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall pr ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
421 Inspection home_mate_pa01167782_secu_co77617068 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
422 Inspection home_dist_heat_heat_im38660238 SLA Pre-dispatch Inspection (PDI) of Improved Space Heating Device( Bukhari)-DIPAS, DRDO ( Approved By MHA) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
423 Inspection home_dist_heat_heat_im38660238 NORMAL Pre-dispatch Inspection (PDI) of Improved Space Heating Device( Bukhari)-DIPAS, DRDO ( Approved By MHA) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
424 Inspection home_dist_heat_heat_im38660238 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Improved Space Heating Device( Bukhari)-DIPAS, DRDO ( Approved By MHA) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
425 Inspection home_dist_heat_heat_im38660238 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Improved Space Heating Device( Bukhari)-DIPAS, DRDO ( Approved By MHA) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communi ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
426 Inspection home_dist_heat_heat_im38660238 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Improved Space Heating Device( Bukhari)-DIPAS, DRDO ( Approved By MHA) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency sh ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
427 Inspection home_dist_heat_heat_im38660238 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
428 Inspection home_mate_cont_cask_stee SLA Pre-dispatch Inspection (PDI) of Steel Barrel For Lubricant-IS:1783 (Q3 Category) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
429 Inspection home_mate_cont_cask_stee NORMAL Pre-dispatch Inspection (PDI) of Steel Barrel For Lubricant-IS:1783 (Q3 Category) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
430 Inspection home_mate_cont_cask_stee SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Steel Barrel For Lubricant-IS:1783 (Q3 Category) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the pre ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
431 Inspection home_mate_cont_cask_stee SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Steel Barrel For Lubricant-IS:1783 (Q3 Category) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approva ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
432 Inspection home_mate_cont_cask_stee SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Steel Barrel For Lubricant-IS:1783 (Q3 Category) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communica ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
433 Inspection home_mate_cont_cask_stee NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
434 Inspection home_dome_dome_do03200135_tinm SLA Pre-dispatch Inspection (PDI) of tin mesh aluminium alloy (Q3 Category) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Central Asia Private Ltd Delhi (Rs 15000 + 18% GST per Man day), ...Read More
435 Inspection home_dome_dome_do03200135_tinm NORMAL Pre-dispatch Inspection (PDI) of tin mesh aluminium alloy (Q3 Category) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
436 Inspection home_dome_dome_do03200135_tinm SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of tin mesh aluminium alloy (Q3 Category) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed pe ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
437 Inspection home_dome_dome_do03200135_tinm SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of tin mesh aluminium alloy (Q3 Category) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advan ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: MSME (1.5% of t ...Read More
438 Inspection home_dome_dome_do03200135_tinm SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of tin mesh aluminium alloy (Q3 Category) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
439 Inspection home_dome_dome_do03200135_tinm NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
440 Inspection home_spor_camp_camp_mo42733832 SLA Pre-dispatch Inspection (PDI) of Mosquito Nets- As Per Is: 9886 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: CIPET (0.5 % of total value of contract or Rs. 10,000/- per Man day whichever is higher), NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Se ...Read More
441 Inspection home_spor_camp_camp_mo42733832 NORMAL Pre-dispatch Inspection (PDI) of Mosquito Nets- As Per Is: 9886 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
442 Inspection home_spor_camp_camp_mo42733832 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Mosquito Nets- As Per Is: 9886 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, th ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
443 Inspection home_spor_camp_camp_mo42733832 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Mosquito Nets- As Per Is: 9886 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sampl ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: CIPET (0.5 % of ...Read More
444 Inspection home_spor_camp_camp_mo42733832 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Mosquito Nets- As Per Is: 9886 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer ab ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
445 Inspection home_spor_camp_camp_mo42733832 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
446 Inspection home_spor_camp_camp_anti SLA Pre-dispatch Inspection (PDI) of Anti Mosquito Veil shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: CIPET (0.5 % of total value of contract or Rs. 10,000/- per Man day whichever is higher), NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Se ...Read More
447 Inspection home_spor_camp_camp_anti NORMAL Pre-dispatch Inspection (PDI) of Anti Mosquito Veil shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
448 Inspection home_spor_camp_camp_anti SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Anti Mosquito Veil for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
449 Inspection home_spor_camp_camp_anti SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Anti Mosquito Veil along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwi ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: CIPET (0.5 % of ...Read More
450 Inspection home_spor_camp_camp_anti SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Anti Mosquito Veil along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the rece ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
451 Inspection home_spor_camp_camp_anti NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
452 Inspection home_appa_clot_hosi_hand SLA Pre-dispatch Inspection (PDI) of Hand Gloves Woolen Knitted shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
453 Inspection home_appa_clot_hosi_hand NORMAL Pre-dispatch Inspection (PDI) of Hand Gloves Woolen Knitted shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
454 Inspection home_appa_clot_hosi_hand SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Hand Gloves Woolen Knitted for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the bu ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
455 Inspection home_appa_clot_hosi_hand SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Hand Gloves Woolen Knitted along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
456 Inspection home_appa_clot_hosi_hand SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Hand Gloves Woolen Knitted along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
457 Inspection home_appa_clot_hosi_hand NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
458 Inspection home_appa_clot_clot_capc SLA Pre-dispatch Inspection (PDI) of Cap Comforter shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
459 Inspection home_appa_clot_clot_capc NORMAL Pre-dispatch Inspection (PDI) of Cap Comforter shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
460 Inspection home_appa_clot_clot_capc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cap Comforter for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may cance ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
461 Inspection home_appa_clot_clot_capc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cap Comforter along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
462 Inspection home_appa_clot_clot_capc SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cap Comforter along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receipt o ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
463 Inspection home_appa_clot_clot_capc NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
464 Inspection home_appa_clot_coat_nylo SLA Pre-dispatch Inspection (PDI) of Nylon Life Jacket - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
465 Inspection home_appa_clot_coat_nylo NORMAL Pre-dispatch Inspection (PDI) of Nylon Life Jacket - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
466 Inspection home_appa_clot_coat_nylo SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Nylon Life Jacket - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
467 Inspection home_appa_clot_coat_nylo SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Nylon Life Jacket - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ot ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
468 Inspection home_appa_clot_coat_nylo SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Nylon Life Jacket - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
469 Inspection home_appa_clot_coat_nylo NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
470 Inspection home_mate_mate_lift_ta24684502 SLA Pre-dispatch Inspection (PDI) of Tactical 3 Point Sling Universal- As Per Is: 16725 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
471 Inspection home_mate_mate_lift_ta24684502 NORMAL Pre-dispatch Inspection (PDI) of Tactical 3 Point Sling Universal- As Per Is: 16725 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
472 Inspection home_mate_mate_lift_ta24684502 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tactical 3 Point Sling Universal- As Per Is: 16725 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the p ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
473 Inspection home_mate_mate_lift_ta24684502 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tactical 3 Point Sling Universal- As Per Is: 16725 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the appro ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
474 Inspection home_mate_mate_lift_ta24684502 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Tactical 3 Point Sling Universal- As Per Is: 16725 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communi ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
475 Inspection home_mate_mate_lift_ta24684502 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
476 Inspection home_spor_camp_camp_mult SLA Pre-dispatch Inspection (PDI) of Multipurpose Light Weight Load Bearing Frame With Carrier Facilities And Convertibility As Stretcher shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
477 Inspection home_spor_camp_camp_mult NORMAL Pre-dispatch Inspection (PDI) of Multipurpose Light Weight Load Bearing Frame With Carrier Facilities And Convertibility As Stretcher shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
478 Inspection home_spor_camp_camp_mult SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Multipurpose Light Weight Load Bearing Frame With Carrier Facilities And Convertibility As Stretcher for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the sell ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
479 Inspection home_spor_camp_camp_mult SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Multipurpose Light Weight Load Bearing Frame With Carrier Facilities And Convertibility As Stretcher along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of con ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
480 Inspection home_spor_camp_camp_mult SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Multipurpose Light Weight Load Bearing Frame With Carrier Facilities And Convertibility As Stretcher along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of cont ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
481 Inspection home_spor_camp_camp_mult NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
482 Inspection home_mine_fabr_spec_clot SLA Pre-dispatch Inspection (PDI) of Cloth Disruptive Pattern Nyco shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
483 Inspection home_mine_fabr_spec_clot NORMAL Pre-dispatch Inspection (PDI) of Cloth Disruptive Pattern Nyco shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
484 Inspection home_mine_fabr_spec_clot SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cloth Disruptive Pattern Nyco for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
485 Inspection home_mine_fabr_spec_clot SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cloth Disruptive Pattern Nyco along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
486 Inspection home_mine_fabr_spec_clot SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cloth Disruptive Pattern Nyco along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer abo ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
487 Inspection home_mine_fabr_spec_clot NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
488 Inspection home_spor_camp_camp_pouc SLA Pre-dispatch Inspection (PDI) of Pouch For Ammunition And Grenades shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
489 Inspection home_spor_camp_camp_pouc NORMAL Pre-dispatch Inspection (PDI) of Pouch For Ammunition And Grenades shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
490 Inspection home_spor_camp_camp_pouc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Pouch For Ammunition And Grenades for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
491 Inspection home_spor_camp_camp_pouc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Pouch For Ammunition And Grenades along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sa ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
492 Inspection home_spor_camp_camp_pouc SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Pouch For Ammunition And Grenades along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
493 Inspection home_spor_camp_camp_pouc NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
494 Inspection home_appa_clot_clot_ju36240861 SLA Pre-dispatch Inspection (PDI) of Jungle Floppy Hat - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
495 Inspection home_appa_clot_clot_ju36240861 NORMAL Pre-dispatch Inspection (PDI) of Jungle Floppy Hat - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
496 Inspection home_appa_clot_clot_ju36240861 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Jungle Floppy Hat - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
497 Inspection home_appa_clot_clot_ju36240861 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Jungle Floppy Hat - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ot ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
498 Inspection home_appa_clot_clot_ju36240861 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Jungle Floppy Hat - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
499 Inspection home_appa_clot_clot_ju36240861 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
500 Inspection home_appa_lugg_purs_hydr SLA Pre-dispatch Inspection (PDI) of Hydration Pack shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
501 Inspection home_appa_lugg_purs_hydr NORMAL Pre-dispatch Inspection (PDI) of Hydration Pack shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
502 Inspection home_appa_lugg_purs_hydr SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Hydration Pack for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may canc ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
503 Inspection home_appa_lugg_purs_hydr SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Hydration Pack along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise t ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
504 Inspection home_appa_lugg_purs_hydr SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Hydration Pack along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receipt ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
505 Inspection home_appa_lugg_purs_hydr NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
506 Inspection home_appa_clot_swea_card SLA Pre-dispatch Inspection (PDI) of Cardigan ( Open Front ) - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
507 Inspection home_appa_clot_swea_card NORMAL Pre-dispatch Inspection (PDI) of Cardigan ( Open Front ) - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
508 Inspection home_appa_clot_swea_card SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cardigan ( Open Front ) - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
509 Inspection home_appa_clot_swea_card SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cardigan ( Open Front ) - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
510 Inspection home_appa_clot_swea_card SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cardigan ( Open Front ) - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer abo ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
511 Inspection home_appa_clot_swea_card NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
512 Inspection home_appa_clot_unif_clot SLA Pre-dispatch Inspection (PDI) of Cloth For Raf Dangree shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
513 Inspection home_appa_clot_unif_clot NORMAL Pre-dispatch Inspection (PDI) of Cloth For Raf Dangree shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
514 Inspection home_appa_clot_unif_clot SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cloth For Raf Dangree for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer m ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
515 Inspection home_appa_clot_unif_clot SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Cloth For Raf Dangree along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or othe ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
516 Inspection home_appa_clot_unif_clot SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Cloth For Raf Dangree along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the r ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
517 Inspection home_appa_clot_unif_clot NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
518 Inspection home_defe_pers_safe_ghil SLA Pre-dispatch Inspection (PDI) of Ghillie Suit - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
519 Inspection home_defe_pers_safe_ghil NORMAL Pre-dispatch Inspection (PDI) of Ghillie Suit - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
520 Inspection home_defe_pers_safe_ghil SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Ghillie Suit - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
521 Inspection home_defe_pers_safe_ghil SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Ghillie Suit - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwi ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
522 Inspection home_defe_pers_safe_ghil SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Ghillie Suit - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the rece ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
523 Inspection home_defe_pers_safe_ghil NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
524 Inspection home_appa_foot_boot_bo40675858 SLA Pre-dispatch Inspection (PDI) of Boot Ankle Textile ( Jungle Boot ), Direct Injected Pu Sole shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: FDDI (1 % of total value of contract+18 % GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI)
525 Inspection home_appa_foot_boot_bo40675858 NORMAL Pre-dispatch Inspection (PDI) of Boot Ankle Textile ( Jungle Boot ), Direct Injected Pu Sole shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
526 Inspection home_appa_foot_boot_bo40675858 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Boot Ankle Textile ( Jungle Boot ), Direct Injected Pu Sole for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample wit ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
527 Inspection home_appa_foot_boot_bo40675858 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Boot Ankle Textile ( Jungle Boot ), Direct Injected Pu Sole along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: FDDI (1 % of to ...Read More
528 Inspection home_appa_foot_boot_bo40675858 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Boot Ankle Textile ( Jungle Boot ), Direct Injected Pu Sole along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptl ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
529 Inspection home_appa_foot_boot_bo40675858 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
530 Inspection home_defe_pers_sa55166021_tact SLA Pre-dispatch Inspection (PDI) of Tactical boot PU sole shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: FDDI (1 % of total value of contract+18 % GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI)
531 Inspection home_defe_pers_sa55166021_tact NORMAL Pre-dispatch Inspection (PDI) of Tactical boot PU sole shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
532 Inspection home_defe_pers_sa55166021_tact SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tactical boot PU sole for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer m ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
533 Inspection home_defe_pers_sa55166021_tact SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Tactical boot PU sole along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or othe ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: FDDI (1 % of to ...Read More
534 Inspection home_defe_pers_sa55166021_tact SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Tactical boot PU sole along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the r ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
535 Inspection home_defe_pers_sa55166021_tact NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
536 Inspection home_appa_foot_boot_bo60703154 SLA Pre-dispatch Inspection (PDI) of Boot Ankle Canvas- Defence shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: FDDI (1 % of total value of contract+18 % GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI)
537 Inspection home_appa_foot_boot_bo60703154 NORMAL Pre-dispatch Inspection (PDI) of Boot Ankle Canvas- Defence shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
538 Inspection home_appa_foot_boot_bo60703154 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Boot Ankle Canvas- Defence for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the bu ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
539 Inspection home_appa_foot_boot_bo60703154 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Boot Ankle Canvas- Defence along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: FDDI (1 % of to ...Read More
540 Inspection home_appa_foot_boot_bo60703154 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Boot Ankle Canvas- Defence along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
541 Inspection home_appa_foot_boot_bo60703154 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
542 Inspection home_defe_pers_sa55166021_allr SLA Pre-dispatch Inspection (PDI) of All Rubber Gum Boots And Ankle Boots For Occupational Purposes- As Per Is : 5557 (Part 2) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: FDDI (1 % of total value of contract+18 % GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI)
543 Inspection home_defe_pers_sa55166021_allr NORMAL Pre-dispatch Inspection (PDI) of All Rubber Gum Boots And Ankle Boots For Occupational Purposes- As Per Is : 5557 (Part 2) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
544 Inspection home_defe_pers_sa55166021_allr SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of All Rubber Gum Boots And Ankle Boots For Occupational Purposes- As Per Is : 5557 (Part 2) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
545 Inspection home_defe_pers_sa55166021_allr SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of All Rubber Gum Boots And Ankle Boots For Occupational Purposes- As Per Is : 5557 (Part 2) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: FDDI (1 % of to ...Read More
546 Inspection home_defe_pers_sa55166021_allr SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of All Rubber Gum Boots And Ankle Boots For Occupational Purposes- As Per Is : 5557 (Part 2) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The i ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
547 Inspection home_defe_pers_sa55166021_allr NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
548 Inspection home_defe_pers_sa55166021_haza SLA Pre-dispatch Inspection (PDI) of Industrial And Protective Rubber Knee And Ankle Boots- As Per Is: 5557 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: FDDI (1 % of total value of contract+18 % GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI)
549 Inspection home_defe_pers_sa55166021_haza NORMAL Pre-dispatch Inspection (PDI) of Industrial And Protective Rubber Knee And Ankle Boots- As Per Is: 5557 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
550 Inspection home_defe_pers_sa55166021_haza SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Industrial And Protective Rubber Knee And Ankle Boots- As Per Is: 5557 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
551 Inspection home_defe_pers_sa55166021_haza SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Industrial And Protective Rubber Knee And Ankle Boots- As Per Is: 5557 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communi ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: FDDI (1 % of to ...Read More
552 Inspection home_defe_pers_sa55166021_haza SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Industrial And Protective Rubber Knee And Ankle Boots- As Per Is: 5557 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency sh ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
553 Inspection home_defe_pers_sa55166021_haza NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
554 Inspection home_appa_clot_coat_co67022474 SLA Pre-dispatch Inspection (PDI) of Coat Parka - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
555 Inspection home_appa_clot_coat_co67022474 NORMAL Pre-dispatch Inspection (PDI) of Coat Parka - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
556 Inspection home_appa_clot_coat_co67022474 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Coat Parka - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may ca ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
557 Inspection home_appa_clot_coat_co67022474 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Coat Parka - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
558 Inspection home_appa_clot_coat_co67022474 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Coat Parka - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receip ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
559 Inspection home_appa_clot_coat_co67022474 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
560 Inspection home_mine_fabr_fabr_hess SLA Pre-dispatch Inspection (PDI) of Hessian Sand Bags- As Per IS: 9685 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
561 Inspection home_mine_fabr_fabr_hess NORMAL Pre-dispatch Inspection (PDI) of Hessian Sand Bags- As Per IS: 9685 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
562 Inspection home_mine_fabr_fabr_hess SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Hessian Sand Bags- As Per IS: 9685 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
563 Inspection home_mine_fabr_fabr_hess SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Hessian Sand Bags- As Per IS: 9685 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance s ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
564 Inspection home_mine_fabr_fabr_hess SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Hessian Sand Bags- As Per IS: 9685 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buye ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
565 Inspection home_mine_fabr_fabr_hess NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
566 Inspection home_manu_rope_secu_barb SLA Pre-dispatch Inspection (PDI) of Barbed Wire As Per Is 278 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
567 Inspection home_manu_rope_secu_barb NORMAL Pre-dispatch Inspection (PDI) of Barbed Wire As Per Is 278 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
568 Inspection home_manu_rope_secu_barb SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Barbed Wire As Per Is 278 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buy ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
569 Inspection home_manu_rope_secu_barb SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Barbed Wire As Per Is 278 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
570 Inspection home_manu_rope_secu_barb SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Barbed Wire As Per Is 278 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about t ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
571 Inspection home_manu_rope_secu_barb NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
572 Inspection home_manu_rope_secu_punc SLA Pre-dispatch Inspection (PDI) of Punched Tape Concertina Coils-Ptcc shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
573 Inspection home_manu_rope_secu_punc NORMAL Pre-dispatch Inspection (PDI) of Punched Tape Concertina Coils-Ptcc shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
574 Inspection home_manu_rope_secu_punc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Punched Tape Concertina Coils-Ptcc for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
575 Inspection home_manu_rope_secu_punc SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Punched Tape Concertina Coils-Ptcc along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance s ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
576 Inspection home_manu_rope_secu_punc SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Punched Tape Concertina Coils-Ptcc along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buye ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
577 Inspection home_manu_rope_secu_punc NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
578 Inspection home_mate_cont_tank_wate SLA Pre-dispatch Inspection (PDI) of Water Storage Tanks-Is 12701 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
579 Inspection home_mate_cont_tank_wate NORMAL Pre-dispatch Inspection (PDI) of Water Storage Tanks-Is 12701 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
580 Inspection home_mate_cont_tank_wate SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Water Storage Tanks-Is 12701 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
581 Inspection home_mate_cont_tank_wate SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Water Storage Tanks-Is 12701 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
582 Inspection home_mate_cont_tank_wate SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Water Storage Tanks-Is 12701 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer abou ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
583 Inspection home_mate_cont_tank_wate NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
584 Inspection home_stru_exte_roof_roof SLA Pre-dispatch Inspection (PDI) of Roofing Fabrics Pbs Roll-Is : 1322: 1993 shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
585 Inspection home_stru_exte_roof_roof NORMAL Pre-dispatch Inspection (PDI) of Roofing Fabrics Pbs Roll-Is : 1322: 1993 shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
586 Inspection home_stru_exte_roof_roof SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Roofing Fabrics Pbs Roll-Is : 1322: 1993 for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
587 Inspection home_stru_exte_roof_roof SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Roofing Fabrics Pbs Roll-Is : 1322: 1993 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of adv ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
588 Inspection home_stru_exte_roof_roof SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Roofing Fabrics Pbs Roll-Is : 1322: 1993 along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to th ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
589 Inspection home_stru_exte_roof_roof NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
590 Inspection home_mine_fabr_spec_eq77503852 SLA Pre-dispatch Inspection (PDI) of Equipment Camouflage Scrim Garnishing Dyed- Defence shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
591 Inspection home_mine_fabr_spec_eq77503852 NORMAL Pre-dispatch Inspection (PDI) of Equipment Camouflage Scrim Garnishing Dyed- Defence shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
592 Inspection home_mine_fabr_spec_eq77503852 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Equipment Camouflage Scrim Garnishing Dyed- Defence for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
593 Inspection home_mine_fabr_spec_eq77503852 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Equipment Camouflage Scrim Garnishing Dyed- Defence along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the appr ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
594 Inspection home_mine_fabr_spec_eq77503852 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Equipment Camouflage Scrim Garnishing Dyed- Defence along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly commun ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
595 Inspection home_mine_fabr_spec_eq77503852 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
596 Inspection home_mine_fabr_spec_equi SLA Pre-dispatch Inspection (PDI) of Equipment Camouflage Nets (Jute) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
597 Inspection home_mine_fabr_spec_equi NORMAL Pre-dispatch Inspection (PDI) of Equipment Camouflage Nets (Jute) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
598 Inspection home_mine_fabr_spec_equi SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Equipment Camouflage Nets (Jute) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
599 Inspection home_mine_fabr_spec_equi SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Equipment Camouflage Nets (Jute) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sam ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
600 Inspection home_mine_fabr_spec_equi SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Equipment Camouflage Nets (Jute) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
601 Inspection home_mine_fabr_spec_equi NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
602 Inspection home_appa_clot_clot_jung SLA Pre-dispatch Inspection (PDI) of Jungle Hats Fsmp shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
603 Inspection home_appa_clot_clot_jung NORMAL Pre-dispatch Inspection (PDI) of Jungle Hats Fsmp shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
604 Inspection home_appa_clot_clot_jung SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Jungle Hats Fsmp for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may ca ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
605 Inspection home_appa_clot_clot_jung SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Jungle Hats Fsmp along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
606 Inspection home_appa_clot_clot_jung SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Jungle Hats Fsmp along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receip ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
607 Inspection home_appa_clot_clot_jung NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
608 Inspection home_appa_clot_unif_peak SLA Pre-dispatch Inspection (PDI) of Peak Cap shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
609 Inspection home_appa_clot_unif_peak NORMAL Pre-dispatch Inspection (PDI) of Peak Cap shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
610 Inspection home_appa_clot_unif_peak SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Peak Cap for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may cancel the ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
611 Inspection home_appa_clot_unif_peak SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Peak Cap along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to sell ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
612 Inspection home_appa_clot_unif_peak SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Peak Cap along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receipt of adv ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
613 Inspection home_appa_clot_unif_peak NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
614 Inspection home_dome_dome_do41023644_dess SLA Pre-dispatch Inspection (PDI) of Dessert Spoon Ss-IS 990 (Q3 Category) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
615 Inspection home_dome_dome_do41023644_dess NORMAL Pre-dispatch Inspection (PDI) of Dessert Spoon Ss-IS 990 (Q3 Category) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
616 Inspection home_dome_dome_do41023644_dess SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Dessert Spoon Ss-IS 990 (Q3 Category) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed per ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
617 Inspection home_dome_dome_do41023644_dess SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Dessert Spoon Ss-IS 990 (Q3 Category) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advanc ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
618 Inspection home_dome_dome_do41023644_dess SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Dessert Spoon Ss-IS 990 (Q3 Category) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the b ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
619 Inspection home_dome_dome_do41023644_dess NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
620 Inspection home_defe_lawe_crow_riot SLA Pre-dispatch Inspection (PDI) of Riot Helmets shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: CIPET (0.5 % of total value of contract or Rs. 10,000/- per Man day whichever is higher), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per ...Read More
621 Inspection home_defe_lawe_crow_riot NORMAL Pre-dispatch Inspection (PDI) of Riot Helmets shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
622 Inspection home_defe_lawe_crow_riot SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Riot Helmets for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the buyer may cancel ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
623 Inspection home_defe_lawe_crow_riot SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Riot Helmets along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: CIPET (0.5 % of ...Read More
624 Inspection home_defe_lawe_crow_riot SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Riot Helmets along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about the receipt of ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
625 Inspection home_defe_lawe_crow_riot NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
626 Inspection home_de72544000_lawe_crow_poly SLA Pre-dispatch Inspection (PDI) of Poly Carbonate Shield(Mha) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: CIPET (0.5 % of total value of contract or Rs. 10,000/- per Man day whichever is higher), NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Se ...Read More
627 Inspection home_de72544000_lawe_crow_poly NORMAL Pre-dispatch Inspection (PDI) of Poly Carbonate Shield(Mha) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
628 Inspection home_de72544000_lawe_crow_poly SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Poly Carbonate Shield(Mha) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the bu ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
629 Inspection home_de72544000_lawe_crow_poly SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Poly Carbonate Shield(Mha) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: CIPET (0.5 % of ...Read More
630 Inspection home_de72544000_lawe_crow_poly SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Poly Carbonate Shield(Mha) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
631 Inspection home_de72544000_lawe_crow_poly NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
632 Inspection home_defe_lawe_crow_po77052461 SLA Pre-dispatch Inspection (PDI) of Poly Carbonate Lathi - MHA shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: CIPET (0.5 % of total value of contract or Rs. 10,000/- per Man day whichever is higher), NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Se ...Read More
633 Inspection home_defe_lawe_crow_po77052461 NORMAL Pre-dispatch Inspection (PDI) of Poly Carbonate Lathi - MHA shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
634 Inspection home_defe_lawe_crow_po77052461 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Poly Carbonate Lathi - MHA for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period, the bu ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
635 Inspection home_defe_lawe_crow_po77052461 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Poly Carbonate Lathi - MHA along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: CIPET (0.5 % of ...Read More
636 Inspection home_defe_lawe_crow_po77052461 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Poly Carbonate Lathi - MHA along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buyer about ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
637 Inspection home_defe_lawe_crow_po77052461 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
638 Inspection home_defe_pers_safe_full SLA Pre-dispatch Inspection (PDI) of Full Body Protector For Female (Ffbp) (Mha)/(Dipas-Drdo) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
639 Inspection home_defe_pers_safe_full NORMAL Pre-dispatch Inspection (PDI) of Full Body Protector For Female (Ffbp) (Mha)/(Dipas-Drdo) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
640 Inspection home_defe_pers_safe_full SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Full Body Protector For Female (Ffbp) (Mha)/(Dipas-Drdo) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
641 Inspection home_defe_pers_safe_full SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Full Body Protector For Female (Ffbp) (Mha)/(Dipas-Drdo) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
642 Inspection home_defe_pers_safe_full SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Full Body Protector For Female (Ffbp) (Mha)/(Dipas-Drdo) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly c ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
643 Inspection home_defe_pers_safe_full NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
644 Inspection home_defe_lawe_safe_full SLA Pre-dispatch Inspection (PDI) of Full Body Protector For Male (Mha) shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
645 Inspection home_defe_lawe_safe_full NORMAL Pre-dispatch Inspection (PDI) of Full Body Protector For Male (Mha) shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
646 Inspection home_defe_lawe_safe_full SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Full Body Protector For Male (Mha) for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescribed period ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
647 Inspection home_defe_lawe_safe_full SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of Full Body Protector For Male (Mha) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance s ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
648 Inspection home_defe_lawe_safe_full SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of Full Body Protector For Male (Mha) along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate to the buye ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
649 Inspection home_defe_lawe_safe_full NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
650 Inspection home_appa_clot_tshi_ts86086185 SLA Pre-dispatch Inspection (PDI) of T - Shirt Round Neck Disruptive Pattern - Mha shall be conducted by any of the following agency (as per Sellers option)${purchasePrefGivenToCat}.The inspection charges are indicated along with the name of the agency. The inspection charges are to be borne by the seller who should factor in the cost of PDI in the price quoted while bidding. No separate payment will be made to the seller for PDI. Inspection Agencies
Type: NITRA (1.5% of total value of contract + 18% GST for PDI), MSME (1.5% of total value of contract + 18% GST for PDI), SBG Services Tata Project Ltd Hyderabad (Rs 10000 + 18% GST per Man day), Quality Austria Centr ...Read More
651 Inspection home_appa_clot_tshi_ts86086185 NORMAL Pre-dispatch Inspection (PDI) of T - Shirt Round Neck Disruptive Pattern - Mha shall be conducted by Board of Officers nominated by the buyer organization. The expenses involved in inspection by the Board of Officers shall be borne by the buyer organization. However, the seller will arrange for testing/ inspection/ test reports etc. at the inspection premises at his/her cost. NA
652 Inspection home_appa_clot_tshi_ts86086185 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of T - Shirt Round Neck Disruptive Pattern - Mha for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval of advance sample or otherwise to the seller(s) concerned within a period of ${noOfDaysRcpt} days of receipt of advance sample.
In case the seller fails to submit the advance sample within the prescr ...Read More
1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
653 Inspection home_appa_clot_tshi_ts86086185 SLA The successful bidder after award of contract shall submit to the buyer, the advance sample ${advanceQuantity} of T - Shirt Round Neck Disruptive Pattern - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from any of following agencies/ laboratories ${purchasePrefGivenToCat} for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The buyer shall communicate about the approval o ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
4. Inspection Agencies
Type: NITRA (1.5% of ...Read More
654 Inspection home_appa_clot_tshi_ts86086185 SLA The successful bidder after award of contract shall submit to any of the designated inspection agency, the advance sample ${advanceQuantity} of T - Shirt Round Neck Disruptive Pattern - Mha along with test report proving conformity of the product to the governing specification (to be obtained by the seller at its cost), from designated agencies/ laboratories for approval, within a period of ${noOfDaysAwd} days from the date of award of contract. The inspection agency shall promptly communicate ...Read More 1. Advance sample quantity
Type: ALPHA_NUMERIC
2. No. of days from award of contract:
Type: INT
3. No. of days from receipt of advance sample
Type: INT
655 Inspection home_appa_clot_tshi_ts86086185 NORMAL In case designated Agency fails to approve or communicate approval or otherwise of advance sample / carry out pre-despatch inspection of stores within prescribed/ reasonable time; buyer may allow the seller to get the samples approved/ inspection done by any other NABL accredited agency. NA
656 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
657 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
658 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
659 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
660 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
661 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
662 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
663 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
664 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
665 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
666 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
667 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
668 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
669 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
670 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
671 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
672 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
673 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
674 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
675 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
676 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
677 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
678 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
679 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
680 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
681 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
682 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
683 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
684 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
685 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
686 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
687 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
688 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
689 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
690 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
691 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
692 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
693 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
694 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
695 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
696 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
697 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
698 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
699 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
700 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
701 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
702 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
703 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
704 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
705 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
706 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
707 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
708 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
709 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
710 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
711 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
712 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
713 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
714 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
715 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
716 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
717 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
718 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
719 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
720 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
721 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
722 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
723 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
724 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
725 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
726 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
727 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
728 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
729 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
730 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
731 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
732 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
733 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
734 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
735 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
736 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
737 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
738 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
739 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
740 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
741 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
742 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
743 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
744 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
745 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
746 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
747 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
748 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
749 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
750 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
751 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
752 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
753 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
754 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
755 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
756 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
757 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
758 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
759 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
760 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
761 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
762 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
763 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
764 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
765 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
766 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
767 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
768 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
769 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
770 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
771 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
772 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
773 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
774 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
775 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
776 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
777 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
778 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
779 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
780 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
781 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
782 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
783 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
784 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
785 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
786 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
787 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
788 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
789 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
790 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
791 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
792 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
793 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
794 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
795 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
796 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
797 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
798 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
799 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
800 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
801 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
802 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
803 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
804 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
805 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
806 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
807 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
808 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
809 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
810 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
811 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
812 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
813 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
814 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
815 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
816 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
817 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
818 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
819 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
820 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
821 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
822 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
823 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
824 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
825 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
826 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
827 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
828 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
829 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
830 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
831 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
832 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
833 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
834 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
835 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
836 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
837 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
838 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
839 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
840 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
841 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
842 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
843 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
844 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
845 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
846 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
847 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
848 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
849 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
850 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
851 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
852 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
853 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
854 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
855 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
856 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
857 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
858 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
859 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
860 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
861 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
862 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
863 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
864 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
865 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
866 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
867 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
868 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
869 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
870 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
871 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
872 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
873 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
874 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
875 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
876 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
877 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
878 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
879 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
880 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
881 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
882 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
883 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
884 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
885 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
886 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
887 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
888 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
889 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
890 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
891 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
892 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
893 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
894 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
895 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
896 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
897 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
898 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
899 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
900 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
901 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
902 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
903 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
904 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL RISK & EXPENSE
Rejection of Vehicles, as described above, or on account of Seller’s failing, declining, neglecting or delaying to comply with any requisition or otherwise not executing the same in accordance with the terms of the contract, the consignee or his / her successor in office shall be at liberty (without prejudice to any other remedy the Government may have on account of any claim for compensation against loss and inconvenience caused by such breach or non-performance of ...Read More
NA
905 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL RISK & EXPENSE
Extra expenditure, if any, on account of risk and expense purchase of the service made by the Government as above, will be deducted out of Seller’s payment of bills due to the Seller or from Performance Guarantee.
NA
906 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL RISK & EXPENSE
In the event of vehicle(s) arranged from other sources at risk & expense of the Seller in accordance with the terms of the contract, the amount of excess incidental expenditure, if any, involved in having to meet the complete demand out of Civil Hired Transport, will be in addition to the amount recoverable from Seller, for making such arrangement and be charged from Seller.
NA
907 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL RISK & EXPENSE
Seller agrees to pay hire charges for the Government transport supplied, if any, to Seller on request in case of failure of transport services due to any cause(s), at the rates fixed by the Government in accordance with orders which may be current at the time the transport is hired. Seller clearly understands that the aforesaid clause does not in any way bind or obliges the Government to provide the Seller with the services. The decision of the consignee in this matter ...Read More
NA
908 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-event-based-and-short-term- NORMAL The Risk & Expense Clause will be executed in offline mode as there is no functionality available on GeM. NA
909 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL RISK & EXPENSE
Rejection of Vehicles, as described above, or on account of Seller’s failing, declining, neglecting or delaying to comply with any requisition or otherwise not executing the same in accordance with the terms of the contract, the consignee or his / her successor in office shall be at liberty (without prejudice to any other remedy the Government may have on account of any claim for compensation against loss and inconvenience caused by such breach or non-performance of ...Read More
NA
910 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL RISK & EXPENSE
Extra expenditure, if any, on account of risk and expense purchase of the service made by the Government as above, will be deducted out of Seller’s payment of bills due to the Seller or from Performance Guarantee.
NA
911 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL RISK & EXPENSE
In the event of vehicle(s) arranged from other sources at risk & expense of the Seller in accordance with the terms of the contract, the amount of excess incidental expenditure, if any, involved in having to meet the complete demand out of Civil Hired Transport, will be in addition to the amount recoverable from Seller, for making such arrangement and be charged from Seller.
NA
912 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL RISK & EXPENSE
Seller agrees to pay hire charges for the Government transport supplied, if any, to Seller on request in case of failure of transport services due to any cause(s), at the rates fixed by the Government in accordance with orders which may be current at the time the transport is hired. Seller clearly understands that the aforesaid clause does not in any way bind or obliges the Government to provide the Seller with the services. The decision of the consignee in this matter ...Read More
NA
913 Vehicle Hiring(MoD) vehicle-hiring-service-ambulance-service-all-inclusive- NORMAL The Risk & Expense Clause will be executed in offline mode as there is no functionality available on GeM. NA
914 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL RISK & EXPENSE
Rejection of Vehicles, as described above, or on account of Seller’s failing, declining, neglecting or delaying to comply with any requisition or otherwise not executing the same in accordance with the terms of the contract, the consignee or his / her successor in office shall be at liberty (without prejudice to any other remedy the Government may have on account of any claim for compensation against loss and inconvenience caused by such breach or non-performance of ...Read More
NA
915 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL RISK & EXPENSE
Extra expenditure, if any, on account of risk and expense purchase of the service made by the Government as above, will be deducted out of Seller’s payment of bills due to the Seller or from Performance Guarantee.
NA
916 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL RISK & EXPENSE
In the event of vehicle(s) arranged from other sources at risk & expense of the Seller in accordance with the terms of the contract, the amount of excess incidental expenditure, if any, involved in having to meet the complete demand out of Civil Hired Transport, will be in addition to the amount recoverable from Seller, for making such arrangement and be charged from Seller.
NA
917 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL RISK & EXPENSE
Seller agrees to pay hire charges for the Government transport supplied, if any, to Seller on request in case of failure of transport services due to any cause(s), at the rates fixed by the Government in accordance with orders which may be current at the time the transport is hired. Seller clearly understands that the aforesaid clause does not in any way bind or obliges the Government to provide the Seller with the services. The decision of the consignee in this matter ...Read More
NA
918 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service-long-term NORMAL The Risk & Expense Clause will be executed in offline mode as there is no functionality available on GeM. NA
919 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL RISK & EXPENSE
Rejection of Vehicles, as described above, or on account of Seller’s failing, declining, neglecting or delaying to comply with any requisition or otherwise not executing the same in accordance with the terms of the contract, the consignee or his / her successor in office shall be at liberty (without prejudice to any other remedy the Government may have on account of any claim for compensation against loss and inconvenience caused by such breach or non-performance of ...Read More
NA
920 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL RISK & EXPENSE
Extra expenditure, if any, on account of risk and expense purchase of the service made by the Government as above, will be deducted out of Seller’s payment of bills due to the Seller or from Performance Guarantee.
NA
921 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL RISK & EXPENSE
In the event of vehicle(s) arranged from other sources at risk & expense of the Seller in accordance with the terms of the contract, the amount of excess incidental expenditure, if any, involved in having to meet the complete demand out of Civil Hired Transport, will be in addition to the amount recoverable from Seller, for making such arrangement and be charged from Seller.
NA
922 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL RISK & EXPENSE
Seller agrees to pay hire charges for the Government transport supplied, if any, to Seller on request in case of failure of transport services due to any cause(s), at the rates fixed by the Government in accordance with orders which may be current at the time the transport is hired. Seller clearly understands that the aforesaid clause does not in any way bind or obliges the Government to provide the Seller with the services. The decision of the consignee in this matter ...Read More
NA
923 Vehicle Hiring(MoD) vehicle-hiring-service-bus-hiring-service NORMAL The Risk & Expense Clause will be executed in offline mode as there is no functionality available on GeM. NA
924 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL RISK & EXPENSE
Rejection of Vehicles, as described above, or on account of Seller’s failing, declining, neglecting or delaying to comply with any requisition or otherwise not executing the same in accordance with the terms of the contract, the consignee or his / her successor in office shall be at liberty (without prejudice to any other remedy the Government may have on account of any claim for compensation against loss and inconvenience caused by such breach or non-performance of ...Read More
NA
925 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL RISK & EXPENSE
Extra expenditure, if any, on account of risk and expense purchase of the service made by the Government as above, will be deducted out of Seller’s payment of bills due to the Seller or from Performance Guarantee.
NA
926 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL RISK & EXPENSE
In the event of vehicle(s) arranged from other sources at risk & expense of the Seller in accordance with the terms of the contract, the amount of excess incidental expenditure, if any, involved in having to meet the complete demand out of Civil Hired Transport, will be in addition to the amount recoverable from Seller, for making such arrangement and be charged from Seller.
NA
927 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL RISK & EXPENSE
Seller agrees to pay hire charges for the Government transport supplied, if any, to Seller on request in case of failure of transport services due to any cause(s), at the rates fixed by the Government in accordance with orders which may be current at the time the transport is hired. Seller clearly understands that the aforesaid clause does not in any way bind or obliges the Government to provide the Seller with the services. The decision of the consignee in this matter ...Read More
NA
928 Vehicle Hiring(MoD) vehicle-hiring-service-monthly-basis-cab-taxi-hiring-services NORMAL The Risk & Expense Clause will be executed in offline mode as there is no functionality available on GeM. NA
929 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL RISK & EXPENSE
Rejection of Vehicles, as described above, or on account of Seller’s failing, declining, neglecting or delaying to comply with any requisition or otherwise not executing the same in accordance with the terms of the contract, the consignee or his / her successor in office shall be at liberty (without prejudice to any other remedy the Government may have on account of any claim for compensation against loss and inconvenience caused by such breach or non-performance of ...Read More
NA
930 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL RISK & EXPENSE
Extra expenditure, if any, on account of risk and expense purchase of the service made by the Government as above, will be deducted out of Seller’s payment of bills due to the Seller or from Performance Guarantee.
NA
931 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL RISK & EXPENSE
In the event of vehicle(s) arranged from other sources at risk & expense of the Seller in accordance with the terms of the contract, the amount of excess incidental expenditure, if any, involved in having to meet the complete demand out of Civil Hired Transport, will be in addition to the amount recoverable from Seller, for making such arrangement and be charged from Seller.
NA
932 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL RISK & EXPENSE
Seller agrees to pay hire charges for the Government transport supplied, if any, to Seller on request in case of failure of transport services due to any cause(s), at the rates fixed by the Government in accordance with orders which may be current at the time the transport is hired. Seller clearly understands that the aforesaid clause does not in any way bind or obliges the Government to provide the Seller with the services. The decision of the consignee in this matter ...Read More
NA
933 Vehicle Hiring(MoD) vehicle-hiring-service-short-term-cab-taxi-hiring-services NORMAL The Risk & Expense Clause will be executed in offline mode as there is no functionality available on GeM. NA
934 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL RISK & EXPENSE
Rejection of Vehicles, as described above, or on account of Seller’s failing, declining, neglecting or delaying to comply with any requisition or otherwise not executing the same in accordance with the terms of the contract, the consignee or his / her successor in office shall be at liberty (without prejudice to any other remedy the Government may have on account of any claim for compensation against loss and inconvenience caused by such breach or non-performance of ...Read More
NA
935 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL RISK & EXPENSE
Extra expenditure, if any, on account of risk and expense purchase of the service made by the Government as above, will be deducted out of Seller’s payment of bills due to the Seller or from Performance Guarantee.
NA
936 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL RISK & EXPENSE
In the event of vehicle(s) arranged from other sources at risk & expense of the Seller in accordance with the terms of the contract, the amount of excess incidental expenditure, if any, involved in having to meet the complete demand out of Civil Hired Transport, will be in addition to the amount recoverable from Seller, for making such arrangement and be charged from Seller.
NA
937 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL RISK & EXPENSE
Seller agrees to pay hire charges for the Government transport supplied, if any, to Seller on request in case of failure of transport services due to any cause(s), at the rates fixed by the Government in accordance with orders which may be current at the time the transport is hired. Seller clearly understands that the aforesaid clause does not in any way bind or obliges the Government to provide the Seller with the services. The decision of the consignee in this matter ...Read More
NA
938 Vehicle Hiring(MoD) vehicle-hiring-service-vehicle-hiring-service-per-vehicle-day-basis NORMAL The Risk & Expense Clause will be executed in offline mode as there is no functionality available on GeM. NA
939 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL RISK & EXPENSE
Rejection of Vehicles, as described above, or on account of Seller’s failing, declining, neglecting or delaying to comply with any requisition or otherwise not executing the same in accordance with the terms of the contract, the consignee or his / her successor in office shall be at liberty (without prejudice to any other remedy the Government may have on account of any claim for compensation against loss and inconvenience caused by such breach or non-performance of ...Read More
NA
940 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL RISK & EXPENSE
Extra expenditure, if any, on account of risk and expense purchase of the service made by the Government as above, will be deducted out of Seller’s payment of bills due to the Seller or from Performance Guarantee.
NA
941 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL RISK & EXPENSE
In the event of vehicle(s) arranged from other sources at risk & expense of the Seller in accordance with the terms of the contract, the amount of excess incidental expenditure, if any, involved in having to meet the complete demand out of Civil Hired Transport, will be in addition to the amount recoverable from Seller, for making such arrangement and be charged from Seller.
NA
942 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL RISK & EXPENSE
Seller agrees to pay hire charges for the Government transport supplied, if any, to Seller on request in case of failure of transport services due to any cause(s), at the rates fixed by the Government in accordance with orders which may be current at the time the transport is hired. Seller clearly understands that the aforesaid clause does not in any way bind or obliges the Government to provide the Seller with the services. The decision of the consignee in this matter ...Read More
NA
943 Vehicle Hiring(MoD) vehicle-hiring-service-vvip-cab-and-taxi-hiring-service-short-term NORMAL The Risk & Expense Clause will be executed in offline mode as there is no functionality available on GeM. NA
944 Certificates goods SLA To be eligible for award of contract, Bidder / OEM must possess following Certificates / Test Reports on the date of bid opening (to be uploaded with bid): ${bidOpening}. Certificates / Test Reports on the date of bid opening
Type: ALPHA_NUMERIC
945 Generic goods SLA For Supply of Chemicals/Gases etc. in Cylinders, Bidders have to provide free rental period of ${rentalPeriod} days for supplied cylinders. Bidders have to Provide Free Rental Period in Days
Type: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
946 Human Resource Service goods NORMAL Prohibition from seeking deposits or security amounts: Seeking any deposits or security amounts from the deployed resource or any other form of monetary acceptance by the service provider is strictly prohibited. If any such complaint is received, incident will be raised on GeM portal for suitable action as per Incident Management Policy of GeM. In addition, buyer department may separately initiate suitable penal action as per their laid down norms. NA
947 Generic goods NORMAL While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST. NA
948 Generic goods NORMAL Supplier shall ensure that the Invoice is raised in the name of Consignee with GSTIN of Consignee only. NA
949 Generic goods SLA NON DISCLOSURE DECLARATION CERTIFICATE (On Bidder Letter Head) to be uploaded with bid:

1. I M/s. ${nameMs} hereby declare that I shall not disclose the contract or any provision, specification, plan, design, pattern, sample or information thereof to any third party during and after expiry of Contract.

2. If defying the norms as per the Contract a legal action may be taken against me as per the existing Rules.

Place enter name(M/s.)
Type: ALPHA_NUMERIC
950 Generic goods NORMAL

The scope of work involves placement of filled gas cylinders in position for connecting to manifold and removal of empty cylinders after disconnecting from the manifold, as directed by buyer’s authorized representatives.

 a) Collection of empty cylinders from CSL

 b) Loading / Unloading of cylinders at CSL

NA
951 Generic goods NORMAL Loading and Unloading at yard will be under the scope of the supplier. NA
952 Generic goods SLA Whereever Essentiality Certificate is applicable (PEL/ML), successful bidder should provide Proforma Invoice for processeing for EC application and material should be dispatche after receiving of EC rom DGH. In view of the same, an ATC may be incorporated in GeM, viz, "BIDDER/OEM must provide Proforma Invoice for processeing for EC application within ${ecApplication} days from date of issue of GeM Contract and material should be dispatche after receiving of EC rom DGH." BIDDER/OEM must provide Proforma Invoice for processeing for EC application
Type: ALPHA_NUMERIC
953 Generic goods SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
954 Generic goods NORMAL Indemnity / Insurance for FIM: The bidders shall provide the Indemnity bond and Insurance Policy corresponding to the value of the Free Issue Material (Buyer’s materials) being issued to the Seller for Contract performance in cases involving Gas cylinders refilling, Repair of equipment/ Instruments/, calibration of items, etc. NA
955 Generic MASTER NORMAL Products supplied shall be nontoxic and harmless to health. In the case of toxic materials, Material Safety Data Sheet may be furnished along with the material. NA
956 Generic MASTER NORMAL The service provider shall comply with ISO 27001: 2018 for Information Technology Services. The service provider shall also ensure that the certificate is valid till the validity of contract. NA
957 Purchase Preference (Centre) MASTER NORMAL Procurement under this bid is reserved for purchase from Micro and Small Enterprises whose credentials are validated online through Udyog Aadhaar/URC for that product/service category. If the bidder wants to avail the reservation benefit, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are excluded from the purview of Public Procurement Policy for Micro and Small Enterprises. In respect of bid for Services, the bidder must be the Service pro ...Read More NA
958 Generic MASTER NORMAL WORLD BANK TERMS AND CONDITIONS: Special Terms and Conditions as defined by world bank at click here will also be applicable. APPLICABLE ONLY IN CASE OF WORLD BANK FUNDED PROJECTS. NA
959 Payment services NORMAL PAYMENT OF SALARIES AND WAGES: Service Provider is required to pay Salaries / wages of contracted staff deployed at buyer location first i.e. on their own and then claim payment from Buyer alongwith all statutory documents like, PF, ESIC etc. as well as the bank statement of payment done to staff. NA
960 Past Project Experience MASTER NORMAL Proof for Past Experience and Project Experience clause: For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:a. Contract copy along with Invoice(s) with self-certification by the bidder that service/supplies against the invoices have been executed.b. Execution certificate by client with contract value.c. Any other document in support of contract execution like Third Party Inspection releas ...Read More NA
961 Generic MASTER NORMAL Manufacturer Authorization:Wherever Authorised Distributors/service providers are submitting the bid, Authorisation Form /Certificate with OEM/Original Service Provider details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid NA
962 Generic home_defe_pers_sa55166021_sa04400215 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
963 Generic home_defe_pers_sa55166021_sa58016147 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
964 Generic home_mate_mate_lift_jack SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
965 Generic home_chem_expl_ex68538312_bulk SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
966 Generic home_chem_comp_orga_hydr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
967 Generic home_defe_fire_fire_aque SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
968 Generic home_powe_elec_elec_xl32325872 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
969 Generic home_powe_elec_elec_xlpe SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
970 Generic home_chem_comp_inor_bari SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
971 Generic home_mine_eart_clay_be02061006 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
972 Generic home_mini_oi73420062_dril_oilw SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
973 Generic pesticides-or--pest-repellents-acephate-75-sp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
974 Generic pesticides-or--pest-repellents-acetamiprid-20-sp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
975 Generic pesticides-or--pest-repellents-aluminium-phosphide-formulation SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
976 Generic pesticides-or--pest-repellents-alpha-napthalene-acetic-acid-4-5-sl SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
977 Generic pesticides-or--pest-repellents-atrazine-50-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
978 Generic pesticides-or--pest-repellents-beta-cyfluthrin-imidacloprid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
979 Generic pesticides-or--pest-repellents-buprofezin-25-sc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
980 Generic pesticides-or--pest-repellents-carbendazim-12-mancozeb-63-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
981 Generic pesticides-or--pest-repellents-carbendazim-50-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
982 Generic pesticides-or--pest-repellents-cartap-hydrochloride-4-gr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
983 Generic pesticides-or--pest-repellents-chlorantraniliprole-18-5-sc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
984 Generic pesticides-or--pest-repellents-chlorpyrifos-20-emulsifiable-concentrates SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
985 Generic pesticides-or--pest-repellents-clodinafop-propargyl-15-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
986 Generic pesticides-or--pest-repellents-copper-oxychloride-50-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
987 Generic pesticides-or--pest-repellents-cypermethrin-25-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
988 Generic pesticides-or--pest-repellents-deltamethrin-2-5-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
989 Generic pesticides-or--pest-repellents-diafenthiuron-50-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
990 Generic pesticides-or--pest-repellents-dimethoate-30-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
991 Generic pesticides-or--pest-repellents-emmamectine-benzoate-5-sg SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
992 Generic pesticides-or--pest-repellents-ethyl-ester-38-ec-2-4-d- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
993 Generic pesticides-or--pest-repellents-fipronil-0-3-granule SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
994 Generic pesticides-or--pest-repellents-flonicamid-50-wg SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
995 Generic pesticides-or--pest-repellents-flubendiamide-39-5-sc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
996 Generic pesticides-or--pest-repellents-glyphosate-41-si SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
997 Generic building-and-facility-construction-and-maintenance-services-building-and-facility-maintenance-and-repair-services-pest-control-helicoverpa-lure SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
998 Generic pesticides-or--pest-repellents-hexaconazole-5-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
999 Generic pesticides-or--pest-repellents-imazethapyr-10-sl SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1000 Generic pesticides-or--pest-repellents-imidacloprid-17-8-sl SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1001 Generic pesticides-or--pest-repellents-malathion-50-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1002 Generic pesticides-or--pest-repellents-mancozeb-75-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1003 Generic pesticides-or--pest-repellents-metalaxyl-8-mancozeb-64-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1004 Generic pesticides-or--pest-repellents-monocrotophos-36-sl SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1005 Generic waxes-and-oils-oils-neem-kernel-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1006 Generic pesticides-or--pest-repellents-pendimethalin-30-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1007 Generic flying-insect-control-traps--fly-catcher SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1008 Generic pesticides-or--pest-repellents-pretilachlor-50-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1009 Generic pesticides-or--pest-repellents-profenofos-50-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1010 Generic pesticides-or--pest-repellents-propiconazole-25-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1011 Generic pesticides-or--pest-repellents-pyriproxyfen-defence SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1012 Generic pesticides-or--pest-repellents-sodium-acifluorfen-16-5-clodinafop-propargyl-8-ec SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1013 Generic pesticides-or--pest-repellents-spinosad-45-sc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1014 Generic mineral-and-textile-and-inedible-plant-and-animal-materialsold-minerals-and-ores-and-metals-minerals-sulphur-powder SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1015 Generic pesticides-or--pest-repellents-sulfosulfuron-75-wg SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1016 Generic pesticides-or--pest-repellents-thiamethoxam-25-wg SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1017 Generic pesticides-or--pest-repellents-thiram-75-ws SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1018 Generic pesticides-or--pest-repellents-trichoderma-viride-1-wp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1019 Generic live-plant-and-animal-material-and-accessories-and-supplies-fertilizers-and-plant-nutrients-and-herbicides-organic-fertilizers-and-plant-nutrients-rhizobium-inocultants-bio-fertilizer- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1020 Generic live-plant-and-animal-material-and-accessories-and-supplies-fertilizers-and-plant-nutrients-and-herbicides-organic-fertilizers-and-plant-nutrients-phosphate-solubilizing-bacteria SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1021 Generic services NORMAL OPTION CLAUSE: The buyer can increase or decrease the contract quantity or contract duration up to 25 percent at the time of issue of the contract. However, once the contract is issued, contract quantity or contract duration can only be increased up to 25 percent. Bidders are bound to accept the revised quantity or duration NA
1022 Generic services NORMAL OPTION CLAUSE: The buyer can increase or decrease the contract quantity or contract duration up to 50 percent at the time of issue of the contract. However, once the contract is issued, contract quantity or contract duration can only be increased up to 50 percent. Bidders are bound to accept the revised quantity or duration. NA
1023 Generic packaging-materials-packaging-boxes-and-bags-and-pouches-dw-jute-tarpaulin-bags-national-seed-corporation SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1024 Generic bags-pp-plastic-woven-non-laminated-bags-for-seed-packaging-version-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1025 Generic pp-plastic-woven-non-laminated-bags-seed-packaging/pp-plastic-woven-non-laminated-bags-seed-packaging SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1026 Generic packaging-materials-packaging-boxes-and-bags-and-pouches-cotton-cloth-bag-for-seed-packing-capacity-from-0-75-kg-to-12-kg SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1027 Generic packaging-materials-packaging-boxes-and-bags-and-pouches-laminated-poly-pouches SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1028 Generic arts-and-crafts-equipment-and-accessories-and-supplies-paper-crafts-and-hand-made-papermaking-handmade-paper-label SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1029 Generic manufacture-of-transport-equipment-automotive-vehicles-pneumatic-tyres-for-defence SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1030 Generic manufacture-of-transport-equipment-automotive-vehicles-pneumatic-tyres-is-15627-rev-1 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1031 Generic writing-and-printing-paper-plain-copier-paper-is-14490-version-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1032 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Agents / Agency Commission
The Seller confirms and declares to the Buyer that the Seller is the original provider of the services referred to in this contract and has not engaged any individual or firm, whether Indian or foreign whatsoever, to intercede, facilitate or in any way to recommend to the Government of India or any of its functionaries, whether officially or unofficially, to the award of the contract to the Seller. The Seller agrees that if it is established at any time to ...Read More
NA
1033 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Access to Books of Accounts
In case it is found to the satisfaction of the Buyer that the Seller has engaged an Agent or paid commission or influenced any person to obtain the contract as described in clauses relating to Agents/Agency Commission and penalty for use of undue influence, the Seller, on a specific request of the Buyer, shall provide necessary information/ inspection of the relevant financial documents/information.
NA
1034 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Non- disclosure of Contract Documents
Except with the written consent of the Buyer/ Seller, other party shall not disclose the contract or any provision, specification or information thereof to any third party. Declaration duly signed on official Letter Head of the Seller as per format given at Annexure-I.
NA
1035 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Notices
Any notice required or permitted by the contract shall be written in the English language and may be delivered personally or may be sent by FAX or registered pre-paid mail / airmail, addressed to the last known address of the party to whom it is sent.
NA
1036 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Tax and Duties
Toll Tax/ Entry Tax/ Octroi Duty & Local Taxes. No separate payment would be made by the Buyer for Toll Taxes, Entry Taxes, Octroi duty and local Taxes, if any. The Seller should cater for these Taxes/ duties as part of Basic Rate quoted in the Bid.
NA
1037 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Rescission of Contract
The Buyer may rescind the contract by notice to Seller in writing:-
(a) If the Seller assigns or sublets the contract or, if Seller attempts to do so.
(b) If Seller or any of his / her agents or servants shall:-
(i) Be guilty of fraud in respect of the contract, or any other contract entered into by the Seller with Government; or
(ii) Directly or indirectly give, promise or offer any bribe, gratuity, gift, loan, perquisite reward or advantage pe ...Read More
NA
1038 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL LIGHT VEHS
Light Vehicle CHT supplied by Seller will have the following fitments at no extra cost to the Buyer:-
(a) One Star Plate on the front end of the vehicle and one Star Plate at the rear end the vehicle.
(b) Flag rod at the front end (nose) of the vehicle.
(c) Siren and Dome light (flashing) on the roof, if and when required.
(d) Fire extinguisher.(Buyer can add in Buyer Specified ATC)
NA
1039 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL BUSES (AC)
Should have 2 x 2 cushioned seats on either side of the aisle. The seats will have good quality cushion material.
1. Good quality clean seat covers should be provided.
2. Seats will be reclining push back with at least two stages of adjustment. Head rest is mandatory with each seat.
3. Driver compartment should be separated from passengers with a sound proof partition.
4. Drinking water should be available in the bus, consisting of a 40 ltrs stainless stee ...Read More
NA
1040 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL BUSES (NON AC)
Outer appearance of the bus should be compatible to a standard bus. It will not have dented body and window glasses will be intact. Buses with broken window panes will be rejected.
1. Seats will have good quality cushion.
2. Two emergency exits/break glass facility will be provided, i.e. one on each side.
3. Overhead luggage carriers with water proof covers should be provided on the roof.
4. Drinking water should be available in the bus, consisting of a ...Read More
NA
1041 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Guidelines of Hon’ble Supreme Court of India Additional Terms for CNG School Buses for Delhi and NCR. Hiring of up to300 CNG civil buses per school day for conveyance of school going children of entitled Defence personnel in Delhi & NCR.
(a) Eligibility.
(i) DTC / State Transport Agencies. In addition to the registered CHT Contractors, DTC / State Transport Agencies may also participate in the Bid even if not registered with HQs Command. The Blue line buses will however not be ...Read More
NA
1042 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Other Conditions
(a) No bus driver would have been challaned more than twice in a year in respect of offences of jumping red light, improper or obstructive parking violating the stop line etc.
(b) No bus driver would have been challaned/charged even once for the offence of drunken driving and driving dangerously or for the offences under section 279, 337, 338 of the Indian Penal Code.
(c) School buses provided will not overtake any other four wheel motorized moving CNG school ...Read More
NA
1043 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Electric Buses
Considering the Government policy on electric vehicles, a Seller can provide electric buses instead of CNG buses provided all the functions of school bus can be performed by given electric bus and accepted by the Buyer.
NA
1044 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL COVID Guidelines
The Seller will abide by all the COVID-19 protocols with respect to operation of school buses as and when issued by the MHA and / or Department of Education.
NA
1045 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Water Bowser
The water bowser vehicle should be fit for drinking water duty. This will be checked by Consignee.
1. Water will be collected from the approved water point (inspected by military authority) and delivered to units given by consignee.
2. Kilometer reading of the vehicle will start from starting unit and finish at destination unit on the route intimated by consignee.
3. In case water bowser becomes defective without water being supplied for any trip no charges wi ...Read More
NA
1046 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Load Carrier/CHTT
Maximum permissible weight to be loaded in a particular type of vehicle will be as per its RC/ instructions issued by respective RTO / RTA.
1. Any dispute as to the capacity of vehicles shall be determined by the consignee or an Officer acting on his / her behalf whose decision shall be final.
2. A representative of the Seller shall be allowed to supervise the loading/unloading at the loading/unloading installation.
3. Seller shall take all necessar ...Read More
NA
1047 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Online Submission
Scanned copy of following documents will be uploaded:-
(a) Registration certificate issued by Headquarters Command.
(b) Certificate of Financial Capacity Contract Carrying Capacity (CCC) by vendors registered with Headquarters Commands as per format given at Annexure-II.
NA
1048 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Sellers / Accredited Agents, Drivers and Staff Employed by the Sellers
If the contract is not handled by Seller personally, the Seller will employ reliable accredited agent(s) holding power of attorney who may be approved by the consignee. Agent(s) considered undesirable by the consignee would be replaced by Seller within three days.
1. Seller and the accredited agent will give their full verifiable address and telephone numbers to the consignees where they can be contacted or 6. The etiquettes, conduct and behavior of the drivers should be sober, amicable and acceptable. At no stage the driver will be rude and retaliate/enter into an argument with the users.
7. Driver of a vehicle will be changed immediately, if so desired by the consignee or officer using CHT.
8. All CHT vehicle drivers will be in possession of a working mobile telephone.
9. The driver should be in possession of his / her driving license and requisite documents.'> ...Read More
NA
1049 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Common Terms for All Types of Vehicles Required Under the Contract
All Vehicles tendered will be registered/approved by the concerned RTO/RTA as commercial transport and all taxes paid on due date.
1. For operation of the contractual obligations in the protected areas / States, where & when required, all drivers and other staff employed will be in possession of inner line permit / validated card issued by the civil administrative authorities.
2. A valid route permit is hel ...Read More
NA
1050 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Demand of Vehicles & Transport Indents
The civil vehicles required under the contract include those for conveyance of stores, officials, personnel and civilians of Army, Navy, Air Force, Para Military Forces, Central/State Governments and Nationals of other countries for whose subsistence Government of India accepts responsibility and who happen to be or come into the area covered by the contract.
1. Sellers accredited representative will report to the consignee at the designat ...Read More
NA
1051 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Inspection / Rejection of Vehicles
The vehicles provided under this contract shall be according to qualitative standards as the Buyer shall approve.
1. The consignee or his / her authorized representative(s) or any other officer acting on behalf of the Buyer may, at any time, inspect the CHTs tendered by the Seller under this contract, physically or mechanically and Seller shall comply, without unnecessary delay, with any reasonable instructions or suggestions issued by such Offic ...Read More
NA
1052 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Deliveries
Seller will adhere to the time permissible to travel the distance on the specified route as per the instructions which will include routine halts, halts due to security reasons imposed by the Civil/Army authorities, convoy timing if any, repairs en-route repair / maintenance timing and so on to ensure the official(s)/stores reach the destination in time. However, if the vehicle is not able to reach the destination by the expected time of arrival the driver will get his / he ...Read More
NA
1053 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Emergencies & Restrictions
1. In the event of a state of emergency being declared by the President of India in the area where this contract is operational, and the control of civil transport is required to be taken over by the Civil or Military authorities, Seller agree to obtain Buyer’s requirements for the purpose of this contract through and under the supervision of the same authorities and without extra cost to the Government, i.e., without altering the original tendered rate f ...Read More
NA
1054 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Accident & Insurance
1.The Seller shall undertake to produce evidence to the satisfaction of the Buyer that the insurance company, with which insurance all vehicles being tendered under this contract has been affected, has received notice(s) that the Government is interested in the policy of insurance.
2.Seller agrees and will be responsible, for any untoward happening like accident / death of drivers during duties and Seller will not claim any compensation from the Government. ...Read More
NA
1055 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Miscellaneous
Any change in the constitution of the firms shall be notified forthwith by the Seller in writing to the Buyer and such change shall not relieve any former member, of the firm from any liability under the contract
1. No new partner/partners shall be accepted in the Seller’s firm during the currency of this contract unless he/they agree to abide by all its terms and conditions and deposit(s) with the Buyer a written agreement to this effect.
2.Seller acknowled ...Read More
NA
1056 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Deliveries
1.Any delay beyond stipulated number of days for various routes may be waived off by the Buyer (if circumstances were beyond the control of the Seller like road closure or adverse law & order situation) as follows:-
(a) Officer Operating the contract - 04 days (without penalty)
(b) Next Higher Army Authority - 10 days (with penalties as applicable, if there are no justifiable reasons).
2.Seller shall agree to carry/transport stores and personnel in load car ...Read More
NA
1057 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Payment for Local Duties (All Category of vehicle)
1.For application of extra hours / extra kms clauses in Local Duty; thirty minutes and above will be charged as one hour and time below thirty minutes will be ignored.
2.The payment for local duties will progress bracket wise. Each lower bracket will be considered to be crossed if any of the km or time of that bracket is crossed. Beyond the highest bracket i.e 8hours / 80 Km or 10 hours / 80 Km (or as may be the highest bracke ...Read More
NA
1058 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Payment for Out Station Duties (Light Vehicles & Buses)
The followingparameters will be applicable:-
(a) One Way Outstation Duties Where the Vehicle is De-hired at Destination.
(i) The vehicles hired for such outstation duties will be paid per Km (one way) for outstation duties. Such vehicles will be de-hired after reaching the destination.
(ii) In case the vehicle is retained at out station for further duty on the next day(s), then day halt charges per day of o ...Read More
NA
1059 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Payment for Out Station Duties(Trucks, CHTT & Other Specialist Vehicles)
(a) One Way Out Station Duties Where Vehicle is De-hired at Destination:
(i) Vehicle once hired for out station duties will be paid at the rate per km (one way) fixed for out station duty. No day halt will be normally admissible ifthe vehicle is unloaded immediately on reaching the destination. However, in case the vehicle reaches the destination on a working day before 1200 hours and is not unloaded an ...Read More
NA
1060 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Payment for Water Bowsers (for carriage of water only) for Local Duty Contracts
The Water Bowsers (Capacity to be specified in KL) will be paid at the fixed rate duly specifying hour/km clause for the trip. The extra rate per km and extra rate per hour will be admissible beyond the basic rate. Only one parameter i.e. either extra km or extra hour whichever is higher will be paid.
NA
1061 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Payment of Point to Point Out Station Duty Contracts
The payment for point to point contracts will be made at the overall fixed rate per trip without any extra hour or km or day halt or night halt charges.
NA
1062 Vehicle Hiring(MoD) vehicle-hiring-service-hiring-of-mortuary-van NORMAL Recoveries
1.All monies or compensation payable by Seller to the Government under terms of the contract may be deducted from or realized by the sale of sufficient part of Performance Guarantee, or from interest arising there from or from any sums which may be due or may become due by the Government under this contract or any other account with the Government.
2.In the event of Performance Guarantee being reduced by reason of any such deductions of sale as aforesaid or should th ...Read More
NA
1063 Generic electrical-system-and-lighting-and-components-and-accessories-and-supplies-lighting-fixtures-and-accessories-exterior-lighting-fixtures-and-accessories-led-flood-light SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1064 Generic electrical-cable-and-accessories-xlpe-cable-for-working-voltages-upto-and-including-1-1-kv-is-7098-part-1- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1065 Generic exterior-lighting-fixtures-and-accessories-led-luminaire-for-road-and-street-lights- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1066 Generic manufacturing-components-and-supplies-bearings-and-bushings-and-wheels-and-gears-bearings-ball-bearings SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1067 Generic live-plant-and-animal-material-and-accessories-and-supplies-fertilizers-and-plant-nutrients-and-herbicides-herbicides-tebuconazole-ds-as-per-is-15159 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1068 Generic industrial-refrigerators-refrigeration-gas-chlorodifluoro-methane-type-cfm-22-r-22-as-per-is-5610-1983 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1069 Generic batteries-cells-and-accessories-battery-secondary-lead-acid-mt-type-defence- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1070 Generic packaging-materials-packaging-boxes-and-bags-and-pouches-dw-jute-tarpaulin-bags-national-seed-corporation SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1071 Generic bags-pp-plastic-woven-non-laminated-bags-for-seed-packaging-version-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1072 Generic packaging-materials-packaging-boxes-and-bags-and-pouches-cotton-cloth-bag-for-seed-packing-capacity-from-0-75-kg-to-12-kg SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1073 Generic packaging-materials-packaging-boxes-and-bags-and-pouches-laminated-poly-pouches SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1074 Generic arts-and-crafts-equipment-and-accessories-and-supplies-paper-crafts-and-hand-made-papermaking-handmade-paper-label SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1075 Generic lubricants-and-oils-and-greases-and-anti-corrosives-greases-wheel-bearing-grease-as-per-is-10647 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1076 Generic lubricating-preparations-15w-40-diesel-engine-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1077 Generic lubricating-preparations-lithium-base-grease-for-industrial-purposes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1078 Generic lubricating-preparations-quenching-oils SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1079 Generic lubricating-preparations-cardium-compound SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1080 Generic lubricating-preparations-cutting-oil-neat SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1081 Generic lubricating-preparations-cutting-oil-soluble SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1082 Generic engine-component-and-accessories-oil-cylinder SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1083 Generic lubricating-preparations-gear-lubricants-multipurpose-as-per-is-1118-version-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1084 Generic lubricating-preparations-lithium-base-grease-for-automotive-purposes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1085 Generic industrial-production-and-manufacturing-services-plastic-and-chemical-industries-petrochemical-and-plastic-production-general-purpose-grease SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1086 Generic lubricating-preparations-marine-hydraulic-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1087 Generic lubricating-preparations-gear-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1088 Generic lubricating-preparations-internal-combustion-engine-lubrication-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1089 Generic lubricating-preparations-compressor-oils SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1090 Generic lubricating-preparations-turbine-lubricating-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1091 Generic commercial-and-military-and-private-vehicles-and-their-accessories-and-components-transportation-components-and-systems-drivetrain-systems--oil-spindle SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1092 Generic lubricating-preparations-anti-wear-hydraulic-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1093 Generic lubricating-preparations-oil-hydraulic SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1094 Generic lubricating-preparations-transmission-oils SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1095 Generic lubricating-preparations-machine-tool-way-oils SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1096 Generic lubricating-preparations-oil-machinery-general-purpose-machinery-oil-vg-32-vg-100 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1097 Generic lubricating-preparations-marine-engine-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1098 Generic lubricating-preparations-transformer-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1099 Generic lubricating-preparations-control-valve-hydraulic-oils SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1100 Generic lubricating-preparations-lubricating-oils-for-refrigeration-machinery SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1101 Generic containers-and-storage-crates-plastic-crates-for-fruits-and-vegetable SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1102 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antiviral-drugs-antiviral-pyrrolidinones-and-quinolines-and-thiazoles-ritonavir-tablets-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1103 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antiviral-drugs-antiviral-nucleosides-abacavir-tablets-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1104 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antiviral-drugs-antiviral-guanines-acyclovir-tablets-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1105 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antiviral-drugs-combination-antivirals-zidovudine-lamivudine-tablets-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1106 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antineoplastic-agents-alkylating-agent-organoplatinum-compounds-carboplatin-injection-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1107 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-central-nervous-system-drugs-anticonvulsants-acetazolamide-tablets-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1108 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-drugs-affecting-the-respiratory-tract-combination-antiasthma-agents-budesonide-formoterol-fumarate-respules-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1109 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-sympathomimetic-or-adrenergic-drugs-sympathomimetic-or-adrenergic-amino-alcohols-levosalbutamol-tablets-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1110 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-tranquilizers-and-antimanic-and-antianxiety-drugs-tranquilizers-and-antimanic-and-antianxiety-benzodiazepines-clobazam-tablets-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1111 Generic live-plant-and-animal-material-and-accessories-and-supplies-fertilizers-and-plant-nutrients-and-herbicides-herbicides-tebuconazole-ds-as-per-is-15159 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1112 Generic pesticides-or--pest-repellents-chlorantraniliprole-0-4-gr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1113 Generic pesticides-or--pest-repellents-streptomycin-sulphate-90-tetracycline-hydrochloride-10-ww-s-p- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1114 Generic drugs-and-pharmaceutical-productsold-drugs-affecting-the-gastrointestinal-system-antidotes-and-emetics-copper-sulfate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1115 Generic bags-non-woven-bags SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1116 Generic threads-nylon-thread SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1117 Generic cotton-thread-twine SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1118 Generic string-or-twine-jute SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1119 Generic ropes-polypropylene-sutli SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1120 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-immunomodulating-drugs-immunostimulating-agents-anti-tetanus-immunoglobulin-human-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1121 Generic computers-0806nb SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1122 Generic computers-desktop-computer SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1123 Generic computers-0806aio SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1124 Generic duplicating-machines-0901mfm SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1125 Generic computer-printer-0901print SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1126 Generic bar-code-reader-equipment SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1127 Generic bar-code-printer SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1128 Generic cameras-web-camera SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1129 Generic computers-0912tc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1130 Generic computer-data-input-devices-scanner-version-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1131 Generic smart-phone SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1132 Generic power-conditioning-equipment-online-ups-version-2-0- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1133 Generic power-conditioning-equipment-line-interactive-ups-with-avr-version-2-0- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1134 Generic paints-and-primers-and-finishes-paints-and-primers-paint-rfu-finishing-air-drying-brushing-sprying SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1135 Generic lubricating-preparations-special-purpose-hydraulic-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1136 Generic lubricating-preparations-special-purpose-hydraulic-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1137 Generic lubricating-preparations-thermic-fluids SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1138 Generic home_phar_nons_no26320686_5a02101567 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1139 Generic home_phar_radi_fluo_5f11028417 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1140 Generic home_phar_immu_immu_6m53874448 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1141 Generic home_phar_an43836243_comb_ab26248800 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1142 Generic home_phar_an43836243_an32850005_ab65182556 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1143 Generic home_phar_cent_anti_ac76508721 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1144 Generic home_phar_cent_sali_ac72830880 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1145 Generic home_phar_an31150223_acti_ac42376840 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1146 Generic home_phar_an43836243_an72820878_ac13315821 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1147 Generic home_phar_an43836243_an72820878_ac08212087 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1148 Generic home_phar_an43836243_an72820878_ac85350618 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1149 Generic home_phar_cont_comb_bu38233713 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1150 Generic home_phar_cont_cont_bu17112125 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1151 Generic home_phar_an31150223_oxaz_cy10010462 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1152 Generic home_phar_immu_im31464741_cy64785486 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1153 Generic home_phar_immu_im31464741_cy03121331 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1154 Generic home_phar_an43836243_an42362785_da86851707 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1155 Generic home_phar_an43836243_an71080262_ef82522054 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1156 Generic home_phar_an43836243_comb_lo87328535 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1157 Generic home_phar_an43836243_comb_lo05033312 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1158 Generic home_phar_an43836243_anti_ne63431324 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1159 Generic home_phar_an43836243_anti_ne16676044 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1160 Generic home_phar_an43836243_an02351126_ra12147006 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1161 Generic home_phar_an43836243_an02351126_ri81086040 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1162 Generic home_phar_an43836243_comb_te11167562 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1163 Generic home_phar_an43836243_comb_te18444421 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1164 Generic home_phar_an43836243_comb_te55352725 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1165 Generic home_phar_an43836243_comb_zi13318857 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1166 Generic home_phar_an43836243_comb_zi33602005 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1167 Generic home_phar_an43836243_an55282528_zi20168561 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1168 Generic home_phar_an43836243_an72820878_ac00585773 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1169 Generic home_phar_an50732860_anti_ad12305187 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1170 Generic home_phar_symp_symp_ad78210252 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1171 Generic home_phar_agen_anti_al47345427 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1172 Generic home_phar_vaso_vaso_al35214362 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1173 Generic home_phar_an50732860_an86758044_am22815808 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1174 Generic home_phar_an50732860_an86758044_am55063327 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1175 Generic home_phar_an24640084_anti_am78361033 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1176 Generic home_phar_an24012080_anti_am36037587 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1177 Generic home_phar_an51116012_anti_ar67656210 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1178 Generic home_phar_ameb_comb_ar23682165 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1179 Generic home_phar_an43836243_comb_at73708360 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1180 Generic home_phar_auto_neur_at21568010 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1181 Generic home_phar_auto_ch04301551_at40881454 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1182 Generic home_phar_auto_ch04301551_at02152200 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1183 Generic home_phar_immu_immu_az70345548 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1184 Generic home_phar_drug_derm_be81737051 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1185 Generic home_phar_cort_co55115617_be45360740 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1186 Generic home_phar_cort_co55115617_be71010554 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1187 Generic home_phar_an51116012_horm_bi15271473 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1188 Generic home_phar_dr84730406_laxa_bi15787384 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1189 Generic home_phar_an51116012_anti_bl15460264 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1190 Generic home_phar_an51116012_horm_bo82181151 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1191 Generic home_phar_anae_anae_bu41453343 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1192 Generic home_phar_cent_stim_ca14327413 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1193 Generic home_phar_drug_derm_ca57775734 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1194 Generic home_phar_an51116012_tyro_ca06538850 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1195 Generic home_phar_cent_anti_ca36533441 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1196 Generic home_phar_an51116012_alky_ca17604237 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1197 Generic home_phar_an31150223_firs_ce08410100 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1198 Generic home_phar_an51116012_alky_ci81420542 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1199 Generic home_phar_an31150223_eryt_cl58630546 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1200 Generic home_phar_an31150223_eryt_cl08084538 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1201 Generic home_phar_tran_tran_cl52004472 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1202 Generic home_phar_hema_anti_cl80334615 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1203 Generic home_phar_agen_anti_co02766336 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1204 Generic home_phar_auto_neur_ba27185550 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1205 Generic home_phar_nons_nons_ca35227884 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1206 Generic home_phar_nons_nons_ca87765087 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1207 Generic home_phar_nons_nons_di27621675 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1208 Generic home_phar_auto_chol_ri83543114 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1209 Generic home_phar_auto_chol_ri41026333 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1210 Generic home_phar_drug_opht_bi32345658 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1211 Generic home_phar_drug_opht_br00585775 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1212 Generic home_phar_drug_comb_br51851383 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1213 Generic home_phar_drug_comb_br45586780 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1214 Generic home_phar_drug_opht_so47737416 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1215 Generic home_phar_drug_comb_po87876536 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1216 Generic home_phar_dr86163664_deco_ac00660304 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1217 Generic home_phar_dr86163664_deco_ac00643874 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1218 Generic home_phar_dr86163664_deco_am36715578 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1219 Generic home_phar_dr86163664_deco_am08211312 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1220 Generic home_phar_anti_comb_am58663272 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1221 Generic home_phar_anti_comb_br05447721 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1222 Generic home_phar_dr86163664_comb_bu48457373 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1223 Generic home_phar_dr86163664_comb_bu42758441 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1224 Generic home_phar_dr84730406_anti_ci10604024 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1225 Generic home_phar_anti_comb_ch26814043 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1226 Generic home_phar_anti_comb_de77032055 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1227 Generic home_phar_dr86163664_anti_do78781121 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1228 Generic home_phar_dr86163664_comb_do83011781 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1229 Generic home_phar_anti_anti_eb66753563 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1230 Generic home_phar_dr86163664_comb_et66017852 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1231 Generic home_phar_cort_cort_fl00803132 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1232 Generic home_phar_dr86163664_comb_fo83646241 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1233 Generic home_phar_dr86163664_drug_ip56082364 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1234 Generic home_phar_dr86163664_comb_ip20540528 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1235 Generic home_phar_symp_symp_le75063302 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1236 Generic home_phar_agen_comb_po12377073 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1237 Generic home_phar_anti_comb_fe45668147 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1238 Generic home_phar_cent_stim_caff SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1239 Generic home_phar_immu_im31464741_cy84514406 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1240 Generic home_phar_an51116012_an40065186_cyto SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1241 Generic home_phar_immu_im88340467_dpen SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1242 Generic home_phar_dr84730406_an74526484_desf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1243 Generic home_phar_cort_co55115617_dexa SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1244 Generic home_phar_cort_co55115617_de28644815 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1245 Generic home_phar_cort_co55115617_de44824238 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1246 Generic home_phar_hema_bloo_dext SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1247 Generic home_phar_tran_tran_diaz SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1248 Generic home_phar_tran_tran_di62157610 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1249 Generic home_phar_tran_tran_di62774227 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1250 Generic home_phar_auto_ch04301551_di72113674 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1251 Generic home_phar_anth_anth_diet SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1252 Generic home_phar_anth_anth_di52405230 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1253 Generic home_phar_an50732860_an68227433_digo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1254 Generic home_phar_an50732860_an68227433_di60448300 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1255 Generic home_phar_an30835460_anti_dilt SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1256 Generic home_phar_an30835460_anti_di87525214 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1257 Generic home_phar_symp_sy78513035_dobu SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1258 Generic home_phar_ameb_anti_doce SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1259 Generic home_phar_an43836243_an02351126_dolu SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1260 Generic home_phar_cent_anti_done SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1261 Generic home_phar_an31150223_anth_doxo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1262 Generic home_phar_an30835460_an32678712_enal SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1263 Generic home_phar_an43836243_an72820878_ente SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1264 Generic home_phar_an31150223_comb_am78286822 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1265 Generic home_phar_an31150223_eryt_az77484435 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1266 Generic home_phar_an31150223_eryt_az70302407 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1267 Generic home_phar_an31150223_firs_ce34721816 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1268 Generic home_phar_an31150223_thir_ce67806202 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1269 Generic home_phar_an31150223_seco_ce12237736 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1270 Generic home_phar_an51116012_al83723356_chlo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1271 Generic home_phar_ameb_anti_ch83407286 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1272 Generic home_phar_an31150223_quin_ci81778576 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1273 Generic home_phar_an31150223_linc_clin SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1274 Generic home_phar_an31150223_linc_cl11117707 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1275 Generic home_phar_an31150223_pe77786608_clox SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1276 Generic home_phar_an32545471_anti_cloz SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1277 Generic home_phar_an51116012_al83723356_cycl SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1278 Generic home_phar_an51116012_al83723356_cy00873528 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1279 Generic home_phar_hema_an46220264_eryt SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1280 Generic home_phar_adre_adre_esmo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1281 Generic home_phar_an51116012_anti_etop SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1282 Generic home_phar_an51116012_anti_et03111573 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1283 Generic home_phar_cont_co87471141_fent SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1284 Generic home_phar_an24012080_an07238577_fluc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1285 Generic home_phar_an24012080_an07238577_fl02828133 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1286 Generic home_phar_cort_co03417705_flun SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1287 Generic home_phar_an24640084_an78173624_fluo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1288 Generic home_phar_agen_nutr_foli SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1289 Generic home_phar_agen_diur_fu80831226 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1290 Generic home_phar_radi_gado_gado SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1291 Generic home_phar_an51116012_tyro_gefi SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1292 Generic home_phar_vaso_va36676072_glyc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1293 Generic home_phar_vaso_va36676072_gl38474153 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1294 Generic home_phar_auto_ch04301551_glyc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1295 Generic home_phar_an24012080_an21117270_gris SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1296 Generic home_phar_an32545471_an24178326_halo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1297 Generic home_phar_an32545471_an24178326_ha51237837 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1298 Generic home_phar_an32545471_an24178326_ha05645256 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1299 Generic home_phar_hema_anti_hepa SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1300 Generic home_phar_agen_diur_hydr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1301 Generic home_phar_cort_co10677428_hydr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1302 Generic home_phar_cort_co10677428_hy23482455 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1303 Generic home_phar_agen_nutr_hydr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1304 Generic home_phar_ameb_anti_hydr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1305 Generic home_phar_an51116012_an40065186_hydr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1306 Generic home_phar_dr84730406_anti_hyos SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1307 Generic home_phar_dr84730406_anti_hy11152430 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1308 Generic home_phar_nons_no10421517_ib55628117 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1309 Generic home_phar_an51116012_al83723356_ifos SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1310 Generic home_phar_horm_anti_insu SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1311 Generic home_phar_an51116012_tyro_imat SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1312 Generic home_phar_an51116012_an40065186_irin SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1313 Generic home_phar_estr_estr_medr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1314 Generic home_phar_estr_estr_me12480570 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1315 Generic home_phar_nons_no26320686_mefe SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1316 Generic home_phar_nons_no26320686_me61702726 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1317 Generic home_phar_ameb_anti_mefl SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1318 Generic home_phar_radi_comb_megl SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1319 Generic home_phar_an51116012_al83723356_melp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1320 Generic home_phar_dr84730406_an74526484_mesn SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1321 Generic home_phar_an51116012_an40065186_meth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1322 Generic home_phar_immu_im00427553_meth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1323 Generic home_phar_cort_co55115617_meth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1324 Generic home_phar_dr84730406_an74526484_meth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1325 Generic home_phar_dr84730406_anti_meto SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1326 Generic home_phar_dr84730406_anti_me82641578 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1327 Generic home_phar_dr84730406_anti_me02001653 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1328 Generic home_phar_adre_adre_meto SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1329 Generic home_phar_adre_adre_me36488740 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1330 Generic home_phar_an31150223_imid_me52627716 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1331 Generic home_phar_tran_tran_mida SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1332 Generic home_phar_tran_tran_mi77356078 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1333 Generic home_phar_ameb_ameb_milt SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1334 Generic home_phar_cont_cont_morp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1335 Generic home_phar_cont_cont_mo72407502 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1336 Generic home_phar_immu_im78445645_myco SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1337 Generic home_phar_dr86163664_deco_nace SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1338 Generic home_phar_cent_narc_nalo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1339 Generic home_phar_auto_chol_neos SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1340 Generic home_phar_auto_chol_ne37442057 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1341 Generic home_phar_an31150223_an33148782_nitr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1342 Generic home_phar_an31150223_an33148782_ni87353044 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1343 Generic home_phar_symp_symp_nora SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1344 Generic home_phar_estr_estr_nore SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1345 Generic home_phar_dr84730406_anti_onda SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1346 Generic home_phar_dr84730406_anti_on27354707 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1347 Generic home_phar_dr84730406_anti_on66524001 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1348 Generic home_phar_estr_es00467838_orme SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1349 Generic home_phar_an51116012_alky_oxal SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1350 Generic home_phar_an51116012_natu_pacl SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1351 Generic home_phar_dr84730406_an80333625_pant SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1352 Generic home_phar_nons_no74730063_pa30721406 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1353 Generic home_phar_anti_an44784521_phen SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1354 Generic home_phar_hypn_hypn_phen SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1355 Generic home_phar_hypn_hypn_ph43841435 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1356 Generic home_phar_hypn_hypn_ph18531213 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1357 Generic home_phar_cent_anti_phen SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1358 Generic home_phar_cent_anti_ph02630660 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1359 Generic home_phar_cent_anti_ph77040350 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1360 Generic home_phar_an31150223_anti_is11610150 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1361 Generic home_phar_an24012080_an07238577_itra SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1362 Generic home_phar_an24012080_an07238577_it56123756 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1363 Generic home_phar_anth_an82108127_iver SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1364 Generic home_phar_anae_an03810311_keta SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1365 Generic home_phar_adre_ad33803165_labe SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1366 Generic home_phar_adre_ad33803165_la16416800 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1367 Generic home_phar_dr84730406_laxa_lact SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1368 Generic home_phar_an43836243_an55282528_lami SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1369 Generic home_phar_an51116012_natu_lasp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1370 Generic home_phar_immu_im47741017_lena SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1371 Generic home_phar_an51116012_horm_letr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1372 Generic home_phar_cent_anti_leve SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1373 Generic home_phar_cent_anti_le77538107 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1374 Generic home_phar_cent_anti_le40254461 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1375 Generic home_phar_cent_comb_levo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1376 Generic home_phar_estr_estr_levo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1377 Generic home_phar_horm_thyr_levo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1378 Generic home_phar_anae_anae_lign SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1379 Generic home_phar_dr84730406_an37868335_lope SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1380 Generic home_phar_tran_tran_lora SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1381 Generic home_phar_tran_tran_lo06342360 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1382 Generic home_phar_cent_anti_magn SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1383 Generic home_phar_anth_anth_mebe SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1384 Generic home_phar_anth_anth_me60422654 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1385 Generic home_phar_dr84730406_an74526484_acti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1386 Generic home_phar_ameb_comb_ar07458727 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1387 Generic home_phar_an24012080_an07238577_fl88581423 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1388 Generic home_phar_immu_im60352741_hepa SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1389 Generic home_phar_hema_coag_huma SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1390 Generic home_phar_immu_im60352741_huma SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1391 Generic home_phar_symp_symp_le31760644 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1392 Generic home_phar_an31150223_oxaz_li36121550 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1393 Generic home_phar_an30835460_an51103884_meth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1394 Generic home_phar_estr_es01455042_micr SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1395 Generic home_phar_agen_comb_mult SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1396 Generic home_phar_agen_elec_norm SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1397 Generic home_phar_hema_bloo_poly SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1398 Generic home_phar_agen_pota_pota SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1399 Generic home_phar_cort_co55115617_pred SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1400 Generic home_phar_ameb_anti_quin SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1401 Generic home_phar_dr84730406_an74526484_scor SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1402 Generic home_phar_agen_elec_sodi SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1403 Generic home_phar_vaso_va60653031_sodi SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1404 Generic home_phar_dr84730406_laxa_sodi SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1405 Generic home_phar_hema_thro_stre SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1406 Generic home_phar_an51116012_horm_tamo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1407 Generic home_phar_immu_im60352741_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1408 Generic home_phar_an30835460_an73886025_vera SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1409 Generic home_phar_an30835460_an73886025_ve13685435 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1410 Generic home_phar_an51116012_anti_vinc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1411 Generic home_phar_horm_anti_in78387704 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1412 Generic home_phar_horm_thyr_carb SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1413 Generic home_phar_an32545471_an00246576_chlo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1414 Generic home_phar_horm_gona_clom SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1415 Generic home_phar_an24640084_an86061161_clom SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1416 Generic home_phar_an24640084_an45343488_desv SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1417 Generic home_phar_cent_an67342367_disu SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1418 Generic home_phar_an32545471_an00246576_flup SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1419 Generic home_phar_an24640084_an86061161_imip SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1420 Generic home_phar_an32545471_an85427740_risp SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1421 Generic home_phar_cort_co75552601_bude SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1422 Generic home_phar_horm_thyr_prop SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1423 Generic home_phar_agen_elec_dext SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1424 Generic home_phar_agen_comb_dext SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1425 Generic home_phar_dr84730406_an74526484_ac51101556 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1426 Generic home_phar_symp_sy85377216_amin SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1427 Generic home_phar_an51116012_al11830261_daca SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1428 Generic home_phar_an31150223_anth_epir SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1429 Generic home_phar_immu_im60352741_filg SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1430 Generic home_phar_an31150223_quin_le06514521 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1431 Generic home_phar_cent_stim_nike SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1432 Generic home_phar_cent_anti_sodi SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1433 Generic home_phar_an51116012_al55580206_temo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1434 Generic home_phar_immu_im65888712_tofa SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1435 Generic home_phar_an51116012_anti_vinb SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1436 Generic home_phar_horm_calc_zole SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1437 Generic home_phar_anae_an71650766_isof SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1438 Generic home_phar_anae_an68546481_halo SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1439 Generic home_phar_agen_diur_isos SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1440 Generic home_phar_immu_vacc_diph SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1441 Generic home_phar_immu_im60352741_an01258614 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1442 Generic home_drug_an41473687_quin_an35250810 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1443 Generic home_drug_dr54203278_co40032154_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1444 Generic home_drug_dr54203278_co40032154_an24262210 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1445 Generic home_drug_an41473687_lipo_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1446 Generic home_drug_an41473687_oxaz_an25624801 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1447 Generic home_drug_an41473687_quin_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1448 Generic home_drug_an41473687_quin_an56234203 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1449 Generic home_drug_an41473687_oxaz_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1450 Generic home_drug_dr54203278_co40032154_fi41158381 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1451 Generic home_drug_dr54203278_co40032154_fi18277671 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1452 Generic home_drug_dr54203278_co40032154_fi34404473 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1453 Generic home_drug_an41473687_lipo_an43178746 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1454 Generic home_drug_an41473687_an24578770_firs SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1455 Generic home_drug_he58253812_oxaz_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1456 Generic home_drug_an41473687_an24578770_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1457 Generic home_drug_an41473687_an24578770_an40278365 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1458 Generic home_drug_an41473687_an24578770_an74824838 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1459 Generic home_drug_an41473687_an24578770_an87341553 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1460 Generic home_drug_an41473687_quin_an51325052 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1461 Generic home_drug_an41473687_oxaz_an72673158 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1462 Generic home_drug_an41473687_quin_an44574843 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1463 Generic home_drug_an41473687_an24578770_an34845337 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1464 Generic home_drug_an41473687_an24578770_an67621378 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1465 Generic home_drug_an41473687_an24578770_an82363122 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1466 Generic home_drug_an41473687_co63476543_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1467 Generic home_drug_an41473687_rifa_an40371442 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1468 Generic home_drug_an41473687_rifa_anti SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1469 Generic home_drug_an41473687_rifa_an25456613 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1470 Generic home_drug_dr54203278_co40032154_firs SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1471 Generic home_drug_an41473687_an24578770_fi52327184 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1472 Generic uniforms-overall-ground-crew-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1473 Generic blankets-woolen-dyed-air-force-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1474 Generic bags-bag-kit-universal-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1475 Generic synthetic-fabrics-fabric-field-dress-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1476 Generic shoes-shoes-canvas-oil-resistant-sole-iaf-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1477 Generic safety-apparel-inherent-fire-retardant-overall-for-firefighting-and-rescue-purpose-protective-coveralls- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1478 Generic law-enforcement-and-national-security-and-security-and-safety-equipment-and-supplies-personal-safety-and-protection-safety-apparel-fire-proximity-suit-accessories-fireman-gloves SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1479 Generic law-enforcement-and-national-security-and-security-and-safety-equipment-and-supplies-personal-safety-and-protection-safety-apparel-fire-proximity-suit-accessories-fireman-boot SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1480 Generic shoes-physical-training-shoes-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1481 Generic apparel-and-luggage-and-personal-care-products-clothing-tshirtsold-t-shirt-physical-training-iaf-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1482 Generic apparel-and-luggage-and-personal-care-products-clothing-slacks-and-trousers-and-shorts-old-short-gymnastic-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1483 Generic camping-and-outdoor-equipment-net-mosquito-flame-retardant-iaf-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1484 Generic apparel-and-luggage-and-personal-care-products-clothing-suits-old-track-suits-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1485 Generic safety-apparel-rain-jacket-with-integrated-hood-and-trouser- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1486 Generic synthetic-fabrics-fabric-shirt-summer-uniform-iaf-specification34 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1487 Generic synthetic-fabrics-fabric-trouser-summer-uniform-iaf-specification71 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1488 Generic synthetic-fabrics-fabric-shirt-winter-uniform-iaf-specification70 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1489 Generic wool-fabric-fabric-suit-winter-iaf-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1490 Generic coats-and-jackets-jacket-combat SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1491 Generic apparel-and-luggage-and-personal-care-products-clothing-slacks-and-trousers-and-shorts-old-trouser-combat SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1492 Generic shoes-shoes-leather-oxford-pattern-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1493 Generic uniforms-jersey-woolen-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1494 Generic vision-protection-and-accessories-goggles-protective-field- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1495 Generic coats-and-jackets-coat-combat-field-dress-iaf-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1496 Generic uniforms-belt-waist-synthetic-ick-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1497 Generic clothing-accessories-cap-field-dress-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1498 Generic safety-footwear-boot-high-ankle-pu-rubber-sole-defence SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1499 Generic uniforms-belt-summer-uniform-iaf-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1500 Generic clothing-accessories-cravat-winter-iaf-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1501 Generic camping-and-outdoor-equipment-tent-extendable-frame-supported-4m-and-2m-complete-with-accessories-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1502 Generic gaseous-fuels-liquified-petroleum-gas-lpg-as-per-is-4576-in-mobile-tanker SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1503 Generic printer-and-facsimile-and-photocopier-supplies-oem-compatible-cartridge-consumable31 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1504 Generic domestic-drinkware-disposable-paper-cup SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1505 Generic tissue-papers-tissue-papers-version-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1506 Generic cleaning-and-disnfecting-solutions-emulsifier-for-industrial-laundry SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1507 Generic laboratory-and-scientific-equipment-laboratory-water-purification-equipment-and-supplies-fabric-softeners-for-industrial-laundry SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1508 Generic towels-cotton-towelling-and-towels-v2-as-per-is-7056 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1509 Generic towels-towels-hotel-linen SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1510 Generic medical-staff-clothing-and-related-articles-medical-shoe-covers SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1511 Generic surgical-textiles-reusable-medical-gowns SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1512 Generic medical-staff-clothing-and-related-articles-reusable-medical-aprons SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1513 Generic bedclothes-blanket-barrack-and-hospital-blanket-defence SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1514 Generic bedclothes-bedsheets-hotel-linen SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1515 Generic synthetic-fabrics-linen-dress-material SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1516 Generic writing-and-printing-paper-plain-copier-paper-is-14490-version-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1517 Generic medical-diagnostic-imaging-and-nuclear-medicine-products-medical-diagnostic-x-ray-products-digital-medical-x-ray-films-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1518 Generic medical-facility-products-medical-bio-hazard-disposal-products-sharp-container-for-bio-medical-waste-collection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1519 Generic general-lighting-and-fixtures-led-luminaire-recessed-luminaire-rev-1 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1520 Generic -electrical-systems-and-lighting-and-components-and-accessories-and-supplies-lighting-fixtures-and-accessories-interior-lighting-fixtures-and-accessories-led-surface-ceiling-light SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1521 Generic -electrical-systems-and-lighting-and-components-and-accessories-and-supplies-lamps-and-lightbulbs-and-lamp-components-lamps-and-lightbulbs-led-batten SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1522 Generic elements-and-gases-noble-gases-argon SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1523 Generic elements-and-gases-noble-gases-helium SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1524 Generic nitrogen-gas SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1525 Generic hardware-anchors-resin-capsule SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1526 Generic printer-and-facsimile-and-photocopier-supplies-oem-compatible-cartridge-consumable31 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1527 Generic bedclothes-sheet-barrack-polyester-cotton-and-sheet-hospital-100-cotton-iaf SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1528 Generic net-mosquito-round-mesh-polyester-flame-retardant--jss-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1529 Generic cotton-rugs-durry-blue-handloom-cotton-bed-durries-dyed-sulphur-blue SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1530 Generic bedclothes-blanket-indian-navy SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1531 Generic uniforms-overall-ce-indian-navy-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1532 Generic lubricating-preparations-gear-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1533 Swachh Bharat Mission(SBM) MASTER NORMAL Scoping for AMC of STP

a.The shift operators shall


1.Attend duty in the stipulated time and allotted shift and Operate , Maintain the Plant equipment’s (STP) by following the Work Instructions and Safety Guidelines .
2.Check the Raw Sewage Pumps, Sludge Recirculation Pumps, Aerators(fixed/surface), Pre Final Treated Water pumps, Final Treated Water Pumps, Air blower and Electrical panel, Pressure sand filter, tank, etc. for healthiness and record in the d ...Read More
NA
1534 Swachh Bharat Mission(SBM) MASTER NORMAL Fixed /Floating Surface Aerator

The shift operators shall


1.Clear the shaft of the motor from any algae or sludge build up, simply by wiping it down.
2.Inspect the system for any damages caused by objects colliding with the aerator such as rocks.
3.Check the electrical cable for any cuts or abrasions and test the voltage.
4.Check that the aerators operation is normal and the motor is not producing any strange noises.
5.Clear the motor housing.
...Read More
NA
1535 Swachh Bharat Mission(SBM) MASTER NORMAL Diffused Air Aeration System

The shift operator shall


1.Check proper operation of the blower.
2.Check proper operation of PLC control and alarms.
3.Check and clean the air intakes on the blower enclosure.
4.Clean the filter on the blower.
5.Determine the level of sludge on the bottom of the clarifier and adjust waste cycle.
6.Check to ensure the air intakes are clear of debris.
7.Check operation of compressor and clean filter.
8.Check ...Read More
NA
1536 Swachh Bharat Mission(SBM) MASTER NORMAL Chemical Dosing System for Chlorination

The shift operator shall


1.Check the organic matter component at low level prior to chlorine addition.
2.Check the residual chlorine @ 45 minutes.
3.Check whether the solution is correctly sucked into the injection pump;
4.Regularly check the diaphragm assembly for wear or breakage;
5.Clean the one-way valve and filter regularly.
6.At temperature lower than 0℃, stop using the dosing pump and drain the ...Read More
NA
1537 Swachh Bharat Mission(SBM) MASTER NORMAL Primary and Secondary Clarifiers with scraping mechanism

The shift operator shall


1.Check for the condensate accumulation in scraper drive and remove it frequently.
2.Lubricate primary and secondary reducers and the main gear and bearing on regular basis.
3.Check all oil levels weekly and should also drain and replace the main gear oil every 6 months.
4.Check to ensure that the torque control is functioning properly.
5.Lubricate all types of prima ...Read More
NA
1538 Swachh Bharat Mission(SBM) MASTER NORMAL Pressure Sand Filters

The shift operator shall


1.Avoid leaving the filter without water for proper maintenance of the filter material.
2.Check corrosion of vessel and other parts and painting be done as and when required.
3.Check the leakage to prevent water loss.
4.Check the pressure drop for taking up backwashing.
5.Control the inlet valve to prevent the media for coming out of vessel.
6.Periodical change of media needs to be done.
...Read More
NA
1539 Swachh Bharat Mission(SBM) MASTER NORMAL Activated Carbon Filter

The shift operator shall


1.Avoid leaving the filter without water for proper maintenance of the filter material.
2.Check corrosion of vessel and other parts and painting be done as and when required.
3.Check the leakage to prevent water loss.
4.Check the pressure drop for taking up backwashing.
5.Control the inlet valve to prevent the media for coming out of vessel.
6.Periodical change of media needs to be done.
< ...Read More
NA
1540 Swachh Bharat Mission(SBM) MASTER NORMAL Mechanical Filter Press

The shift operator shall


1.Check fittings and hydraulic lines for leaks. If you discover a leak, tighten the fittings or replace them along with the hose.
2.Make sure the hydraulic oil used in your filter press is clean.
3.Monitor oil levels and temperature when the filter press is operating.
4.Check the nuts and bolts on a regular basis.
5.Keep the press safety systems in peak condition.
6.Keep a log of press data ...Read More
NA
1541 Swachh Bharat Mission(SBM) MASTER NORMAL Sewage Pump

The shift operator shall


1.Watch for signs of leaks, rust, or general wear and tear.
2.Listen odd noises carefully during pump cycles and accordingly take action for repair and mantenance.
3.Clean the accessible parts on daily basis.
4.Check the lubrication of the pump.
5.Check for signs of overheating, corrosion, or other forms of wear and tear.
6.Avoid to keep the loose wire during pump operation.
7.Replacing worn-out compone ...Read More
NA
1542 Swachh Bharat Mission(SBM) MASTER NORMAL Sludge Pump

The shift operator shall


1.Check for leaks in the pump’s exterior.
2.Inspect the power cable for any damage.
3.Listen if there are any strange noises or vibrations.
4.Make sure the pump is properly ventilated.
5.Keep the pump and nearby area clean to avoid debris.
6.Inspect shaft pump alignment.
7.Check the wear rings.
8.Check the bearings\' temperature.
9.Perform a complete disassembly and inspection of the pump.
9.Perform a complete disassembly and inspection of the pump.
10.Replace worn or damaged parts.
11.Check if the pump’s operation is proper.
12.Inspect the impeller.
Caution : The operator should not enter Sludge Pump House checking the level of oxygen in indoor air. '> ...Read More
NA
1543 Swachh Bharat Mission(SBM) MASTER NORMAL Maintenance of Civil Works

The shift operator shall


1.Identify the defects or damages occurring in the structure and rectify and repair the damaged structure.
2.Check the leakage in the treatment tanks& repair if any detected.
3.Repair any developed cracks in the STP.
4.If there any waterlogging around the STP, remove it immediately.
5.Check any Dampness problem due to rain in walls, especially near electrical fittings.
6.Vegetation should be ...Read More
NA
1544 Swachh Bharat Mission(SBM) MASTER NORMAL Maintenance of Electrical Works

The shift operator shall


1.Take help of trained and certified workers to install, maintain, or repair electrical equipment.
2.Ensure that live-wire work is conducted by trained workers.
3.Keep the minimum approach distances outlined for specific live line voltages.
4.Ensure proper use of special safety equipment and procedures when working near, or on, exposed energized parts of an electrical system.
5.Stay at leas ...Read More
NA
1545 Swachh Bharat Mission(SBM) MASTER NORMAL Maintenance of Fire Extinguisher

The shift operators shall


1.Maintain the record of checking and certification of all fire extinguishers.
2.Maintain the fire extinguisher at the proper location installed for the purpose.
3.Organise training to aware the use of fire extinguisher.
4.Organise a mock drill for fire extinguisher.
5.Replace/Refill the chemicals 15 days before expiry date
NA
1546 Generic syringes-and-accessories-sterile-hypodermic-syringe-for-manual-use-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1547 Bid Specific ATC MASTER NORMAL Gujarat State Procurement Policy 2024 - Clauses pertaining to Purchase Preference and others : https://assets-bg.gem.gov.in/resources/upload/shared_doc/policy-atc-revised1-2_1720604560.pdf target="_blank">click here NA
1548 Generic medical-staff-clothing-and-related-articles-clinical-apron SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1549 Generic medical-staff-clothing-and-related-articles-scrub-suit SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1550 Generic medical-apparel-and-textiles-patient-clothing-patient-gown SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1551 Generic handicrafts-fashion-apparel-mens-casual-shirt SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1552 Generic apparel-and-luggage-and-personal-care-products-clothing-slacks-and-trousers-and-shorts-old-pants SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1553 Generic medical-staff-clothing-and-related-articles-medical-shoe-covers SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1554 Generic hospital-housekeeping-textiles-medical-bedsheet-and-pillow-cover SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1555 Generic surgical-textiles-reusable-medical-gowns SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1556 Generic bedclothes-rubberised-coir-mattress-cushions-and-pillows-hospital-mattresses-and-pillows SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1557 Generic towels-towel-hand-iaf-specification SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1558 Generic towels-cotton-towelling-and-towels-v2-as-per-is-7056 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1559 Generic hospital-pillow-covers-or-pillowcases SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1560 Generic bedclothes-polyester-blanket-rev-1 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1561 Generic bedclothes-blanket-barrack-and-hospital-blanket-defence SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1562 Generic plain-weave-cotton-fabrics-leopard-packing-cloth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1563 Generic surgical-textiles-surgical-drapes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1564 Generic bedclothes-bedsheets-hotel-linen SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1565 Generic pillows--synthetic SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1566 Generic domestic-appliances-and-supplies-and-consumer-electronic-productsold-window-treatments-curtains-and-draperies-door-curtains SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1567 Generic bath-and-body-condoms SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1568 Generic patient-care-and-treatment-products-and-supplies-obstetrics-and-gynecology-equipment-and-supplies-iucd-375-for-family-planning-programme SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1569 Generic patient-care-and-treatment-products-and-supplies-obstetrics-and-gynecology-equipment-and-supplies-iucd-380a-for-family-planning-programme SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1570 Generic specimen-collection-and-transport-containers-and-supplies-blood-bags SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1571 Generic bath-and-body-mukhyamantri-mahalaxmi-yojna-kit-uttrakhand- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1572 Generic water-treatment-consumables-alumino-ferric-v2-conforming-to-is-299 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1573 Generic water-treatment-consumables-stable-bleaching-powder-for-treatment-of-water-intended-for-drinking-as-per-is-1065-part-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1574 Generic cement-and-lime-hydrated-lime-for-bulk-supply SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1575 Generic food-and-beverage-products-cereal-and-pulse-products-cereals-ration-kit SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1576 Generic inorganic-compounds-ammonia-solution-25- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1577 Generic laboratory-supplies-and-fixtures-laboratory-microscope-slides-and-supplies--microscopes-slide-coverslips SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1578 Generic laboratory-supplies-and-fixtures-laboratory-microscope-slides-and-supplies--microscope-immersion-oil SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1579 Generic petri-plates-or-dishes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1580 Generic laboratory-supplies-and-fixtures-laboratory-microscope-slides-and-supplies--microscopic-slides SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1581 Generic multipurpose-or-general-test-tubes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1582 Generic specimen-collection-and-transport-containers-and-supplies-flocked-swab SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1583 Generic surgical-products-surgical-cutting-instruments-and-snares-and-related-products-detachable-surgical-blades-bard-parker-type- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1584 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-safranin-o-basic-red-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1585 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-gram-s-iodine SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1586 Generic laboratory-and-scientific-equipment-laboratory-slide-stainer-equipment-and-accessories-carbol-fuchsin SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1587 Generic chemicals-including-bio-chemicals-and-gas-materials-solvents-hydrocarbonated-solvents-phenol SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1588 Generic sulphuric-acid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1589 Generic hydrochloric-acid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1590 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-new-methylene-blue-stain-reticulocyte-stain- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1591 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-albert-s-stain-a SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1592 Generic drugs-and-pharmaceutical-productsold-hematolic-drugs-antianemic-drugs-ferric-chloride-anhydrous SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1593 Generic paraffin-wax--medical-for-wax-bath SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1594 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-kovacs-indole-reagent SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1595 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-leishman-s-stain SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1596 Generic laboratory-and-measuring-and-observing-and-testing-equipment-measuring-and-observing-and-testing-equipment-manual-test-kits-and-quality-controls-and-calibrators-and-standards-giemsa-stain SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1597 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-macconkey-broth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1598 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-sabroud-dextrose-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1599 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-potato-dextrose-agar-with-chloramphenicol SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1600 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-mac-conkey-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1601 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-nutrient-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1602 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-nutrient-broth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1603 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-brain-heart-infusion-broth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1604 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-simmons-citrate-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1605 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-triple-sugar-iron-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1606 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-mueller-hinton-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1607 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-thiosulfate-citrate-bile-sucrose-tcbs-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1608 Generic blood-culture-bottles SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1609 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-mannitol-salt-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1610 Generic drugs-and-pharmaceutical-productsold-anaesthetic-drugs-and-related-adjuncts-and-analeptics-combination-analgesics-methyl-red SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1611 Generic compounds-and-mixtures-biochemicals-lysine-decarboxylase-broth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1612 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-arginine-decarboxylase-broth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1613 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-ornithine-decarboxylase-broth SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1614 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-glucose SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1615 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-sucrose SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1616 Generic drugs-and-pharmaceutical-productsold-agents-affecting-water-and-electrolytes-diuretics-mannitol SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1617 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-lactose SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1618 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-aso-anti-streptolysin-o-test-kits-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1619 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-rheumatoid-factor-test-kit-ra-test-kit-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1620 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-rapid-plasma-reagin-rpr-test-kit-for-syphilis-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1621 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-widal-test-kit SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1622 Generic patient-point-of-care-testing-supplies-and-equipment-leptospira-rapid-test-kits-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1623 Generic patient-point-of-care-testing-supplies-and-equipment-malaria-rapid-test-kits SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1624 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-cryptococcal-antigen-lateral-flow-assay SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1625 Generic medical-equipment-and-accessories-and-supplies-medical-cleaning-and-sterilization-products-sterilization-indicators-and-controls-biological-indicators-for-sterilization SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1626 Generic medical-equipment-and-accessories-and-supplies-medical-cleaning-and-sterilization-products-sterilization-indicators-and-controls-biological-indicators-for-dry-heat-sterilization-processes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1627 Generic patient-point-of-care-testing-supplies-and-equipment-hcv-rapid-test-kits SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1628 Generic patient-point-of-care-testing-supplies-and-equipment-anti-hav-rapid-test-kits-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1629 Generic syringes-and-accessories-insulin-syringe SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1630 Generic structural-components-and-basic-shapes-foil-aluminium-and-aluminium-alloy-foil-for-pharmaceutical-packaging SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1631 Generic general-laboratory-glassware-and-plasticware-and-supplies-laboratory-beakers-is-2619-version-2-0- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1632 Generic laboratory-flask SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1633 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-oxidase-disc SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1634 Generic serological-pipettes-and-graduated-pipettes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1635 Generic general-laboratory-glassware-and-plasticware-and-supplies-laboratory-glassware-bottles-screw-neck-bottles-as-per-is-1388-part-1- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1636 Generic laboratory-implements-parafilm-version-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1637 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-hbsag-elisa-test-kits38 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1638 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-hcv-elisa-test-kits77 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1639 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-anti-hav-elisa-test-kits-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1640 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-anti-hev-elisa-test-kits-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1641 Generic laboratory-heating-and-drying-equipments-spirit-burner SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1642 Generic laboratory-and-scientific-equipment-laboratory-filtering-equipment-and-supplies-laboratory-filter-papers SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1643 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-deoxycholate-citrate-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1644 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-xylose-lysine-deoxycholate-agar SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1645 Generic laboratory-and-scientific-equipment-microorganism-propagation-and-transformation-media-and-kits-and-equipment-hugh-leifson-medium SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1646 Generic drugs-and-pharmaceutical-productsold-drugs-affecting-the-gastrointestinal-system-drugs-used-for-gallbladder-disease-dimethyl-sulfoxide SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1647 Generic fuels-plant-based-liquid-fuels-or-biofuels-methanol-as-per-is-517 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1648 Generic laboratory-and-scientific-equipment-laboratory-water-purification-equipment-and-supplies-reagent-grade-distilled-water SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1649 Generic laboratory-graduated-cylinders SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1650 Generic centrifuge-tubes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1651 Generic laboratory-and-scientific-equipment-chemical-evaluation-instruments-and-supplies-ph-paper SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1652 Generic general-laboratory-glassware-and-plasticware-and-supplies-dropping-bottle-with-tip-cap SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1653 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-gram-s-staining-kit SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1654 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-papanicolaou-pap-stain-kit SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1655 Generic general-laboratory-glassware-and-plasticware-and-supplies-cover-slip SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1656 Generic drugs-and-pharmaceutical-productsold-drugs-affecting-the-ears-eye-nose-and-skin-combination-otic-agents-glacial-acetic-acid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1657 Generic laboratory-and-measuring-and-observing-and-testing-equipment-clinical-chemistry-testing-systems-components-and-supplies-clinical-chemistry-titrant-reagents-dpx-new SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1658 Generic food-beverage-and-tobacco-products--beverages-old-alcoholic-beverages-methylele-spirit-denatured-alcohol- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1659 Generic fuels-plant-based-liquid-fuels-or-biofuels-anhydrous-denatured-ethanol SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1660 Generic chemicals-including-bio-chemicals-and-gas-materials-solvents-oxygenated-solvents-isopropyl-alcohol-2-propanol- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1661 Generic measuring-and-observing-and-testing-instruments-clinical-and-diagnostic-analyzer-reagents-anti-a-blood-grouping-reagent SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1662 Generic measuring-and-observing-and-testing-instruments-clinical-and-diagnostic-analyzer-reagents-anti-b-blood-grouping-reagent-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1663 Generic measuring-and-observing-and-testing-instruments-clinical-and-diagnostic-analyzer-reagents-anti-d-blood-grouping-reagent SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1664 Generic measuring-and-observing-and-testing-instruments-clinical-and-diagnostic-analyzer-reagents-anti-human-globulin-ahg-reagent SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1665 Generic laboratory-and-measuring-and-observing-and-testing-equipment-blood-manufacturing-and-hematology-systems-components-and-supplies-hematology-kits-and-packages-neonatal-glucose-6-phosphate-dehydrogenase SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1666 Generic universal-pipette-tips SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1667 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-drabkin-solution SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1668 Generic general-laboratory-glassware-and-plasticware-and-supplies-cuvettes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1669 Generic printing-and-writing-paper-thermal-paper-roll SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1670 Generic colorants-dyes-sudan-black-iii-dye- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1671 Generic drugs-and-pharmaceutical-productsold-drugs-affecting-the-gastrointestinal-system-laxatives-glycerine SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1672 Generic inorganic-compounds-aluminium-potassium-sulphate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1673 Generic inorganic-compounds-mercuric-oxide SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1674 Generic additives-indicators-and-reagents-eosin-y-dissodium-salt SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1675 Generic laboratory-and-measuring-and-observing-and-testing-equipment-measuring-and-observing-and-testing-equipment-manual-test-kits-and-quality-controls-and-calibrators-and-standards-schiff-s-reagent SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1676 Generic inorganic-compounds-periodic-acid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1677 Generic inorganic-compounds-nitric-acid-v2-as-per-is-264 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1678 Generic laboratory-and-scientific-equipment-histology-equipment-microtome-blades SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1679 Generic laboratory-and-scientific-equipment-histology-equipment-optimal-cutting-temperature-compound-oct-compound- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1680 Generic laboratory-and-scientific-equipment-histology-equipment-tissue-embedding-cassette SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1681 Generic drugs-and-pharmaceutical-productsold-drugs-affecting-the-gastrointestinal-system-combination-cariostatics-dental-or-mouth-washes-or-oral-agents-thymol SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1682 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-benedict-s-solution SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1683 Generic inorganic-compounds-ferric-ammonium-sulphate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1684 Generic printing-and-photographic-and-audio-and-visual-equipment-and-supplies-photographic-and-recording-media-media-storage-aluminium-slide-tray SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1685 Generic general-laboratory-glassware-and-plasticware-and-supplies-glass-rods-for-laboratory-use-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1686 Generic laboratory-and-measuring-and-observing-and-testing-equipment-blood-manufacturing-and-hematology-systems-components-and-supplies-hematology-reagents-rbc-diluting-fluid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1687 Generic laboratory-and-measuring-and-observing-and-testing-equipment-blood-manufacturing-and-hematology-systems-components-and-supplies-hematology-reagents-wbc-diluting-fluid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1688 Generic drugs-and-pharmaceutical-productsold-drugs-affecting-the-gastrointestinal-system-combination-cariostatics-dental-or-mouth-washes-or-oral-agents-potassium-nitrate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1689 Generic additives-in-situ-sodium-acetate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1690 Generic chemicals-including-bio-chemicals-and-gas-materials-solvents-hydrocarbonated-solvents-picric-acid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1691 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-edta-solution-0-02n SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1692 Generic inorganic-compounds-barium-chloride-liquid SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1693 Generic inorganic-compounds-formic-acid-anhydrous SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1694 Generic laboratory-and-scientific-equipment-histology-equipment-erythrocyte-sedimentation-rate-esr-pipette SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1695 Generic https://elements-and-gases-industrial-use-gases-ammonia-liquor-ammonium-hydroxide#/?q=ammonium%20hydroxide%20as%20per%20is%20799 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1696 Generic printer-and-facsimile-and-photocopier-supplies-thermal-ribbon SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1697 Generic specimen-collection-and-transport-containers-and-supplies-blood-lancets SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1698 Generic specimen-collection-and-transport-containers-and-supplies-blood-sample-collection-tubes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1699 Generic bath-and-body-antimicrobial-hand-wash-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1700 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antiseptics-antiseptic-sulfur-compounds-sodium-hypochlorite-solution-v2-as-per-is-11673-part-1- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1701 Generic laboratory-and-measuring-and-observing-and-testing-equipment-blood-manufacturing-and-hematology-systems-components-and-supplies-manual-hematology-devices-neubauer-chamber-hemocytometer SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1702 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-sodium-phosphate-dibasic-anhydrous SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1703 Generic inorganic-compounds-ammonium-sulphate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1704 Generic laboratory-and-measuring-and-observing-and-testing-equipment-clinical-chemistry-testing-systems-components-and-supplies-clinical-chemistry-reagents-biochemistry-reagent-kits SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1705 Generic https://inorganic-compounds-acetic-acid-ongc#/?q=acetic%20acid%20(v2)%20as%20per%20is%20695 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1706 Generic compounds-and-mixtures-biochemicals-ammonium-molybdate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1707 Generic laboratory-electrophoresis-and-blotting-system-and-supplies-agarose-powder SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1708 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-alpha-naphthol SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1709 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-n-butanol SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1710 Generic additives-indicators-and-reagents-bromophenol-blue SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1711 Generic non-metals-and-pure-and-elemental-gases-liquid-bromine SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1712 Generic inorganic-compounds-copper-sulphate-v2-as-per-is-261 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1713 Generic drugs-and-pharmaceutical-productsold-anaesthetic-drugs-and-related-adjuncts-and-analeptics-combination-anesthetics-and-adjuncts-chloroform SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1714 Generic food-and-beverage-products-edible-oils-and-fats-edible-vegetable-and-plant-oils-and-fats-coconut-oil-as-per-is-542 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1715 Generic drugs-and-pharmaceutical-productsold-anaesthetic-drugs-and-related-adjuncts-and-analeptics-anaesthetic-ethers-2-4-dinitrophenylhydrazine-reagent-solution SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1716 Generic compounds-and-mixtures-mixtures-di-sodium-hydrogen-phosphate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1717 Generic hand-cleaner-soap SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1718 Generic compounds-and-mixtures-mixtures-diethyl-ether SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1719 Generic additives-indicators-and-reagents-fehling-solution-a-b SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1720 Generic laboratory-and-measuring-and-observing-and-testing-equipment-clinical-chemistry-testing-systems-components-and-supplies-clinical-chemistry-substrates-d-fructose SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1721 Generic volumetric-pipettes SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1722 Generic drugs-and-pharmaceutical-productsold-antiseptics-antiseptic-halogens-iodine SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1723 Generic additives-indicators-and-reagents-molisch-s-reagent SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1724 Generic compounds-and-mixtures-mixtures-mercuric-chloride SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1725 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-maltose-monohydrate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1726 Generic manual-single-channel-air-displacement-pipetters-or-micropipette SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1727 Generic measuring-and-observing-and-testing-instruments-clinical-and-diagnostic-analyzer-reagents-ninhydrin-solution SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1728 Generic chemicals-including-bio-chemicals-and-gas-materials-solvents-oxygenated-solvents-normal-butyl-alcohol-technical SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1729 Generic compounds-and-mixtures-mixtures-potassium-oxalate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1730 Generic drugs-and-pharmaceutical-productsold-hormones-and-hormone-antagonists-thyroid-and-antithyroid-drugs-potassium-iodide SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1731 Generic drugs-and-pharmaceutical-productsold-drugs-affecting-the-gastrointestinal-system-laxatives-potassium-sodium-tartrate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1732 Generic inorganic-compounds-potassium-hydrogen-sulphate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1733 Generic compounds-and-mixtures-mixtures-potassium-dihydrogen-orthophosphate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1734 Generic casting-and-splinting-supplies-plaster-of-paris-bandage-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1735 Generic food-beverage-and-tobacco-products--beverages-old-alcoholic-beverages-rectified-spirit-for-industrial-use-version-3-as-per-is-323 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1736 Generic inorganic-compounds-sulfuric-acid-research-grade- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1737 Generic compounds-and-mixtures-organic-derivatives-and-substituted-compounds-edta-disodium-salt SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1738 Generic inorganic-compounds-sodium-nitroprusside-dihydrate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1739 Generic drugs-and-pharmaceutical-productsold-radiopharmaceuticals-and-contrast-media-combination-diagnostic-agents-sodium-bicarbonae SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1740 Generic mineral-and-textile-and-inedible-plant-and-animal-materialsold-minerals-and-ores-and-metals-minerals-sulphur-powder SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1741 Generic drugs-and-pharmaceutical-productsold-antiseptics-antiseptic-pyrimidines-and-silvers-and-ureas-and-waters-silver-nitrate SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1742 Generic drugs-and-pharmaceutical-productsold-antibacterial-combination-antibacterials-starch SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1743 Generic cobweb-brush SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1744 Generic laboratory-stands-and-racks-and-trays-test-tube-rack SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1745 Generic specimen-collection-and-transport-containers-and-supplies-blood-bags SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1746 Generic applicator-swabs-and-cotton-balls-absorbent-cotton-wool-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1747 Generic measuring-and-observing-and-testing-instruments-manual-test-kits-and-quality-controls-and-calibrators-and-standards-hiv-elisa-test-kits24 SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1748 Generic patient-point-of-care-testing-supplies-and-equipment-syphilis-rapid-test-kits SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1749 Generic medical-gloves-and-accessories-disposable-surgical-rubber-gloves-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1750 Generic laboratory-supplies-and-fixtures-laboratory-microscope-slides-and-supplies--microscope-slides-v2-as-per-is-3099-part-2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1751 Generic blood-administration-and-transfusion-products-microaggregate-blood-transfusion-filter-b-t-filter- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1752 Generic medical-diagnostic-imaging-and-nuclear-medicine-products-medical-diagnostic-x-ray-products-digital-medical-x-ray-films-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1753 Generic electrical-systems-lighting-components-accessories-supplies-lighting-fixtures-accessories-emergency-lighting-and-accessories-led-bulb-with-battery SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1754 Generic electrical-cable-and-accessories-pvc-insulated-unsheathed-cable-with-flexible-conductor-is-694- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1755 Generic patient-care-and-treatment-products-and-supplies-urological-treatment-products-and-supplies-urethral-catheter SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1756 Generic patient-care-and-treatment-products-and-supplies-urological-treatment-products-and-supplies-foley-s-catheter SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1757 Generic injection-and-aspiration-needles-and-accessories-rumen-puncture-needle SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1758 Generic medical-diagnostic-imaging-and-nuclear-medicine-products-vascular-imaging-and-interventional-cardiology-and-cardiac-catheterization-lab-products-embolectomy-catheter-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1759 Generic laboratory-and-measuring-and-observing-and-testing-equipment-blood-manufacturing-and-hematology-systems-components-and-supplies-hematology-kits-and-packages-activated-clotting-time-act-test-cartridge SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1760 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antihypertensive-drugs-antihypertensive-benzazepines-diltiazem-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1761 Generic surgical-textiles-adhesive-incise-drape SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1762 Generic bandages-and-dressings-and-related-products-antimicrobial-dressing-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1763 Generic intravenous-and-arterial-cannulas-and-catheters-and-accessories-arterial-line-catheters-and-cannula-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1764 Generic medical-diagnostic-imaging-and-nuclear-medicine-products-vascular-imaging-and-interventional-cardiology-and-cardiac-catheterization-lab-products-introducer-needle-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1765 Generic intravenousarterial-tubing-and-administration-sets-and-related-products-three-way-stopcocks SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1766 Generic intracompartmental-pressure-monitoring-set-accessories-pressure-monitoring-line SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1767 Generic medical-equipment-and-accessories-and-supplies-dialysis-equipment-and-supplies-extracorporeal-hemodialysis-equipment-and-supplies-hemodialysis-catheter-kit SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1768 Generic intravenous-and-arterial-cannulas-and-catheters-and-accessories-central-venous-catheters-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1769 Generic patient-care-and-treatment-products-and-supplies-urological-treatment-products-and-supplies-pigtail-drainage-catheter-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1770 Generic medical-diagnostic-imaging-and-nuclear-medicine-products-cardiac-pacemakers-and-related-products-cardiac-resynchronization-therapy-pacemaker-crt-p- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1771 Generic intravenous-and-arterial-cannulas-and-catheters-and-accessories-balloon-dilatation-catheters SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1772 Generic emergency-iv-infusion-kit SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1773 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-anaesthetic-drugs-and-related-adjuncts-and-analeptics-anaesthetic-amides-lignocaine-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1774 Generic drugs-and-pharmaceutical-products-anti-infective-drugs-antibioticsold-amikacin SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1775 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-anaesthetic-drugs-and-related-adjuncts-and-analeptics-anaesthetic-ethers-isoflurane-liquid-for-inhalation SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1776 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-autonomic-nervous-system-drugs-neuromuscular-blocking-agents-atracurium-injection-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1777 Generic drugs-and-pharmaceutical-products-anti-infective-drugs-antibioticsold-silver-sulphadiazine-cream SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1778 Generic drugs-and-pharmaceutical-productsold-immunomodulating-drugs-vaccines-and-antigens-and-toxoids-tetanus-toxoid-with-adult-diphtheria-td-vaccine-under-universal-immunization-programme-of-mohfw SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1779 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antifungal-drugs-antifungal-macrolides-amphotericin-b-injection-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1780 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-immunomodulating-drugs-veterinary-vaccines-and-virology-products-rabies-veterinary-vaccine-inactivated-cell-culture- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1781 Generic drugs-and-pharmaceutical-productsold-agents-affecting-water-and-electrolytes-diuretics-furosemide SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1782 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-sympathomimetic-or-adrenergic-drugs-sympathomimetic-or-adrenergic-amino-alcohols-noradrenaline-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1783 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-adrenergic-blocking-agents-adrenergic-blocking-agent-ethanolamines-labetalol-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1784 Generic drugs-and-pharmaceutical-products-anti-infective-drugs-antibioticsold-doxycycline SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1785 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-immunomodulating-drugs-immunostimulating-agents-anti-tetanus-immunoglobulin-human-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1786 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-immunomodulating-drugs-immunostimulating-agents-human-normal-immunoglobulin-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1787 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antifungal-drugs-antifungal-triazoles-itraconazole-capsule SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1788 Generic blood-administration-and-transfusion-products-blood-administration-set-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1789 Generic wound-care-products-sutures-and-related-products-sutures-v3- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1790 Generic intravenous-cannulas SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1791 Generic mackintosh-sheet-hospital-rubber-sheetings SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1792 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-anaesthetic-drugs-and-related-adjuncts-and-analeptics-anaesthetic-cycloparaffins-ketamine-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1793 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antihistamines-or-h1-blockers-antihistamine-or-h1-blocker-pyridines-pheniramine-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1794 Generic pharmaceutical-products-incl-contraceptives-and-vaccines-antibacterials-oxazolidinones-linezolid-injection SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
1795 Generic medical-gloves-and-accessories-single-use-rubber-examination-gloves-v2- SLA Running Contract for long term staggered delivery: The Purchaser reserves the right to increase the order quantity against this bid by ${PCMQuantity} % of the bid quantity. This bid is created for a long term staggered delivery requirement and hence the Contract Price will be Valid for a period of ${ValidityPeriodMonth} Months from the date of placement of contract. Total estimated requirement for all bid items during contract validity period is therefore = bid quantity plus option clause %. The ...Read More 1. PCM Quantity(%)
Type: INT
2. Contract Price Validity period(In Months)
Type: INT
S.NO. Group Name Applicable for Clause Type ATC Clause Values
1 Service & Support goods SLA Availability of service Centres : ${availabilityOfSC} Availability of service Centres
Type: Bidder /OEM must have Service Centre In the State of each Consignee's Location, Bidder /OEM must have Service Centre In the District of each Consignee's Location
2 Scope of Supply services SLA Scope of Service (Bid price to include all cost components) : ${scopeOfService} Scope of Service (Bid price to include all cost components)
Type: Deliverables mentioned in the Service Level Agreement, Scope of Work and Service along with obligations mentioned in the Service Level Agreement of the Service, Payment Term ...Read More
3 Purchase Preference services SLA Procurement under this bid is reserved for purchase of Services from : ${servicesFrom} Procurement under this bid is reserved for purchase of Services from
Type: Micro and Small Enterprises whose credentials are validated online through UdyogAadhaar for that product category., Micro and Small Enterprises from the State of Bi ...Read More
4 Purchase Preference services SLA Purchase preference will be given to : (if L-1 is not from selected category and Service Provider (s) from selected category has/have  quoted price within L-1+ ----( to be specified) % of margin of purchase preference /price band defined in relevant policy, such Service Provider shall be given opportunity to match L-1 price and award contract for percentage of total value as defined/ decided  in relevant policy) ${purchasePrefGivenTo} Purchase preference will be given to : (if L-1 is not from selected category and Service Provider (s) from selected category has/have quoted price within L-1+ ----( to be specified) % of margin of purchase preference /price band defined in relevant p ...Read More
5 Scope of Supply services NORMAL Execution of Service (Log Sheet) : The Service Provider will create Logs for each Service rendered. Before generation of the Bill, Logs will be verified by Buyer / Consignee. Some Miscellaneous detections if any arise during the execution of the Service and also meeting the requirement of the Contract. NA
6 Scope of Supply services NORMAL Cloud Service Provider must understand Application Architecture and Design of Cloud Solution. NA
7 Scope of Supply services NORMAL Cloud Service Provider shall support Migration of application and other data from existing cloud to new cloud. NA
8 Scope of Supply services NORMAL Cloud Service Provider shall do Provisioning of support level or Equivalent for software licenses as Selected by the Buyer Department. Covering updates, upgrades, security patches, issue resolution at software level, bug fixing etc. NA
9 Scope of Supply services NORMAL Configuration of Cloud Solution at proposed Data centres NA
10 Scope of Supply services NORMAL Cloud Service Provider must provide Network Connectivity between Primary and the DR site NA
11 Scope of Supply services NORMAL Cloud Service Provider shall provide Bandwidth provisioning at Primary and the DR site NA
12 Scope of Supply services NORMAL Cloud Service Provider must conduct periodic DR Drill NA
13 Scope of Supply services NORMAL Cloud Service Provider shall carry out Cloud Service Provisioning through Self Service provisioning Portal NA
14 Scope of Supply services NORMAL Cloud Service Provider shall do Operational and Functional testing NA
15 Scope of Supply services NORMAL Functional acceptance signoff NA
16 Service & Support services NORMAL Cloud Service Provider shall provide 24x7x365 Support, Cloud service Provisioning, de- provisioning, updations, auto-scaling, security, firewall, anti-virus, bandwidth etc. NA
17 Scope of Supply services NORMAL Cloud Service Provider shall do Maintenance & Management of Cloud Solution & infrastructure post implementation NA
18 Scope of Supply services NORMAL Service Level Agreement will be applicable for each Service as provided in the Marketplace NA
19 Buyer Specific services NORMAL Evaluation of the Project will be done as per requirements of 7.00,000 users while the Buyer Department will start by procuring for requirements of 1,00,000 users. The billing will thus be done as per Actuals NA
20 Buyer Specific M5 NORMAL Allocation

The supplied items will be installed in MCL, HQ and various locations (Areas/ Units- approx 50 locations) across Odisha & West Bengal. Detailed distribution list with location will be provided by GM(Systems) to the successful bidder with the placement of order.
NA
21 turnOver services NORMAL Average Annual financial turnover of related services during the last three years, ending 31st March of the previous financial year, should be at least 30% (Thirty per cent) of the estimated cost. (Seller to upload relevant document as part of bid submission. Buyer will verify the documents submitted by seller.) NA
22 Generic services NORMAL The bidder must have at least three years experience (ending month of March prior to the bid opening) of providing similar type of services to Central/State Government/PSUs/Nationalised Banks/Reputed Organisations. Services rendered with list of such Central/State/PSUs/Nationalised Banks/Reputed Organisations with duration of service shall be furnished. (Seller to upload relevant document as part of bid submission. Buyer will verify the documents submitted by seller.) NA
23 Certificates services NORMAL The bidder must have successfully executed/completed similar services, over the last three years i.e. the current financial year and the last three financial years:- (Seller to upload relevant document as part of bid submission. Buyer will verify the documents submitted by seller.)
1) Three similar completed services costing not less than the amount equal to 40% (Forty per cent) of the estimated cost; or
2) Two similar completed services costing not less than the amount equal to 50 ...Read More
NA
24 Scope of Supply M5 NORMAL Scope of supply (Bid price to include all cost components): Bidder should submit their Bid for all the items. Evaluation will be on the total value of supply (not on item wise value) along with installation and subsequent comprehensive warranty period as per bid document for the respective items NA
25 Buyer Specific M5 NORMAL Allocation:
The supplied items will be installed in BCCL, HQ, Kolkata and at various locations/Areas/ Units under BCCL command area (within 60 KM radius) across Jharkhand & West Bengal and at the Office of BCCL, Kolkata. Detailed, location-wise distribution list will be provided by the GM(Systems) to the successful bidder
NA
26 Warranty M5 NORMAL Comprehensive Warranty Clause

a) On-site Comprehensive warranty to be done by the successful bidder for the comprehensive warranty period as per bid document for the respective items

b) Comprehensive warranty shall include supply of all spares including battery for UPS, software supply & support for operating system/ patch updates/ security updates etc. The system should be in a condition, secured from all malwares/ viruses for maintaining availability of more than 95 ...Read More
NA
27 Warranty OZ4869 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
28 Warranty OZ4869 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
29 Warranty Div631 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
30 Warranty Div1532 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
31 Warranty O821_NIC NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
32 Warranty OZ12362_NIC NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
33 Warranty O5279_NIC NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
34 Warranty O5279_NIC_NIC NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
35 Warranty O5673_Mahabubnagar_NIC NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
36 Warranty O5495_District-collector-khargone_NIC NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
37 Warranty O5699_District-Magistrate-Office-Tallital-Nainital_NIC NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
38 Warranty O357_Idukki_NIC NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
39 Certificates O357_Wayanad NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
40 Buyer Specific OZ27409_BSNL NORMAL Supplier must supply those ONTs which are inter-operable with existing OLTs  of Alphion make, Tejas make and C-Dot make which are deployed in BSNL/BBNL Network. NA
41 Buyer Specific OZ27409_BSNL NORMAL After having been notified of the defects / service requirement during warrantee period, Seller has to complete the required Service / Rectification within time limit specified. If the Seller fails to complete service / rectification with defined time limit, a penalty of defined amount shall be charged as penalty for each week of delay from the  seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the ...Read More NA
42 Buyer Specific OZ27409_BSNL NORMAL "SECURITY:

a)    The Supplier shall enable the Purchaser to comply with Applicable Laws including but not limited to notifications, circulars etc issued by DoT from time to time.

b)The Supplier recognizes and accepts that  in order to make, maintain and ensure Purchaser’s networks compliant with security related instructions and guidelines issued by the DoT  from time to time,  complete cooperation and commitment of the Supplier is necessary.

c) It is clarified that ...Read More
NA
43 Buyer Specific M7 NORMAL Supplier must supply those ONTs which are inter-operable with existing OLTs  of Alphion make, Tejas make and C-Dot make which are deployed in BSNL/BBNL Network. NA
44 Buyer Specific M7 NORMAL After having been notified of the defects / service requirement during warrantee period, Seller has to complete the required Service / Rectification within time limit specified. If the Seller fails to complete service / rectification with defined time limit, a penalty of defined amount shall be charged as penalty for each week of delay from the  seller. Seller can deposit the penalty with the Buyer directly else the Buyer shall have a right to recover all such penalty amount from the ...Read More NA
45 Buyer Specific M7 NORMAL "SECURITY:

a)    The Supplier shall enable the Purchaser to comply with Applicable Laws including but not limited to notifications, circulars etc issued by DoT from time to time.

b)The Supplier recognizes and accepts that  in order to make, maintain and ensure Purchaser’s networks compliant with security related instructions and guidelines issued by the DoT  from time to time,  complete cooperation and commitment of the Supplier is necessary.

c) It is clarified that ...Read More
NA
46 Warranty M38 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
47 Warranty S34 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
48 Warranty S33 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
49 Warranty M39 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
50 Warranty M15 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
51 Warranty M48 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
52 Warranty S36 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
53 Warranty S21 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
54 Warranty S35 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
55 Warranty M15 NORMAL Comprehensive Warranty Clause

 a) Onsite Comprehensive warranty will be done by the seller.

 b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%.

c) Breakdown will be attended within twenty four hours from the receipt of information at the local office of the Supplier.< ...Read More
NA
56 Certificates S24 NORMAL Pre-Qualification criteria to be uploaded for GeMProcurement

1) Bidders profile:

a) ISO: The bidders must have ISO 9001-2015 certification.

b) Copies of the all relevant documents mentioned above must be uploaded on GeM portal within the stipulated time period. Without these documents being attached the bids will be treated as invalid.

2) Bidders` Declaration:

a) Bidder/ Supplier/ Organization/ Proprietor/ any of the Director(s) must ...Read More
NA
57 Warranty M5 NORMAL Comprehensive Warranty Clause

a) Onsite Comprehensive Warranty services for 5 years would be provided by the seller at all the consignees end (CMPDI(HQ) & all Regional Institutes) in co-ordination with the OEM.

b) Comprehensive Warranty shall include supplies of spares, services, software support and patch management for OS(formatting of HDD & reloading of OS if required), for maintaining availability of more than 95%.

c) Scope of installation will include logi ...Read More
NA
58 Inspection M24 NORMAL Buyer/consignee shall have the right to inspect the supplied goods (special envelopes required by IGNOU) themselves and/or through their appointed agency at consignees own cost, at consignee`s site(s) after receipt and accept or reject on proper justification any consignment of goods within a period of 30 days of receipt of consignment of goods. 100% payment will be released within ten (10) days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills NA
59 Buyer Specific S31 NORMAL

1- Exemption from EMD shall be as per Clause-4 of GTC on Gem 3.0 (Version 1.6) Bidders must submit valid certificate and proof to avail exemption. 

2- Warranty shall be three years comprehensive onsite-warranty. Battery and power adaptor would have one year warranty. 

3- Bidders must submit device certifications issued by UIDAI under UIDAI E&U Division Circular No. -4(4)/57/122/2012/UIDAI/Pt dated 31.12.2018 

4- Delivery of kits shall be con ...Read More

NA
60 Buyer Specific M5 SLA

2. Comprehensive Warranty Clause:

a) Onsite Comprehensive Warranty services for ${warrantyYears} years would be provided by the seller at all the consignees end in co-ordination with the OEM.

b) Comprehensive Warranty shall include supplies of spares, services, software support and patch management for OS (formatting of HDD & reloading of OS if required), for maintaining availability of more than 95%.

c) Scope of installation will include logical partitioning of HDD, ...Read More

1. Warranty Years
Type: 1, 2, 3, 4, 5
2. SECL would have the right to adjust the total accumulated penalty amount against PBG submitted by the vendor after completion of the contract period of Years
Type: 1, 2, 3, 4, 5
3. ...Read More
61 Buyer Specific M5 NORMAL

1. Allocation:

The supplied items will be installed in SECL-HQ and various locations (Areas/Units) across Chattisgarh & MP. Detailed distribution list of locations will be provided to the successful bidder with the placement of order.

NA
62 Buyer Specific M51 NORMAL Evaluation of the Project will be done as per requirement of 14,00,000 users while the Buyer department will start by procuring for requirement of 4,00,000 users. The billing will be done as per actuals. click here to view Exit Management clauses NA
63 Buyer Specific M15 NORMAL Details of the Firewall Policies :- FW, APPID, IPS, AV, C&C, URLF, 0 Day Prev, MGMT, Reporting, Clientless VPN, Hot Swap Field Replaceable Fans,MSA support for (OKTA, DUO). NA
64 Buyer Specific M15 NORMAL Integrated interface Slots :- 12x"GE copper",4xGE Small Form-Factor Pluggable (SFP),4 x 10GSFP+, Dedicated HA Ports. NA
65 Buyer Specific M15 NORMAL Management Console :- The firewall should support either through in-built Management console or GUI based Management Console. NA
66 Buyer Specific M51 NORMAL The service level agreement specified in GeM Marketplace would also be applicable. Please click here to view the service level agreement NA
67 Buyer Specific S31 NORMAL A.OEM/Bidders to provide minimum 40 service centres covering all 18 Divisions of Uttar Pradesh as mentioned below:–
1-Prayagraj, 2-Lucknow, 3-Moradabad, 4-Kanpur, 5-Azamgarh, 6-Meerut, 7-Varanasi, 8-Saharanpur,9-Jhansi, 10-Aligarh, 11-Mirzapur, 12-Gorakhpur, 13-Faizabad, 14-Basti, 15-Agra, 16-Gonda (Devipatan), 17-Bareilly, 18- Chitrakoot.

B. Certifications- BIS, CE, CB/UL, FCC, RoHS are mandatory for the Smart Phone quoted.

C. Warranty- 2 year warranty on Device & 1 year ...Read More
NA
68 Scope of Supply services NORMAL The Vehicles to be provided to this office should be registered in the name of the Agency or in the name of the owner of the Agency. Vehicles on Aggregator module/basis would not be accepted NA
69 Buyer Specific services NORMAL To avoid any misuse of car stickers the vehicles would have to be parked at night in the office premises or at the residence of the concerned using officer NA
70 Buyer Specific M22 NORMAL Total requirement of Programming software with cable Qty- 13 Nos. NA
71 Buyer Specific M22 NORMAL Warranty period 01 year from the receiving of store at consignee location. NA
72 Buyer Specific S11 NORMAL The OEM/Bidder must have its service centres for service/repair of smart phones in each district of Gujarat. Details of service centers such as name, address, contact person and contact number must be submitted along with the bid. NA
73 Buyer Specific S11 NORMAL OEM/Bidder should have successfully executed a single order for supply of at-least 60% of the tendered Qty to any Central/State Government/ PSUorganization in last two years with equivalent or higher specifications as asked for in the subject bid. Work order and competition certificate must be submitted for compliance to this criteria. (As per CVC guidelines no:- 12-02-1-CTE-6 dated 17/12/2002 and 12-02-01-CTE-06 dated 07/05/2014. NA
74 OEM S11 NORMAL Date of manufacture of the smart phones should not be more than three months from the date of delivery. In this regard, self-declaration from OEM is to be furnished. NA
75 Buyer Specific S11 NORMAL The successful bidder will have to carry out repair/service of the smart phones within maximum 3 working Days of submitting the phone for repair/service at the service center. Failure to do so will attract penalty at the rate mentioned in GeM SLA. NA
76 Buyer Specific M22 NORMAL Total requirement of Programming software with cable Qty- 13 Nos. NA
77 Buyer Specific M22 NORMAL Warranty period 01 year from the receiving of store at consignee location. NA
78 Buyer Specific M35 NORMAL

Additional Terms and conditions would also be applicable. Please click here to view the Additional Terms and conditions.

NA
79 Buyer Specific M11 NORMAL

Additional Terms and conditions would also be applicable. Please click here to view the Additional Terms and conditions.

NA
80 Buyer Specific M37 NORMAL

Additional Terms and conditions would also be applicable.Please click here to view the Additional Terms and conditions.

NA
81 Buyer Specific M15 NORMAL Delivery, Buy-back and Installation of the Batteries:
All aspects of safe delivery shall be the exclusive responsibility of the vendor. All batteries are of the Same Make and with the same specification as per the BID Only.Delivery of Batteries should be within 15 days from the date of Work Order issuance.It should be with Buyback facility: It shall be the sole responsibility of the contracted agency to collect Old batteries disposed by our office on "as is where is" basis. So that vendor ha ...Read More
NA
82 Buyer Specific M15 NORMAL Installation of new batteries: Old batteries may be collected by the Vendor only after supply and installation of new batteries at Site where the UPS is under operation with old batteries. Vendor has to collect the Old batteries within a week of time after complete installation of new batteries. NA
83 Buyer Specific M15 NORMAL Dimension and Weight of Batteries:
Batteries will be of 452x172x239 mm (L x W x H) and Weight of each battery will be 37.85 Kg. Or batteries will be of 393 x 173 x 240 mm (L x W x H) and weight of each battery will be 35.71 Kg.
NA
84 Buyer Specific M15 NORMAL Other conditions:
The vendor should be a unit registered with Ministry of Environment & Forest (MOEF)/Central Pollution Board (CPCB) or any other equivalent Govt. Agency as Recyclers/Reprocesses having environmentally sound management facilities as Lead Waste Re-processors". Also documentary proof(s) to this effect should be provided by the vendor
NA
85 Buyer Specific M37 NORMAL Additional Terms and conditions would also be applicable for VSS Project. Please click here to view the Additional Terms and conditions. NA
86 Buyer Specific M37 NORMAL Additional Terms and conditions would also be applicable for KIOSK under RailWire Saathi Project. click here to view the Additional Terms and conditions. NA
87 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for item Respiratory Ventilator.
1) Accessories-adult and paediatric reusable silicon circuit should be provided. (one each)
2) Medical Air Compressor should be from the same manufacturer.
3) It should provide ET-tube leak compensation.
NA
88 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable item Syringe Infusion Pump.
1) The equipment should be compatible with any standard (PVC) syringes available in local Indian market.
2) The equipment should have feature of memory retention, air sensor, and night inner lightning function.
NA
89 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for Volumetric Infusion Pump

Should have feature of memory retention, air sensor, night inner lightning function.

NA
90 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for item Multimonitor Transport.

1) SPO2 measurement in low perfusion/with motion artifacts (MASIMO/NELCOR) should be available.

2) EtCO2 should be essentially available parameter in the equipment. (Not as optional/ upgradable)

3) Following Accessories should also be provided :

a)10 EtCO2 sample lines.

NA
91 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for item Defibrillator /With Monitor/With Recorder with External Pacemaker.

1)The machine should have in built recorder printing ECG trace & stored information

2)The machine should have user selectable alarm setting.

3) Charging time should be less than 6 to 7 sec at maximum energy.

4) The unit should be upgradeable to 12 lead ECG monitoring, if required.

NA
92 Buyer Specific M26 NORMAL Pre despatch Inspection

  Pre despatch inspection shall, be applicable for the stores to be supplied against this bid as per details indicated below:

  Pre despatch inspection by ESIC Committee applicable

NA
93 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for item Bedside multipara monitor.

  1) SPO2 measurement in low perfusion/with motion artifacts (MASIMO/NELCOR) should be available.

  2) IBP and ETCO2 should be essentially available parameter in the equipment. (not as optional/upgradable)

  3) Following Accessories should also be provided-

        a) 10 EtCO2 sample lines.

&n ...Read More

NA
94 Buyer Specific M26 NORMAL

The following additional technical parameters shall be applicable for item Anaesthesia Workstation.

1) CO2 absorber should be essential Component of anaesthesia workstation.

2) Vaporisers compatible to gases (Isoflurane, Sevoflurane and Desflurane) should be from the same manufacture as anaesthesia workstation.

3) Following accessories should also be provided:

       a) Reusable mask: Adult and Paediatric (1 pc each), All sizes(0 ...Read More

NA
95 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for item Respiratory Ventilator.
1) Accessories-adult and paediatric reusable silicon circuit should be provided. (one each)
2) Medical Air Compressor should be from the same manufacturer.
3) It should provide ET-tube leak compensation.
NA
96 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable item Syringe Infusion Pump.
1) The equipment should be compatible with any standard (PVC) syringes available in local Indian market.
2) The equipment should have feature of memory retention, air sensor, and night inner lightning function.
NA
97 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for Volumetric Infusion Pump

Should have feature of memory retention, air sensor, night inner lightning function.

NA
98 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for item Multimonitor Transport.

1) SPO2 measurement in low perfusion/with motion artifacts (MASIMO/NELCOR) should be available.

2) EtCO2 should be essentially available parameter in the equipment. (Not as optional/ upgradable)

3) Following Accessories should also be provided :

a)10 EtCO2 sample lines.

NA
99 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for item Defibrillator /With Monitor/With Recorder with External Pacemaker.

1)The machine should have in built recorder printing ECG trace & stored information

2)The machine should have user selectable alarm setting.

3) Charging time should be less than 6 to 7 sec at maximum energy.

4) The unit should be upgradeable to 12 lead ECG monitoring, if required.

The following additional tec ...Read More

NA
100 Buyer Specific M26 NORMAL Pre despatch Inspection

  Pre despatch inspection shall, be applicable for the stores to be supplied against this bid as per details indicated below:

  Pre despatch inspection by ESIC Committee applicable

NA
101 Buyer Specific M26 NORMAL The following additional technical parameters shall be applicable for item Bedside multipara monitor.

  1) SPO2 measurement in low perfusion/with motion artifacts (MASIMO/NELCOR) should be available.

  2) IBP and ETCO2 should be essentially available parameter in the equipment. (not as optional/upgradable)

  3) Following Accessories should also be provided-

        a) 10 EtCO2 sample lines.

  ...Read More

NA
102 Buyer Specific M18 NORMAL Copy of Labour license NA
103 Buyer Specific M18 NORMAL Certificate/Undertaking regarding no due of PF,ESI. NA
104 Buyer Specific M20 NORMAL Additional Terms and conditions would also be applicable. click here to view the Additional Terms and conditions. NA
105 Buyer Specific S31 NORMAL OEM/Bidders to provide minimum 40 service centres covering all 18 Divisions of Uttar Pradesh as mentioned below : 1-Prayagraj, 2-Lucknow, 3-Moradabad, 4-Kanpur, 5-Azamgarh, 6-Meerut, 7-Varanasi, 8-Saharanpur, 9-Jhansi, 10-Aligarh, 11-Mirzapur, 12-Gorakhpur, 13-Faizabad, 14-Basti, 15-Agra, 16-Gonda (Devipatan), 17-Bareilly, 18- Chitrakoot. NA
106 Certificates S31 NORMAL Certifications - BIS, RoHS, IP54 are mandatory for the Finger Print Scanner quoted. *During bid submission the OEM/bidder needs to upload all the above documents along with the other bid documents. NA
107 Buyer Specific M24 NORMAL Bidder should be ISO Certified organization. The following supporting documents to be submitted with bid - ISO 9001: 2005 (For Design, Development, Manufacturing, Marketing and Sale of Furniture items), ISO - 14001:2015 (For Design, Development, Manufacturing, Marketing and Sale of Furniture items), OHSAS 18001:2007 (For Design, Development, Manufacturing, Marketing and Sale of Furniture items), IGBC & BIFMA membership. NA
108 Buyer Specific M24 NORMAL Bidder must possess BIFMA LEVEL 3 for product quoted. To be submitted along with the bid. NA
109 Buyer Specific M24 NORMAL Bidder must have a service centre / Regional Branch in Punjab. Documentary proof shall be submitted. Documentary poof shall be submitted stating assurance to address the fault if any developed in items within 48 hrs. NA
110 Buyer Specific M24 NORMAL Bidder should be ISO Certified organization. The following supporting documents to be submitted with bid - ISO 9001: 2005 (For Design, Development, Manufacturing, Marketing and Sale of Furniture items), ISO - 14001:2015 (For Design, Development, Manufacturing, Marketing and Sale of Furniture items), OHSAS 18001:2007 (For Design, Development, Manufacturing, Marketing and Sale of Furniture items), IGBC & BIFMA membership. NA
111 Buyer Specific M24 NORMAL Bidder must possess BIFMA LEVEL 3 for product quoted. To be submitted along with the bid. NA
112 Buyer Specific M24 NORMAL Bidder must have a service centre / Regional Branch in Punjab. Documentary proof shall be submitted. Documentary poof shall be submitted stating assurance to address the fault if any developed in items within 48 hrs. NA
113 Buyer Specific S8 NORMAL EMD should be made in favour of "Executive Engineer PWD Division M-341" NA
114 Buyer Specific M50 NORMAL The Manufacture`s authorization certificate is mandatory to be uploaded in the given Bid by the Bidder. NA
115 Buyer Specific S8 NORMAL EMD should be made in favor of "Director of Education, Government of National Capital Territory of Delhi, Old Secretariat, Delhi". NA
116 Buyer Specific S8 NORMAL EMD should be made in favor of "Director of Education, Government of National Capital Territory of Delhi, Old Secretariat, Delhi". NA
117 Buyer Specific M50 NORMAL The Manufacture`s authorization certificate is mandatory to be uploaded in the given Bid by the Bidder. NA
118 Buyer Specific S8 NORMAL EMD should be made in favour of "Executive Engineer PWD Division M-341" NA
119 Buyer Specific S5 NORMAL

Additional Terms and conditions would also be applicable. Please click here to view the Additional Terms and conditions.

NA
120 Buyer Specific M20 NORMAL The certificates and other documents as mentioned in the bid under reference e.g. EMD, OEM authorization Annual Turnover Statement Experience Statement (with all respective supporting documents) must be uploaded with the technical bid. NA
121 Buyer Specific M20 NORMAL The EMD/Bid Security shall be deposited within 5 days through Bank guarantee/Demand Draft/FDR drawn in favour of Director, AIIMS New Delhi after bid opening time. The original Earnest Money/Bid Security must be delivered to Asstt. Stores Officer, Department of Computer Facility AIIMS, Ansari Nagar, New Delhi-110029 , failing which the bid shall be summarily rejected. NA
122 Buyer Specific M20 NORMAL The documents to be submitted with the bid may be scanned with 100 dpi with black and white options which help in fast uploading. NA
123 Buyer Specific M20 NORMAL Additional Terms and conditions would also be applicable. Please click here to view the Additional Terms and conditions. NA
124 Buyer Specific M15 NORMAL Additional Terms and conditions would also be applicable. Please click here to view the Additional Terms and conditions. NA
125 Buyer Specific S5 NORMAL Date of manufacture of the smartphone should not be more than three months from the date of delivery. In this regard, self declaration from OEM is to be furnished. NA
126 Buyer Specific S5 NORMAL OEM/Bidder should have successfully executed a single order for supply of at least 60% of the tender quantity to any Central/State Government/PSU organization in last two years with equivalent or higher specification as asked for in the subject bid. Work order and completion certificate must be submitted for compliance to this criteria. (As per CVC guidelines no - 12-021-CTE-6 dated 17th Dec, 2002 and 12-02--1-CTE-06 dated 7th May 2004.) NA
127 Service & Support S5 NORMAL The successful bidder will have to carry out repair/service of the product within maximum 3 working days of submitting the product for repair/service at the service centre. Failure to do so will attract penalty at the rate mentioned in GeM SLA. NA
128 Buyer Specific S5 NORMAL Additional Terms and conditions would also be applicable for Bid no-GEM/2019/B/248362. Please click here to view the Additional Terms and conditions. NA
129 Buyer Specific S5 NORMAL Additional Terms and conditions would also be applicable for Bid no-GEM/2019/B/248461. Please click here to view the Additional Terms and conditions. NA
130 Buyer Specific S5 NORMAL Additional Terms and conditions would also be applicable for Bid no-GEM/2019/B/253380. Please click here to view the Additional Terms and conditions. NA
131 Buyer Specific S5 NORMAL Additional Terms and conditions would also be applicable for Bid. No.GEM/2019/B/248100. Please click here to view the Additional Terms and conditions. NA
132 Buyer Specific S5 NORMAL Additional Terms and conditions would also be applicable for Bid. No.GEM/2019/B/248199. Please click here to view the Additional Terms and conditions. NA
133 Buyer Specific M15 NORMAL Additional Terms and conditions would also be applicable for Bid No.GEM/2019/B/246767. Please click here to view the Additional Terms and conditions. NA
134 Buyer Specific S8 NORMAL The Bidder must have executed at least one single order of 80% value of the Bid or 2 orders each of 60% value of the bid or 3 orders each of 40% value of the bid for supply of Furniture in last seven years to Govt /PSU/ Limited Company containing similar products. Documentary proof duly signed by an officer not below the rank of Executive Engineer to be submitted. NA
135 Buyer Specific S8 NORMAL A warranty certificate on non-judicial stamp paper of 2 years from date of completing the order shall be given by the bidder. NA
136 Buyer Specific M35 NORMAL Current IT environment has approx. 350 Virtual Machines, 150 Physical Host and multiple database including Oracle, MSSQL, MySQL, PostgreSQL, DB2, IBM Domino, Microsoft Share point in DC and DR. NA
137 Buyer Specific M35 NORMAL Backup software should integrate with Disk Backup target device (DD6800 and DD6300) which supports hardware/software data de-duplication capabilities. It should support EMC Data Domain Boost (DD boost) for source-side data de-duplication, yielding faster, more efficient backups that enable lower recovery point objectives (RPOs) and lower exposure to data loss. NA
138 Audit MASTER NORMAL Audited Balance sheet of bidder FOR last 3 years or from the date of incorporation if incorporation date is less than 3 months is required. NA
139 Service & Support MASTER NORMAL Office of the Service Provider (through Bid)IS prefered to be located at a place near to the Buyers /consignee headquater or any branch or registered office for sake of better co-ordination, smooth services and other administrative factors. NA
140 Certificates MASTER NORMAL Bidder/ Supplier/ Organization/ Proprietor/ ANY of the Director(s) shall not be banned or suspended or black listed by any Government / Public Sector Undertaking / Corporate organization or convicted in any Court of Law across India or declared Bankrupt or insolvent. A self declaration certificate must be uploaded in the GeM portal under Bidders Official Letter Head. NA
141 Certificates MASTER NORMAL Bidder shall submit the detailed BOM of the equipments offered duly verified and certified BY the respective OEM. The detailed BOM shall indicate quantities and price break up of various modules/sub modules/cards/Licenses required for each equipments. NA
142 Buyer Specific MASTER NORMAL The details of the consignee are filled in the GeM bid. The location where material is to be installed will be available on Buyers website after award of order NA
143 Certificates MASTER NORMAL Experience Certificate from the concerned Govt. Department of the subject matter is required along with average turnover of last 3 Yrs BY authority prescribed BY GeM. NA
144 OEM MASTER NORMAL The Equipment offered BY the OEM OR equipment of the same series/family FROM the same OEM should have been satisfactorily working IN Government/PSUs/Telecom ServiceProviders network for at least 06 months in India or Abroad. The certificates from the actual users will have to be submitted offline. NA
145 Generic MASTER NORMAL For small scale units registered with NSIC under single point registration Scheme and participating in this tender enquiry, following exemptions are available: -They are exempted from depositing Earnest money.These exemptions are applicable provided units are registered with NSIC FOR tendered item and registration is current and valid. Firms claiming these exemptions are required to submit along with their offer, copy of their current and valid NSIC registration certificate for the tendered item ...Read More NA
146 Warranty MASTER NORMAL The Bidder shall be responsible for any defects that may develop under the conditions provided by the contract and under proper USE, arising FROM faulty materials, design OR workmanship such AS corrosion, inadequate quantity of material TO meet equipment requirements, inadequate contact protection, deficiencies in design AND/ OR otherwise and shall remedy such defects at his own cost when called upon to do so by the Purchaser who shall state in writing in what respect the stores are faulty. NA
147 Certificates MASTER NORMAL Lab Test Report FROM Govt./NABL accredited lab is required for conforming the requirements of All the parameters of governing specification of SUBJECT store. NA
148 Inspection MASTER NORMAL Buyer/consignee shall have the right to inspect the supplied goods themselves AND/OR through their appointed agency at consignees own cost, at consignees site(s) after receipt and accept OR reject on proper justification any consignment of goods within a period of 30 days of receipt of consignment of goods. 100% payment will be released within ten (10) days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on on-line submission of bills NA
149 OEM MASTER NORMAL Equipment offered shall have complete DATA sheets and detailed description on OEM web sites. NA
150 OEM MASTER NORMAL The OEM should have proven facilities for Training, repair and Service Center Support in India at least for past three years. In case OEM is located outside India, it should have training, repair and service center facilities in India also. The certificates/ Undertaking for the same will have to be submitted offline/online. NA
151 Certificates MASTER NORMAL Bidder should be the Original Equipment Manufacturer. Letter of incorporation shall be submitted. NA
152 Service & Support MASTER NORMAL Training: Mandatory Minimum 5 days professional Full time training to 10 persons to be provided at each States / UTs (30 locations) identified by the concerned Buyers nodal officer. NA
153 Certificates MASTER NORMAL If the Certificate Authority (CA) fails to validate the information contained in the digital certificate and if it would make a loss of money to end user. Therefore, the CA shall give warranty to recover a claim from end-users. Malware/ PCI/Antivirus Scanning of website/ WebPages should be done.Vulnerability Assessment of website/ WebPages should be done. NA
154 Warranty MASTER NORMAL Replacement under warranty clause shall be made by the Seller free of all charges at site including freight, insurance and other incidental charges.During the warranty period, the Seller shall remain responsible to arrange replacement in next Business day (NBD) and for setting right at his own cost any equipment installed by him which is of defective manufacture or design or becomes unworkable due to any cause whatsoever. The decision of the Buyers representative in this regard to direct the con ...Read More NA
155 Buyer Specific M5 NORMAL Allocation:The supplied items will be installed in CCLHQ and various locations (Areas/ Units- approx (80 locations) across state of Jharkhand. Detailed distribution list with location will be provided by GM (System),CCL to the successful bidder with the placement of order. NA
156 Buyer Specific M5 NORMAL Comprehensive Warranty Clause

a) Onsite Comprehensive warranty will be done by the seller.

b) Comprehensive Warranty shall include all supplies of spares, services, software support for operating system and other software supplied and installed under this package, patch management for OS, for maintaining availability of more than 95%. If Printer (Laser/MFP) is supplied with separate drum & toner, drum life should be minimum 12000 prints.

c) Scope of installati ...Read More
NA
157 Buyer Specific S34 NORMAL Additional Terms and conditions would also be applicable for Bid no-GEM/2019/B/270396. Please click here to view the Additional Terms and conditions. NA
158 Generic services SLA The buyer organization is an institution eligible for concessional rates of GST as notified by the Government of India. The services for which bids have been invited fall under classification of GST concession and the conditions for eligibility of concession are met by the institution. A certificate to this effect will be issued by Buyer to the Seller after award of the Contract. Sellers are requested to submit their bids after accounting for the Concessional rate of GST.
Applicable Concessi ...Read More
1. Applicable concessional rate of GST
Type: FLOAT
2. Notification No
Type: ALPHA_NUMERIC
3. Notification Date
Type: DATE
159 Service & Support MASTER NORMAL Office of the Service Provider is required to be located at a place near to the consignee(user) for sake of better co-ordination , smooth services and other administrative factors. in support, service provider will give details of office address, landline number, Contact Person and his mobile number along with bid failing which there offer will not be considered. NA
160 Service & Support services SLA The Service Provider shall own: ${dropdownval} The Service Provider shall own:
Type: 10% of vehicle out of the total numbers required under this contract., 20% of vehicle out of the total numbers required under this contract., 30% of vehicle out of the total numbers required under thi ...Read More
161 Certificates MASTER NORMAL ISO 9001: The bidder must have ISO 9001 certification. NA
162 Generic MASTER SLA EMD IN FAVOUR OF : EMD should be in favour of ${emd_Param_1} and Performance security should be in favour of ${emd_Param_2} , wherever it is applicable. 1. EMD in favour of
Type: ALPHA_NUMERIC
2. Performance security in favour of
Type: ALPHA_NUMERIC
163 Generic MASTER NORMAL EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. NA
164 Generic services NORMAL PAST EXPERIENCE FOR SERVICES: The Bidder must have executed at least one single order of 80% value of the Bid or 2 orders each of 50% value of the Bid or 3 orders each of 40% value of the Bid for similar service(s) in last three years to Govt / PSU / Limited Company containing similar products. Documentary proof to be submitted alongwith the Bid. NA
165 Generic MASTER NORMAL WORLD BANK TERMS AND CONDITIONS:  Special Terms and Conditions as defined by world bank at click here will also be applicable. APPLICABLE ONLY IN CASE OF WORLD BANK FUNDED PROJECTS. NA
166 Generic MASTER NORMAL EXPERIENCE CRITERIA : In respect of the filter applied for experience criteria, the Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU / Public Listed Company for number of years as indicated in the bid document before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the y ...Read More NA
167 Generic MASTER NORMAL PAST PERFORMANCE CRITERIA: In respect of the filter applied for Past Performance Critriea, the Bidder or its OEM {themselves or through reseller(s)} should have supplied same or similar Category Products for quamtity as indicated in the bid document, in at least one of the last three years before the bid opening date to any Central / State Govt Organization / PSU / Public Listed Company. Copies of relevant contracts to be submitted along with bid in support of quantity supplied in the rele ...Read More NA
168 Inspection goods NORMAL Pre-dispatch inspection at Seller premises (Fee/Charges to be borne by the BUYER): Before dispatch, the goods will be inspected by Buyer / Consignee or their Authorized Representative or by Nominated External Inspection Agency (independently or jointly with Buyer or Consignee as decided by the Buyer) at Seller premises for their compliance to the contract specifications. Fee/Charges taken by the External inspection Agency and any external laboratories testing charges shall be borne by the Buyer. ...Read More NA
169 Inspection goods SLA Pre-dispatch inspection at Seller premises (Fee/Charges to be borne by the SELLER): Before dispatch, the goods will be inspected by Buyer / Consignee or their Authorized Representative or by Nominated External Inspection Agency (independently or jointly with Buyer or Consignee as decided by the Buyer) at Seller premises for their compliance to the contract specifications. Fee/Charges taken by the External inspection Agency and any external laboratories testing charges shall be borne by the SELLE ...Read More 1. Tests required to be conducted during pre-dispatch inspection:
Type: ALPHA_NUMERIC
2. INSPECTION AGENCY : The inspection agency will conduct the ...Read More
170 Payment services NORMAL PAYMENT OF SALARIES AND WAGES: Service Provider is required to pay Salaries / wages of contracted staff deployed at buyer location first i.e. on their own and then claim payment from Buyer alongwith all statutory documents like, PF, ESIC etc. as well as the bank statement of payment done to staff. NA
171 Purchase Preference (Centre) MASTER SLA Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs as defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012 dated 23.03.2012 issued by Ministry of Micro, Small and Medium Enterprises and its subsequent Orders/Notifications issued by concerned Ministry. If the bidder wants to avail the Purchase preference, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are ex ...Read More Required Percentage
Type: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56 ...Read More
172 Purchase Preference (Centre) MASTER NORMAL Procurement under this bid is reserved for purchase from Micro and Small Enterprises whose credentials are validated online through UDYAM Registration /Udyog Aadhaar (as validated by Government from time to time) for that product category. If the bidder wants to avail the reservation benefit, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are excluded from the purview of Public Procurement Policy for Micro and Small Enterprises. In respect ...Read More NA
173 Purchase Preference (State) goods NORMAL Preference to Make In India products: Preference shall be given to local supplier as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local content to qualify as a local supplier, should be as per relevant notification / order issued by the nodal ministry as available on the website of Department of Promotion of Industries and Int ...Read More NA
174 Generic goods SLA Past Performance Criteria: The Bidder or its OEM {themselves or through re-seller(s)} should have supplied same or similar Category Products for ${SLA_PARAM_1}% of bid quantity, in at least one of the last three years before the bid opening date to any Central / State Govt Organization / PSU / Public Listed Company. Copies of relevant contracts (PROVING SUPPLY OF CUMULATIVE ORDER QUANTITY IN ANY ONE YEAR) to be submitted along with bid in support of quantity supplied in the relevant year. In cas ...Read More Select supplied quantity percentage (%) :
Type: 10, 20, 30, 40, 50, 60, 70, 80
175 Buyback goods NORMAL GST will apply on the value of buyback and separate invoice is to be prepared by Government buyer/Consignee for buy back items offline outside the GeM system. Vendor should work out input credit for that GST applicable on the buy back while quoting the product/services. NA
176 Buyback goods NORMAL Input GST Credit consideration by seller- seller shall offer the prices in the bid by the total amount of new goods including GST- total amount of old goods quoted by the firm excluding GST. This is because GST charged by buyer on buy-back value will be available for full ITC (input tax credit) on the hands of bidder. Therefore, for the purpose of quoting in the bid and evaluation, value as quoted by the bidder (excluding any GST on buy back) as indicated in column G below will be considered. ...Read More NA
177 Buyback goods NORMAL Successful lowest bidder has to provide detailed cost break up of tendered items as well as buy back items separately after award of contract through email to the government buyer/consignee. NA
178 Buyback goods NORMAL The seller of new item /service provider shall deposit the cost of invoiced buy back item with GST to the buyer for allowing seller to lift up the material from the buyer/consignee premise. NA
179 Buyback goods NORMAL Transportation of buy back items from buyer premises shall be arranged by the seller itself without any extra cost. NA
180 Buyback goods NORMAL Government Buyer organisation /consignee will issue invoice of buy back items to the seller at the cost of buyback to be indicated to the buyer by the seller offline after receipt of order. This in no case will modify the bid in any manner. NA
181 Buyback goods NORMAL The seller will be entirely responsible for the safe disposal of old items without affecting the environment in any manner as per prevailing statutory rules and Act/ law of the land. NA
182 Buyback goods NORMAL The seller may visit the site and inspect the condition of buy back item in advance before quoting for the bid. NA
183 Buyback goods NORMAL Receipt of payment by the buyer for Old items and invoicing by buyer will be out of GeM portal. NA
184 Buyback goods NORMAL Government Buyer will upload the details of old goods along with the bid in the corrigendum with minimum price. NA
185 Buyback goods NORMAL If the minimum price (Optional) is indicated and seller’s of new item who are not agreeing to take back the old item at equal to or above that minimum price should not participate in the bid. NA
186 Buyback goods NORMAL In case they participate into the bid and afterwards indicates the price of old goods, less than the minimum price shown by Government Buyer in corrigendum, EMD of the bidder will be forfeited. NA
187 Buyback goods NORMAL Item Details Consignee wise will be indicated in the corrigendum like -
1. Consignee wise
2. Item Description
3. Serial Number
4. Model
5. Brand
6. Year of manufacturing
7. Purchased on
8. Age
9. Size, Rating, Designation
10. Quantity
11. Min price (Optional)
12. Unit
13. Working Guidelines (/Functional/Non-Functional)
14. Remarks
NA
188 Buyback goods NORMAL The successful bidder shall remove the old goods from the premise of the Government buyer/consignee at the time of the supply, installation and commissioning of fresh goods. Seller will be entitled for payment only after removal of old goods from Government buyer/consignee/user’s premise and after supplying the fresh goods in terms of contract. NA
189 Buyback goods NORMAL Note: This clause of ATC shall be operated by non PFMS; non GPA buyer i.e. all PSU working through their ERP and not integrated with GPA. NA
190 Generic MASTER SLA Experience Criteria: The Bidder or its OEM {themselves or through reseller(s)} should have regularly, manufactured and supplied same or similar Category Products to any Central / State Govt Organization / PSU for ${SLA_PARAM_1} before the bid opening date. Copies of relevant contracts to be submitted along with bid in support of having supplied some quantity during each of the year. In case of bunch bids, the primary product having highest value should meet this criterion. Experience Criteria in Years
Type: 1 year, 2 years, 3 years
191 Purchase Preference (Centre) MASTER NORMAL Bid reserved for Make In India products: Procurement under this bid is reserved for purchase from local supplier as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local content to qualify as a local supplier, should be as per relevant notification / order issued by the nodal ministry as available on the website of Department of ...Read More NA
192 Purchase Preference (Centre) goods NORMAL Preference to Make In India products: Preference shall be given to local supplier as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local content to qualify as a local supplier, should be as per relevant notification / order issued by the nodal ministry as available on the website of Department of Promotion of Industries and Int ...Read More NA
193 Generic MASTER SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
194 Inspection goods SLA Inspection of Stores by Inspection Authority of buyer or their authorised Inspecting officers / empanelled inspection agency or their representatives
An independent third party Professional Inspection Body can help buyer in mitigating buyer`s risk with pre-dispatch/post-dispatch inspection in order to ensure that equipment, components , solutions and documentation conform to contractual requirements. If an institutional buyer like Defense , Railways and MHA etc desires to ap ...Read More
Cost of Inspection in Term of Percentage
Type: FLOAT
195 Inspection goods NORMAL Pre-dispatch inspection at Seller premises (Fee/Charges to be borne by the BUYER): Before dispatch, the goods will be inspected by Buyer / Consignee or their Authorized Representative or by Nominated External Inspection Agency (independently or jointly with Buyer or Consignee as decided by the Buyer) at Seller premises (or at designated place for inspection as declared / communicated by the seller) for their compliance to the contract specifications. Fee/Charges taken by the External inspection ...Read More NA
196 Generic MASTER NORMAL Upload Manufacturer authorization: Wherever Authorised Distributors are submitting the bid, Manufacturers Authorisation Form (MAF)/Certificate with OEM details such as name, designation, address, e-mail Id and Phone No. required to be furnished along with the bid. NA
197 Generic goods NORMAL PESCO Certificate: PESCO Certificate shall be mandatory for procurement of bid items. NA
198 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL Issue of Free Issue Material (FIM): In case of certain fabrication contracts, the buyer shall provide Free Issue Material to the seller based on the tendering requirement. The Seller shall submit the necessary drawings/cutting for optimal utilization of FIM. Further, the Seller shall submit Indemnity Bond & Insurance Policy of equivalent value of FIM and shall be kept valid till such time the entire contract is executed and Material Accounting for the FIM is rendered by the form ...Read More NA
199 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL Quality surveillance:
1. Stores covered by the Contract shall be subjected to quality surveillance and inspection by the Purchaser’s authorised Inspector.
2. The Seller shall establish a quality surveillance and inspection plan in consultation with the Inspector or inspection agency and have it approved by the Purchaser before start of manufacture. The Seller shall give notice of readiness of Stores for inspection to the Inspector and shall perform all tests and inspecti ...Read More
NA
200 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL Indemnity / Insurance for FIM: The bidders shall provide the Indemnity bond and Insurance Policy corresponding to the value of the Free Issue Material (Buyer’s materials) being issued to the Seller for Contract performance in cases involving Gas cylinders refilling, Repair of equipment/ Instruments/, calibration of items, etc. NA
201 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL Fiscal Concessions for Nuclear Power Plant: Nuclear Power Project of capacity 440 MW or more have been notified by GOI for eligibility towards fiscal concessions. As such the goods required for setting up these projects are subject to ‘NIL’ Customs duty as per the extant policy of Government of India (vide Customs Notification No. 50/2017 dated 30-6-2017 and updated upto 05-12-2017 (in the list 32 at Sr. No. 602). In consideration of the aforesaid Fiscal Benefits, no customs ...Read More NA
202 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL Clause towards Civil Liability for Nuclear Damages: (CLND Act 2010 and Rule 2011)
In line with the CLND act section 17(a) and Rule 24 under Civil Liability for Nuclear Damage Rules, 2011:
The liability of the seller shall be to the extent of the value of the goods supplied or equivalent to the buyer`s liability whichever is lesser

And

The duration of Seller`s liability shall be limited to duration of initial license issued by AERB or the product liability per ...Read More
NA
203 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL De-minimis Level: It may kindly be noted that NPCIL has no reservation about import procurement, if it is necessary, for subject of package. However, bidder shall ensure that items to be imported to India do not have US origin components above the de-minimis level. NA
204 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL Non- Disclosure: The OEM/bidder has to sign a Non-Disclosure agreement with the buyer for Software license products like Anti-Virus solutions etc. NA
205 Purchase Preference (Centre) MASTER NORMAL Bid reserved for Make In India products: Procurement under this bid is reserved for purchase from Class 1 local suppliers as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local content to qualify as a class 1 local supplier is denoted in the bid document 50%. All bidders must upload a certificate from the OEM regarding the perc ...Read More NA
206 Purchase Preference (Centre) MASTER NORMAL Preference to Make In India products (For bids less than 200 Crore):Preference shall be given to Class 1 local supplier as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local content to qualify as a Class 1 local supplier is denoted in the bid document 50%. If the bidder wants to avail the Purchase preference, the bidder must u ...Read More NA
207 Purchase Preference (Centre) MASTER NORMAL Preference to Make In India products (for bids greater than 200 Crore) (can also be used in Bids less than 200 Crore but only after exemption by competent authority as defined in Deptt of Expenditure OM dated 28.5.2020): Preference shall be given to Class 1 local supplier as defined in public procurement (Preference to Make in India), Order 2017 as amended from time to time and its subsequent Orders/Notifications issued by concerned Nodal Ministry for specific Goods/Products. The minimum local c ...Read More NA
208 Warranty MASTER SLA Warranty period of the supplied products shall be ${warrantyPeriod} years from the date of final acceptance of goods or after completion of installation, commissioning & testing of goods (if included in the scope of supply), at consignee location. OEM Warranty certificates must be submitted by Successful Bidder at the time of delivery of Goods. The seller should guarantee the rectification of goods in case of any break down during the guarantee period. Seller should have well established Inst ...Read More Warranty period of the supplied products
Type: 1, 2, 3, 4, 5
209 Certificates MASTER SLA To be eligible for award of contract, Bidder / OEM must possess following Certificates / Test Reports on the date of bid opening (to be uploaded with bid): ${bidOpening}. Certificates / Test Reports on the date of bid opening
Type: ALPHA_NUMERIC
210 Past Project Experience MASTER NORMAL For fulfilling the experience criteria any one of the following documents may be considered as valid proof for meeting the experience criteria:
a. Purchase Order copy along with Invoice(s) with self-certification by the bidder that supplies against the invoices have been executed.
b. Execution certificate by client with order value.
c. Any other document in support of order execution like Third Party Inspection release note, etc.
NA
211 Generic MASTER SLA For Supply of Chemicals/Gases etc. in Cylinders, Bidders have to provide free rental period of ${rentalPeriod} days for supplied cylinders. Bidders have to Provide Free Rental Period in Days
Type: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30
212 Generic M35_Bharat-Petroleum-Corporation-Ltd SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
213 Generic M35_GRMD SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
214 Generic M35_INDIAN-OIL-CORPORATION-LIMITED SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
215 Generic M35_INDIAN-OIL-CORPORATION-LIMITED_IOC-Haldia-Refinery SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
216 Generic M35_D20181130_48 SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
217 Generic M35_D20181130_44 SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
218 Generic M35_GAIL-India-Limited SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
219 Generic O5037 SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
220 Generic D81_BPCL SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
221 Generic M35_AVIATION_INDIAN-OIL-CORPORATION-LTD SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
222 Generic D81_HPCL SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
223 Generic M35 SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
224 Generic D81_GAIL-India-Limited SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
225 Generic M35_MD_CP_GAIL-India-Limited SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
226 Generic M35_Petrotech-Secretariat_Oil-and-Natural-Gas-Corporation SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
227 Generic D81_Oil-and-Natural-Gas-Corporation-Limited SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
228 Generic M35_D20181130_42 SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
229 Generic M35_D20181130_48 SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
230 Generic M35_Geophysics_OIL-INDIA-LIMITED SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
231 Generic M35_D20181130_46 SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
232 Generic M35_AVIATION_INDIAN-OIL-CORPORATION-LTD SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
233 Generic O538 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
234 Generic M35_Bharat-Petroleum-Corporation-Ltd_Bharat-Petroleum-Corporation-Ltd SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
235 Generic M35 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
236 Generic M35_D20181130_46_O20181130_100 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
237 Generic D81_HPCL SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
238 Generic D99_Steel-Authority-of-India-Ltd SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
239 Generic D81_Oil-and-Natural-Gas-Corporation-Limited SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
240 Generic M35_Petrotech-Secretariat_Oil-and-Natural-Gas-Corporation SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
241 Generic O5037 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
242 Generic M35_MD_CP_GAIL-India-Limited SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
243 Generic M35_GAIL-India-Limited_GAIL-India-Limited SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
244 Generic D81_GAIL-India-Limited SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
245 Generic M35_Geophysics_OIL-INDIA-LIMITED SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
246 Generic M36_Pakri-Barwadih-Coal-Mining-Project_NTPC-Ltd SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
247 Generic D83_NTPC SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
248 Generic NTPC Limited SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
249 Generic D82_NTPC-Limited SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
250 Generic O312 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
251 Generic M11_D20100802_2_O16 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
252 Generic D99_RASHTRIYA-ISPAT-NIGAM-LTD SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
253 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
254 Generic M29_D20181130_35_O20181130_89 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
255 Generic M11_D20100802_2_O14 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
256 Generic O311 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
257 Generic O540 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
258 Generic M35_D20181130_42_O20181130_96 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
259 Generic M11_D20100802_2_O15 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
260 Generic O_M11_BHDL SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
261 Generic D6_The-Fertilisers-And-Chemicals-Travancore-Limited SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
262 Generic M35_MD_MRPL SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
263 Generic D10_SECL SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
264 Generic M11_D20100802_2_O19 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
265 Generic O319 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
266 Generic M41O_CSL SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
267 Generic M41_D20181130_134_O20181130_188 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
268 Generic M36_D20181130_88_O20181130_142 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
269 Generic OT1_Department-of-Atomic-Energy_Department-of-Atomic-Energy_Electronics-Corporation-of-India-Limited SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
270 Generic D109_O20181130_3 SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
271 Generic D81_BPCL SLA Registration / Empanelment Requirement: Contract shall be awarded to only such sellers , who are registered / empanelled / approved / enlisted with ${agencyName} for the required goods / service category on the date of bid opening. Prospective bidders (if not already registered), are advised to get themselves registered with the said registration authority before bid opening date. (It is certified that the registration is granted by the registering agency as per Rule 150 of GFR ...Read More Name Of Registering Agency
Type: ALPHA_NUMERIC
272 Human Resource Service MASTER NORMAL Prohibition from seeking deposits or security amounts: Seeking any deposits or security amounts from the deployed resource or any other form of monetary acceptance by the service provider is strictly prohibited. If any such complaint is received, incident will be raised on GeM portal for suitable action as per Incident Management Policy of GeM. In addition, buyer department may separately initiate suitable penal action as per their laid down norms. NA
273 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL PESCO Certificate: PESCO Certificate shall be mandatory for procurement of bid items. NA
274 Generic services NORMAL Duration of the service contract may be extended up to 6 months beyond the initial contract duration (subject to satisfactory performance and mutual consent). NA
275 Generic MASTER NORMAL While generating invoice in GeM portal, the seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST. NA
276 Generic D83_NTPC NORMAL

In case the bidder is not able to furnish its audited financial statements on standalone entity basis, the unaudited unconsolidated financial statements of the bidder can be considered acceptable provided the bidder furnishes the following further documents on substantiation of its qualification:

 • Copies of the unaudited unconsolidated financial statements of the bidder along with copies of the audited consolidated financial statements of the Holding Company.

 • A ...Read More

NA
277 Generic MASTER NORMAL Supplier shall ensure that the Invoice is raised in the name of Consignee with GSTIN of Consignee only. NA
278 Generic D83_NTPC NORMAL Weighment at NTPC end shall be final for accounting purpose. NA
279 Generic MASTER SLA NON DISCLOSURE DECLARATION CERTIFICATE (On Bidder Letter Head) to be uploaded with bid:

1. I M/s. ${nameMs} hereby declare that I shall not disclose the contract or any provision, specification, plan, design, pattern, sample or information thereof to any third party during and after expiry of Contract.

2. If defying the norms as per the Contract a legal action may be taken against me as per the existing Rules.

Place enter name(M/s.)
Type: ALPHA_NUMERIC
280 Generic S31_NTPC NORMAL

In case the bidder is not able to furnish its audited financial statements on standalone entity basis, the unaudited unconsolidated financial statements of the bidder can be considered acceptable provided the bidder furnishes the following further documents on substantiation of its qualification:

 • Copies of the unaudited unconsolidated financial statements of the bidder along with copies of the audited consolidated financial statements of the Holding Company.

 • A ...Read More

NA
281 Generic S31_NTPC NORMAL Weighment at NTPC end shall be final for accounting purpose. NA
282 Generic M35_AVIATION_INDIAN-OIL-CORPORATION-LTD NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
283 Generic M35_AVIATION_INDIAN-OIL-CORPORATION-LTD NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
284 Generic M35_AVIATION_INDIAN-OIL-CORPORATION-LTD SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
285 Generic O538 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
286 Generic O538 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
287 Generic O538 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
288 Generic M35_Bharat-Petroleum-Corporation-Ltd_Bharat-Petroleum-Corporation-Ltd NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
289 Generic M35_Bharat-Petroleum-Corporation-Ltd_Bharat-Petroleum-Corporation-Ltd NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
290 Generic M35_Bharat-Petroleum-Corporation-Ltd_Bharat-Petroleum-Corporation-Ltd SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
291 Generic D81_BPCL NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
292 Generic D81_BPCL NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
293 Generic D81_BPCL SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
294 Generic M35 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
295 Generic M35 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
296 Generic M35 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
297 Generic D81_HPCL NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
298 Generic D81_HPCL NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
299 Generic D81_HPCL SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
300 Generic D99_Steel-Authority-of-India-Ltd NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
301 Generic D99_Steel-Authority-of-India-Ltd NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
302 Generic D99_Steel-Authority-of-India-Ltd SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
303 Generic D81_Oil-and-Natural-Gas-Corporation-Limited NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
304 Generic D81_Oil-and-Natural-Gas-Corporation-Limited NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
305 Generic D81_Oil-and-Natural-Gas-Corporation-Limited SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
306 Generic M35_Petrotech-Secretariat_Oil-and-Natural-Gas-Corporation NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
307 Generic M35_Petrotech-Secretariat_Oil-and-Natural-Gas-Corporation NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
308 Generic M35_Petrotech-Secretariat_Oil-and-Natural-Gas-Corporation SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
309 Generic O5037 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
310 Generic O5037 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
311 Generic O5037 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
312 Generic M35_MD_CP_GAIL-India-Limited NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
313 Generic M35_MD_CP_GAIL-India-Limited NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
314 Generic M35_MD_CP_GAIL-India-Limited SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
315 Generic M35_GAIL-India-Limited_GAIL-India-Limited NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
316 Generic M35_GAIL-India-Limited_GAIL-India-Limited NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
317 Generic M35_GAIL-India-Limited_GAIL-India-Limited SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
318 Generic D81_GAIL-India-Limited NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
319 Generic D81_GAIL-India-Limited NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
320 Generic D81_GAIL-India-Limited SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
321 Generic M35_Geophysics_OIL-INDIA-LIMITED NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
322 Generic M35_Geophysics_OIL-INDIA-LIMITED NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
323 Generic M35_Geophysics_OIL-INDIA-LIMITED SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
324 Generic M35_D20181130_46_O20181130_100 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
325 Generic M35_D20181130_46_O20181130_100 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
326 Generic M35_D20181130_46_O20181130_100 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
327 Generic M36_Pakri-Barwadih-Coal-Mining-Project_NTPC-Ltd NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
328 Generic M36_Pakri-Barwadih-Coal-Mining-Project_NTPC-Ltd NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
329 Generic M36_Pakri-Barwadih-Coal-Mining-Project_NTPC-Ltd SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
330 Generic D83_NTPC NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
331 Generic D83_NTPC NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
332 Generic D83_NTPC SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
333 Generic NTPC Limited NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
334 Generic NTPC Limited NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
335 Generic NTPC Limited SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
336 Generic D82_NTPC-Limited NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
337 Generic D82_NTPC-Limited NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
338 Generic D82_NTPC-Limited SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
339 Generic O312 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
340 Generic O312 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
341 Generic O312 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
342 Generic M11_D20100802_2_O16 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
343 Generic M11_D20100802_2_O16 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
344 Generic M11_D20100802_2_O16 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
345 Generic D99_RASHTRIYA-ISPAT-NIGAM-LTD NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
346 Generic D99_RASHTRIYA-ISPAT-NIGAM-LTD NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
347 Generic D99_RASHTRIYA-ISPAT-NIGAM-LTD SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
348 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
349 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
350 Generic D109_NUCLEAR-POWER-CORPORATION-OF-INDIA-LIMITED SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
351 Generic OT1_Nuclear-power-corporation-of-india NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
352 Generic OT1_Nuclear-power-corporation-of-india NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
353 Generic OT1_Nuclear-power-corporation-of-india SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
354 Generic M29_D20181130_35_O20181130_89 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
355 Generic M29_D20181130_35_O20181130_89 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
356 Generic M29_D20181130_35_O20181130_89 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
357 Generic M11_D20100802_2_O14 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
358 Generic M11_D20100802_2_O14 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
359 Generic M11_D20100802_2_O14 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
360 Generic O311 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
361 Generic O311 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
362 Generic O311 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
363 Generic O540 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
364 Generic O540 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
365 Generic O540 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
366 Generic M35_D20181130_42_O20181130_96 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
367 Generic M35_D20181130_42_O20181130_96 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
368 Generic M35_D20181130_42_O20181130_96 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
369 Generic M11_D20100802_2_O15 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
370 Generic M11_D20100802_2_O15 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
371 Generic M11_D20100802_2_O15 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
372 Generic O_M11_BHDL NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
373 Generic O_M11_BHDL NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
374 Generic O_M11_BHDL SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
375 Generic D6_The-Fertilisers-And-Chemicals-Travancore-Limited NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
376 Generic D6_The-Fertilisers-And-Chemicals-Travancore-Limited NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
377 Generic D6_The-Fertilisers-And-Chemicals-Travancore-Limited SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
378 Generic M35_MD_MRPL NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
379 Generic M35_MD_MRPL NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
380 Generic M35_MD_MRPL SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
381 Generic D10_SECL NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
382 Generic D10_SECL NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
383 Generic D10_SECL SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
384 Generic M11_D20100802_2_O19 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
385 Generic M11_D20100802_2_O19 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
386 Generic M11_D20100802_2_O19 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
387 Generic O319 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
388 Generic O319 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
389 Generic O319 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
390 Generic M41O_CSL NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
391 Generic M41O_CSL NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
392 Generic M41O_CSL SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
393 Generic M41_D20181130_134_O20181130_188 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
394 Generic M41_D20181130_134_O20181130_188 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
395 Generic M41_D20181130_134_O20181130_188 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
396 Generic M36_D20181130_88_O20181130_142 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
397 Generic M36_D20181130_88_O20181130_142 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
398 Generic M36_D20181130_88_O20181130_142 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
399 Generic OT1_Department-of-Atomic-Energy_Department-of-Atomic-Energy_Electronics-Corporation-of-India-Limited NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
400 Generic OT1_Department-of-Atomic-Energy_Department-of-Atomic-Energy_Electronics-Corporation-of-India-Limited NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
401 Generic OT1_Department-of-Atomic-Energy_Department-of-Atomic-Energy_Electronics-Corporation-of-India-Limited SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
402 Generic D109_O20181130_3 NORMAL HIRING OF SECURITY MANPOWER:
1. Only Bidders sponsored and registered / empanelled by DGR for Buyer Organization are required to quote their service charges as per DPE/MOD/ DGR guidelines. Agencies quoting services charges above or below DPE/MOD/DGR prescribed service charges their bid would stand rejected. In case of a tie in service charges the contract would be awarded to the senior most DGR sponsored ESM as per DGR Sponsored letter.
2. The wages payable to personnel de ...Read More
NA
403 Generic D109_O20181130_3 NORMAL

Bidder shall submit the following documents along with their bid for Vendor Code Creation:

 a. Copy of PAN Card.

 b. Copy of GSTIN.

 c. Copy of Cancelled Cheque.

 d. Copy of EFT Mandate duly certified by Bank.

NA
404 Generic D109_O20181130_3 SLA Buyer Organization specific Integrity Pact shall have to be complied by all bidders. Successful bidder shall have to submit signed integrity pact as per Buyer organizations policy. ${successfulBidder} Successful bidder shall have to submit(value type URL shown as hyperlink)
Type: HYPERLINK
405 Generic MASTER SLA

Quantity Variation of Price format

 a) Quantity variation (+/- 20%) to complete the ship shall be considered by the firm for the supply of ${supplyQuantity} from the quantity worked out by the firm based on applicable drawings attached in Purchase Technical Specification.

 b) Any change in the quantity of these items required to complete the ship beyond the variation mentioned above (+/- 20%) shall be considered as a variation order and unit quantity rates as per price ...Read More

1. Quantity Variation (+/- 20%) to Complete the ship shall be Considered by the firm for the Supply
Type: ALPHA_NUMERIC
2. Supply of all Items other than (+/- 5%) to Complete
Type: ALPHA_NUMERIC
406 Generic MASTER NORMAL Buyer reserves the right to postpone schedule of material supply after finalisation of order by 6 months without any additional cost implication. NA
407 Generic MASTER NORMAL Receipt inspection at yard shall be carried out by Buyer QC team and or or any external agency nominated by Buyer jointly with Seller representative. All requisite documentation including packing list, certificates, approved drawings etc are to be submitted to Buyer in advance for enabling inspection. Detailed Packing list (considered as actual supply quantity) shall clearly mention individual items in package and shall be the basis for physical inspection on receipt. NA
408 Generic MASTER NORMAL

The scope of work involves placement of filled gas cylinders in position for connecting to manifold and removal of empty cylinders after disconnecting from the manifold, as directed by buyer’s authorized representatives.

 a) Collection of empty cylinders from CSL

 b) Loading / Unloading of cylinders at CSL

NA
409 Generic MASTER NORMAL Loading and Unloading at yard will be under the scope of the supplier. NA
410 Generic MASTER NORMAL Products supplied shall be nontoxic and harmless to health. In the case of toxic materials, Material Safety Data Sheet may be furnished along with the material. NA
411 Generic MASTER NORMAL Calculation of Quantity:

The quantity of gas actually consumed in each batch of supply shall be acknowledged and accounted. For calculating the quantity of gas consumed in each batch, following procedures shall be followed.

 1) Weighment of vehicle with filled gas cylinders at the time of arrival.

 2) Weighment of empty vehicle after unloading of gas cylinders.

 3) Weighment of vehicle before loading of empty cylinders.

 4) Weighment ...Read More

NA
412 Generic MASTER NORMAL Delivery is required on ‘As and when required basis’ within 7 days of issue of delivery advice. NA
413 Generic MASTER SLA Whereever Essentiality Certificate is applicable (PEL/ML), successful bidder should provide Proforma Invoice for processeing for EC application and material should be dispatche after receiving of EC rom DGH. In view of the same, an ATC may be incorporated in GeM, viz, "BIDDER/OEM must provide Proforma Invoice for processeing for EC application within ${ecApplication} days from date of issue of GeM Contract and material should be dispatche after receiving of EC rom DGH." BIDDER/OEM must provide Proforma Invoice for processeing for EC application
Type: ALPHA_NUMERIC
414 Generic MASTER NORMAL

Pre despatch inspection will be carried out by any one of the buyer’s approved third party inspection agency (TPIA) viz. IRS / Lloyds /RITES/ Bureau Veritas / DNV and TURBOSCOPE VETCO. The scope of 3rd party inspection will be as follows:

 a) Inspection of quality as per order during production.

 b) Checking of bag specification and weight of bags randomly during the production operation.

 c) Bonding of warehouse after completion of production/ inspection /t ...Read More

NA
415 Generic MASTER NORMAL

Pre despatch inspection will be carried out by any one of the buyer’s approved third party inspection agency (TPIA) viz. IRS / Lloyds /RITES/ Bureau Veritas / DNV and TURBOSCOPE VETCO. The scope of 3rd party inspection will be as follows:

 a) Inspection of quality as per order during production.

 b) Checking of bag specification and weight of bags randomly during the production operation.

 c) Bonding of warehouse after completion of production/ inspection /t ...Read More

NA
416 Generic MASTER NORMAL

Third Party Inspection (All test results to be documented and submitted to the buyer by the third party):

 (a) Third party inspection is to be carried out by any one of the buyer’s approved Third party inspection agency i.e. by IRS / Lloyds /RITES / Bureau Veritas / DNV and TUBOSCOPE VETCO.

 (b) Raw material inspection for chemical composition and mechanical properties as specified in BIS:1239(Part-1):Latest Edition.10% of number of heats of raw material and 10% of num ...Read More

NA
417 Generic MASTER NORMAL

(a) Third party inspection is to be carried out by BUYER’S approved Third party inspection agency i.e. by IRS / Lloyds /RITES / Bureau Veritas / DNV and TUBOSCOPE VETCO.

(b) Raw material inspection for Chemical composition & Mechanical Properties.

(c) Verification of certificate provided by the supplier for raw material from reputed manufacturer like TATA, SAIL, etc. specifying clearly suitability of material for manufacturing of pipe.

(d) Finished Tube Inspection: Checkin ...Read More

NA
418 Generic MASTER NORMAL ISO 27001: 2018 for Information Technology Services. NA
419 Generic MASTER NORMAL Capability Maturity Model Integration (CMMI) for Software developments. NA
420 Purchase Preference (Centre) MASTER SLA Procurement under this bid is reserved for purchase from : ${purchaseFrom} Procurement under this bid is reserved for purchase from
Type: Micro and Small Enterprises whose credentials are validated online through Udyog Aadhaar for that product category., Micro and Small Enterprises from the State of Bid Inviting ...Read More
421 Purchase Preference (Centre) MASTER SLA Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs as defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order, 2012 dated 23.03.2012 issued by Ministry of Micro, Small and Medium Enterprises and its subsequent Orders/Notifications issued by concerned Ministry. If the bidder wants to avail the Purchase preference, the bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are ex ...Read More Required Percentage
Type: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56 ...Read More
422 Scope of Supply goods SLA Scope of supply (Bid price to include all cost components) : ${scopeOfSupply} Scope of supply (Bid price to include all cost components)
Type: Only supply of Goods, Supply Installation Testing and Commissioning of Goods, Supply Installation Testing Commissioning of Goods and Training of operators and providing Stat ...Read More
423 Service & Support goods SLA Availability of service Centres : ${availabilityOfSC} Availability of service Centres
Type: Bidder /OEM must have Service Centre In the State of each Consignee's Location, Bidder /OEM must have Service Centre In the District of each Consignee's Location
424 Inspection goods SLA Pre-dispatch inspection at Seller premises (Fee/Charges to be borne by the SELLER): Before dispatch, the goods will be inspected by Buyer / Consignee or their Authorized Representative or by Nominated External Inspection Agency (independently or jointly with Buyer or Consignee as decided by the Buyer) at Seller premises for their compliance to the contract specifications. Fee/Charges taken by the External inspection Agency and any external laboratories testing charges shall be borne by the SELLE ...Read More 1. Tests required to be conducted during pre-dispatch inspection:
Type: ALPHA_NUMERIC
2. INSPECTION AGENCY : The inspection agency will conduct the ...Read More
425 Generic MASTER NORMAL

Special Terms and Conditions as defined by world bank at click here will also be applicable

NA
426 Buyer Specific M11 NORMAL

Additional Terms and conditions would also be applicable. Please click here to view the Additional Terms and conditions.

NA
427 Generic MASTER NORMAL

The scope of work involves placement of filled gas cylinders in position for connecting to manifold and removal of empty cylinders after disconnecting from the manifold, as directed by buyer’s authorized representatives.

 a) Collection of empty cylinders from CSL

 b) Loading / Unloading of cylinders at CSL

NA
428 Generic MASTER NORMAL Loading and Unloading at yard will be under the scope of the supplier. NA
429 Generic MASTER SLA Whereever Essentiality Certificate is applicable (PEL/ML), successful bidder should provide Proforma Invoice for processeing for EC application and material should be dispatche after receiving of EC rom DGH. In view of the same, an ATC may be incorporated in GeM, viz, "BIDDER/OEM must provide Proforma Invoice for processeing for EC application within ${ecApplication} days from date of issue of GeM Contract and material should be dispatche after receiving of EC rom DGH." BIDDER/OEM must provide Proforma Invoice for processeing for EC application
Type: ALPHA_NUMERIC
430 Generic MASTER NORMAL ISO 27001: 2018 for Information Technology Services. NA
431 Past Project Experience MASTER NORMAL

Commercial Experience Eligibility Criteria:

For experience, the order(s) executed by the bidder, during the last five years ending on the last day of the month immediately preceding the month in which the last date of bid submission falls, should be considered as under:


Three orders each executed for “similar item” where executed value is not less than the amount equal to 30% of the estimated cost.

     OR

Two orders each executed for “s ...Read More

NA
432 Past Project Experience MASTER SLA

Commercial Experience Eligibility Criteria:

For experience, the order(s) executed by the bidder, during the last five years ending on the last day of the month immediately preceding the month in which the last date of bid submission falls, should be considered as under:


Three orders each executed for similar item(such as ${similarItem1}) where executed value is not less than the amount equal to 30% of the estimated cost.(i.e Rs. ${itemCost1})

OR

Two orders each execut ...Read More

1. Three orders each executed for similar item
Type: ALPHA_NUMERIC
2. Executed value is not less than the amount equal to 30% of the estimated cost
Type: FLOAT
3. Two orders each executed for similar item
Type: ...Read More
433 Purchase Preference (Centre) M35 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
434 Purchase Preference (Centre) M21 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
435 Purchase Preference (Centre) M45 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
436 Purchase Preference (Centre) M36 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
437 Purchase Preference (Centre) M11 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
438 Purchase Preference (Centre) M53 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
439 Purchase Preference (Centre) M29 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
440 Purchase Preference (Centre) M3 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
441 Purchase Preference (Centre) M5 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
442 Purchase Preference (Centre) M41 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
443 Purchase Preference (Centre) M35 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
444 Purchase Preference (Centre) M21 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
445 Purchase Preference (Centre) M45 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
446 Purchase Preference (Centre) M36 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
447 Purchase Preference (Centre) M11 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
448 Purchase Preference (Centre) M53 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
449 Purchase Preference (Centre) M29 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
450 Purchase Preference (Centre) M3 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
451 Purchase Preference (Centre) M5 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
452 Purchase Preference (Centre) M41 NORMAL

Purchase Preference linked with Local Content (PP-LC) Policy:


The bid clause regarding “Preference to Make In India products” stands modified in this bid and shall be governed by the PPLC Policy No. FP-20013/2/2017-FP-PNG dated 17.09.2020 issued by MoP&NG as amended up to date. Accordingly, bidders with Local Content less than or equal to 20% will be treated as “Non Local Supplier”. The prescribed LC shall be applicable on the date of Bid opening. Sanctions on the bidders fo ...Read More

NA
453 Generic MASTER SLA Detailed protocols and rules to be followed by the transporter / vehicles entering into the Refinery to ensure the smooth delivery are available at ${specificConfirmation} . This protocol will also form part of contract. A specific confirmation will have to be uploaded by Seller along with the bid. Uploaded Specific Confirmation(value type URL shown as hyperlink)
Type: HYPERLINK
454 Generic MASTER NORMAL Indemnity / Insurance for FIM: The bidders shall provide the Indemnity bond and Insurance Policy corresponding to the value of the Free Issue Material (Buyer’s materials) being issued to the Seller for Contract performance in cases involving Gas cylinders refilling, Repair of equipment/ Instruments/, calibration of items, etc. NA
455 Generic MASTER NORMAL Except with the written consent of the Buyer, the participating bidders shall not disclose any technical specifications, plan, drawings, pattern or information thereof, to any third party, unless the same is already available in Public Domain. NA