GeM Logo
A- A A+ T

Draft Transition Strategy / Suggestions

Draft Technical Parameters / Suggestions

Handloom Equipments for textile machines
Posted On: 22/10/2018

Technical parameters have been prepared for creation of category of Handloom Equipments for textile machines in the GeM Portal All stakeholders are requested to give comments or suggestions within one week from 22 october 2018 to 29 October 2018

Welding Rod for Manual Metal Arc Welding of Carbon and Carbon Mangnesse Steel
Posted On: 22/10/2018

Technical parameters have been prepared for creation of category of Welding Rod for Manual Metal Arc Welding of Carbon and Carbon Mangnesse Steel in the GeM Portal All stakeholders are requested to give comments or suggestions within one week from 22...

Technical parameters of Dental chair unit complete with accessories
Posted On: 22/10/2018

Draft TP for Dental chair unit complete with accessories requested from AFMSD is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 22 Oct 2018 to 2nd Nov 2018 for consideration

Vitrectomy Machine with Phacoemulsification
Posted On: 18/10/2018

Technical parameters have been prepared for creation of category of Vitrectomy Machine with Phacoemulsification in the GeM Portal All stakeholders are requested to give comments or suggestions within two weeks from 18 October 2018 to 1 November 2018

Visual Field Analyser
Posted On: 18/10/2018

Technical parameters have been prepared for creation of category of Visual Field Analyser in the GeM Portal All stakeholders are requested to give comments or suggestions within two weeks from 18 October 2018 to 1 November 2018

Keratometer
Posted On: 18/10/2018

Technical parameters have been prepared for creation of category of Keratometer in the GeM Portal All stakeholders are requested to give comments or suggestions within two weeks from 18 October 2018 to 1 November 2018

Autolensometer
Posted On: 18/10/2018

Technical parameters have been prepared for creation of category of Autolensometer in the GeM Portal All stakeholders are requested to give comments or suggestions within two weeks from 18 October 2018 to 1 November 2018

Phototherapy machine for SNCU
Posted On: 18/10/2018

Technical parameters have been prepared for creation of category of Phototherapy machine for SNCU in the GeM Portal All stakeholders are requested to give comments or suggestions within two weeks from 18 October 2018 to 1 November 2018

High Definition Laproscopic Surgery System
Posted On: 18/10/2018

Technical parameters have been prepared for creation of category of High Definition Laproscopic Surgery System in the GeM Portal All stakeholders are requested to give comments or suggestions within two weeks from 18 October 2018 to 1 Novembe...

Automated Micro ELISA Processor
Posted On: 18/10/2018

Technical parameters have been prepared for creation of category of Automated Micro ELISA Processor in the GeM Portal All stakeholders are requested to give comments or suggestions within two weeks from 18 october 2018 to 1 november 2018

Anesthesia Workstation
Posted On: 18/10/2018

Technical parameters have been prepared for creation of category of Anesthesia Workstation in the GeM Portal All stakeholders are requested to give comments or suggestions within two weeks from 18 october 2018 to 1 november 2018

Photo Slit Lamp with applanation Tonometer
Posted On: 12/10/2018

Draft TP for Photo Slit Lamp with applanation Tonometer used in Ophthalmology Department is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 12th Oct 2018 to 19th oct 2018 for consideration

Ophthalmic opertating Microscope
Posted On: 12/10/2018

Draft TP for Ophthalmic opertating Microscope used in Ophthalmology Department is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 12th Oct 2018 to 19th oct 2018 for consideration

Non Contact Tonometer
Posted On: 12/10/2018

Draft TP for Non Contact Tonometer used in Ophthalmogy Department is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 12th Oct 2018 to 19th oct 2018 for consideration

ND YAG Laser (Ophthalmic)
Posted On: 12/10/2018

Draft TP for ND YAG Laser (Ophthalmic) used in Ophthalmogy Department is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 12th Oct 2018 to 19th oct 2018 for consideration

Digital Fundus Camera
Posted On: 12/10/2018

Draft TP for Digital Fundus Camera used in Ophthalmogy Department is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 12th Oct 2018 to 19th oct 2018 for consideration

FORENSIC ULTRAVIOLET LIGHT SOURCE LARGE
Posted On: 11/10/2018

Draft TP for FORENSIC ULTRAVIOLET LIGHT SOURCE LARGE is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 11th October 2018 to 18th October 2018 for consideration

FORENSIC ULTRAVIOLET LIGHT SOURCE MEDIUM
Posted On: 11/10/2018

Draft TP for FORENSIC ULTRAVIOLET LIGHT SOURCE MEDIUM is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 11th October 2018 to 18th October 2018 for consideration

FORENSIC ULTRAVIOLET LIGHT SOURCE SMALL
Posted On: 11/10/2018

Draft TP for FORENSIC ULTRAVIOLET LIGHT SOURCE SMALL is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 11th October 2018 to 18th October 2018 for consideration

Draft TP for PVC Copper cable, Single and multi core, Circular, Sheathed Cord with flexible Conductor for Working Voltages Up to and including 1100
Posted On: 11/10/2018

Draft T.P. for PVC Copper cable, Single and multi core, Circular, Sheathed Cord with flexible Conductor for Working Voltages Up to and including 1100 Volts Suggestions / Feedback are invited from all stake holders from 11th October to 16th October 20...

Draft TP for PVC Copper cable, Single and multi core, Circular, Sheathed cable with flexible Conductor for Working Voltages Up to and including 1100 Volts.
Posted On: 11/10/2018

Draft T.P. TP for PVC Copper cable, Single and multi core, Circular, Sheathed cable with flexible Conductor for Working Voltages Up to and including 1100 Volts. Suggestions / Feedback are invited from all stake holders from 11th October to 16th Oct...

Draft TP for PVC Copper cable, Multi core, Circular, Sheathed Cables with flexible Conductor for Working Voltages Up to and including 1100 Volts.
Posted On: 11/10/2018

Draft T.P. TP for PVC Copper cable, Multi core, Circular, Sheathed Cables with flexible Conductor for Working Voltages Up to and including 1100 Volts. Suggestions / Feedback are invited from all stake holders from 11th October to 16th October 2018 f...

Draft TP for PVC Aluminium cable, Single and multi core, Circular, Sheathed cable with Rigid Conductor for Working Voltages Up to and including 1100 Volts.
Posted On: 11/10/2018

Draft T.P. TP for PVC Aluminium cable, Single and multi core, Circular, Sheathed cable with Rigid Conductor for Working Voltages Up to and including 1100 Volts. Suggestions / Feedback are invited from all stake holders from 11th October to 16th...

Draft TP for PVC Copper cable, Single and multi core, Circular, Sheathed cable with Rigid Conductor for Working Voltages Up to and including 1100 Volts.
Posted On: 11/10/2018

Draft T.P. TP for PVC Copper cable, Single and multi core, Circular, Sheathed cable with Rigid Conductor for Working Voltages Up to and including 1100 Volts. Suggestions / Feedback are invited from all stake holders from 11th October to 16th Oct...

Draft TP for PVC Aluminium cable, 1 core, Unsheathed with Rigid Conductor for Working Voltages Up to and including 1100 Volts
Posted On: 11/10/2018

Draft T.P. TP for PVC Aluminium cable, 1 core, Unsheathed with Rigid Conductor for Working Voltages Up to and including 1100 Volts published. Suggestions / Feedback are invited from all stake holders from 11th October to 16th October 2018 for cons...

Draft TP for PVC Copper cable, 1 core, Unsheathed with Rigid Conductor for Working Voltages Up to and including 1100 Volts
Posted On: 11/10/2018

Draft T.P. TP for PVC Copper cable, 1 core, Unsheathed with Rigid Conductor for Working Voltages Up to and including 1100 Volts published. Suggestions / Feedback are invited from all stake holders from 11th October to 16th October 2018 for conside...

Cold Chisel
Posted On: 10/10/2018

Draft TP for cold chisel is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 10th Oct 2018 to 17th oct 2018 for consideration

Keyhole Saw
Posted On: 10/10/2018

Draft TP for Keyhole Saw is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 10th oct 2018 to 17th oct 2018 for consideration

Hand saw
Posted On: 10/10/2018

Draft TP for Hand saw is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 10th October 2018 to 17th october 2018 for consideration

Draft TP for pencil box is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 9th oct 2018 to 16th oct for consideration
Posted On: 09/10/2018

Draft TP for pencil box is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 9th oct 2018 to 16th oct for consideration

Draft TP for offset printing ink black is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 9th oct 2018 to 16th oct for consideration
Posted On: 09/10/2018

Draft TP for offset printing ink black is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 9th oct 2018 to 16th oct for consideration

Draft TP for Amyl alcohol is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 9th oct 2018 to 16th oct for consideration
Posted On: 09/10/2018

Draft TP for Amyl alcohol is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 9th oct 2018 to 16th oct for consideration

Draft TP for Albums first day covers brochure and various philately packs required by the philately department is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 9th oct 2018 to 16th for consideration
Posted On: 09/10/2018

Draft TP for Albums first day covers brochure and various philately packs required by the philately department is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 9th oct 2018 to 16th oct for considera...

Draft TP for Precast Concrete Blocks is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Precast Concrete Blocks is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Transformer oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Transformer oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Door Handles is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Door Handles is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Wiro Ring is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Wiro Ring is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Binding Covers is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Binding Covers is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Spiral Comb Ring is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Spiral Comb Ring is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Thermal Folder is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Thermal Folder is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Laminating Pouch is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Laminating Pouch is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Laminating Film Rolls is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Laminating Film Rolls is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Turbine Lubricating Oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Turbine Lubricating Oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Draft TP for Oil Cylinder is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration
Posted On: 09/10/2018

Draft TP for Oil Cylinder is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 9th October 2018 to 15th October 2018 for consideration

Technical parameters for weigh bridge
Posted On: 08/10/2018

Draft TP for weigh bridge used in Municipal Corporations is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 8th oct 2018 to 15th oct 2018 for consideration

Technical parameters for Portable weigh load balance
Posted On: 08/10/2018

Draft TP for Portable weigh load balance used in Municipal Corporations is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 8th oct 2018 to 15th oct 2018 for consideration

Direct action handpump (Hand Pumps)
Posted On: 05/10/2018

Direct action handpump (Hand Pumps)

Fire Monitor (Fire sprinkler systems )
Posted On: 05/10/2018

Fire Monitor (Fire sprinkler systems )

Small Foam Tender for fire brigade use
Posted On: 05/10/2018

Small Foam Tender for fire brigade use

Water tender type 'X' for Fire brigade use
Posted On: 05/10/2018

Water tender type 'X' for Fire brigade use

Foam Tender NDRF or Fire or rescue trucks
Posted On: 05/10/2018

Foam Tender NDRF or Fire or rescue trucks

Dental Mouth Props –(RBSK)
Posted On: 05/10/2018

Draft TP for Dental Mouth Props –(RBSK) prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 5th October 2018 to 11th October 2018 for consideration

Draft TP for High Voltage Tester
Posted On: 05/10/2018

Draft T.P. for High Voltage Tester prepared and published. Suggestions / Feedback are invited from all stake holders from 5th October to 11th October 2018 for consideration.

Draft TP for Beaten rice is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Beaten rice is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Besan is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Besan is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Chana dal is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Chana dal is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Chilli is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Chilli is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Clove is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Clove is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Dental Chisel, Large
Posted On: 05/10/2018

Draft TP for Dental Chisel, Large prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 5th October 2018 to 11th October 2018 for consideration

Draft TP for Coconut powder is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Coconut powder is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Coriander is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Coriander is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Dehydrated peas is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Dehydrated peas is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Dried peas is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Dried peas is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Garam masala is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Garam masala is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Green peas is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Green peas is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Maida is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Maida is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Masoor dal is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Masoor dal is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Milk is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Milk is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Milk powder is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Milk powder is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for moong dal is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Moong dal is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Mustard is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Mustard is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Pickles is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Pickles is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for putty for window glass is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for putty for window glass is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Rajma is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Rajma is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Soybean oil is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Soybean oil is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Suji rava is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Suji rava is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Sunflower oil is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Sunflower oil is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Toothpaste is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Toothpaste is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Urad dalis prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Urad dalis prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Vinegar is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Vinegar is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Wheat atta is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Wheat atta is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Cumin is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Cumin is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Draft TP for Kabli chana is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration
Posted On: 05/10/2018

Draft TP for Kabli chana is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 5th Oct 2018 to 12 oct 2018 for consideration

Needle Holders for Paediatric Surgery –(RBSK)
Posted On: 04/10/2018

Draft TP for Needle Holders for Paediatric Surgery –(RBSK) prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 4th October 2018 to 10th October 2018 for consideration

Receptive-Expressive Emergent Language Test—Third Edition (REEL–3)
Posted On: 04/10/2018

Draft TP for Receptive-Expressive Emergent Language Test—Third Edition (REEL–3) prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 4th October 2018 to 10th October 2018 for consideration

Dental Explorers -(RBSK)
Posted On: 03/10/2018

Draft TP for Dental Explorers -(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 3rd October 2018 to 9th October 2018 for consideration

Bone Chisel for Dentistry –(RBSK)
Posted On: 03/10/2018

Draft TP for Bone Chisel for Dentistry –(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 3rd October 2018 to 9th October 2018 for consideration

Dental Straight Probes –(RBSK)
Posted On: 03/10/2018

Draft TP for Dental Straight Probes –(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 3rd October 2018 to 9th October 2018 for consideration

Dental Cement Spatula -(RBSK)
Posted On: 03/10/2018

Draft TP for Dental Cement Spatula -(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 3rd October 2018 to 9th October 2018 for consideration

Technical particulars for Dental Radiovisiography RVG unit with accessories
Posted On: 03/10/2018

Technical Parameters prepared for creation of category of Dental radiovisiography as per request received from DGAFMS is attached here with All stake holders are requested to indicate suggestion and comments if any by 9th October

First Field Dressing for Soldiers
Posted On: 03/10/2018

Draft TP for First Field Dressing for Soldiers prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 3rd October 2018 to 9th October 2018 for consideration

Draft TP for postal items is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 3rd oct 2018 to 10th Oct 2018 for consideration
Posted On: 03/10/2018

Draft TP for postal items is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 3rd oct 2018 to 10th Oct 2018 for consideration

Technical particulars for Vein viewer devices
Posted On: 02/10/2018

Technical Parameters prepared for creation of category of Vein viewer device as per request received from Hospitals is attached here with All stake holders are requested to indicate suggestion and comments if any by 8th October

Technical particulars for Combination therapy unit of Electro therapy and ultrasound
Posted On: 02/10/2018

Technical parameters for creation of category for combination therapy unit of Electro therapy and ultrasound on the basis of suggestion received from Safdarjung Hospital is attatched herewith.All stake holders are requested to forward their suggestio...

Cheatle Forceps –(RBSK)
Posted On: 01/10/2018

Draft TP for Cheatle Forceps –(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 1st October 2018 to 7th October 2018 for consideration

Cheek Retractors-Dental -(RBSK)
Posted On: 01/10/2018

Draft TP for Cheek Retractors-Dental -(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 1st October 2018 to 7th October 2018 for consideration

Technical particulars for combination therapy deep oscillation
Posted On: 28/09/2018

Technical parameters for creation of category for combination therapy deep oscillation on the basis of suggestion received from Safdarjung Hospital is attatched herewith.All stake holders are requested to forward their suggestions/comments for c...

Technical particulars for bipolar and ultrasonic generator
Posted On: 28/09/2018

Technical parameters for creation of category for bipolar and ultrasonic generator on the basis of suggestion received from LNJP Hospital is attatched herewith.All stake holders are requested to forward their suggestions/comments for changes if...

Handheld Forensic Magnifier
Posted On: 28/09/2018

Draft TP for Handheld Forensic Magnifier is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 28th September 2018 to 4th October 2018 for consideration

Stand Type Forensic Magnifier
Posted On: 28/09/2018

Draft TP for Stand Type Forensic Magnifier is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 28th September 2018 to 4th October 2018 for consideration

Ridge Counters
Posted On: 28/09/2018

Draft TP for Ridge Counters is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 28th September 2018 to 4th October 2018 for consideration

Head Mount Spectacle Magnifier
Posted On: 28/09/2018

Draft TP for Head Mount Spectacle Magnifier is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 28th September 2018 to 4th October 2018 for consideration

Centre Punch
Posted On: 28/09/2018

The technical parameters for creation of category for Centre Punch as per IS 7177 1974 is enclosed herewith All stake holders are requested to give there comments if any regarding the technical parameters with in 7 days from 28th Sept 2018 to 5t...

Technical particulars for Squadron
Posted On: 26/09/2018

Draft T P for Squadron used in NDRF prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 26th September 2018 to 03th Oct 2018 for consideration

Technical particulars for Spine boards
Posted On: 26/09/2018

Draft T P for Spine boards used in NDRF prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 26th September 2018 to 03th oct 2018 for consideration

Draft TP for Grease Graphite-I is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for Grease Graphite-I is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for Oil Machinery / General Purpose machinery Oil VG-32 & VG-100 is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for Oil Machinery / General Purpose machinery Oil VG-32 & VG-100 is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for Gear Oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for Gear Oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for Oil Spindle (Light) is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for Oil Spindle (Light) is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for Oil Hydraulic VG-46, VG-68 & VG-150 is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for Oil Hydraulic VG-46, VG-68 & VG-150 is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for Axle Oil (Medium) is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for Axle Oil (Medium) is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for Anti Wire Hydraulic Oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for Anti Wire Hydraulic Oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for Internal Combustion Engine Lubrication Oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for Internal Combustion Engine Lubrication Oil is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for RADAR SPEED DISPLAY BOARD is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for RADAR SPEED DISPLAY BOARD is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for WAX PAPER is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for WAX PAPER is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Draft TP for GERMINATION PAPER is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration
Posted On: 20/09/2018

Draft TP for GERMINATION PAPER is prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 20th September 2018 to 27th September 2018 for consideration

Bamboo Square Stick Making Machine
Posted On: 20/09/2018

Draft T P for Bamboo Square Stick Making Machine used use to make Square Stick of the bamboo in the direction of the fibers parallel to the surface prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 20th ...

Mechanic Motor Vehicle Trainee Kit
Posted On: 20/09/2018

Draft T P for Mechanic Motor Vehicle Trainee Kit provided to trainee of CITS under Skill India Development Program prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 20th September 2018 to 27th Sept 2018 ...

Mechanic machine tool maintenance Trainee Kit
Posted On: 20/09/2018

Draft T P for Mechanic machine tool maintenance kit provided to trainee of CITS under Skill India Development Program prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 20th September 2018 to 27th Sept 20...

Fitter trainee tool kit
Posted On: 20/09/2018

Draft T P for Fitter Trainee tool kit provided to trainee of CITS under Skill India Development Program prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 20th September 2018 to 27th Sept 2018 for conside...

Agriculture Harrow Disc type
Posted On: 19/09/2018

Draft T P Agriculture Harrow Disc type which is used in open field working for the superficial ploughing for the shattering of clods preparation of soil for sowing burial of organic substance & remains prepared and published in ...

MB Plough/Reversible MB Plough
Posted On: 19/09/2018

Draft TP MB Plough/Reversible MB Plough which is used in open field working for the superficial ploughing for the shattering of clods preparation of soil for sowing burial of organic substance & remains prepared and published in the Forum Suggest...

Agriculture Rotavator
Posted On: 19/09/2018

Draft TP Agriculture Rotavator which is used as primary cum secondary tillage implement which help to conserve previous soil moisture and pulverises soil up-to 6 inches of depth or more is prepared and published in the Forum Suggestions/ Feedback ar...

Power Sprayer
Posted On: 19/09/2018

Draft TP Power Sprayer which is used to spray the of chemical to crops or field covering large area with help power operated pump & nozzle prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 25th Septe...

Hand Slicer (Manual handle Type)
Posted On: 19/09/2018

Draft T P forBamboo Hand slicer machine shall be capable to make thin slices of bamboo strip of both wet and dry Bamboo in slices of thickness from 0.5 to 1 mm by manually handle operated prepared and published in the Forum Suggestions/ Feedback are ...

Bamboo Chain Splitter Machine
Posted On: 19/09/2018

Draft T P for Bamboo Chain Splitter machine shall be capable to split round bamboo in to strip of both wet and dry Bamboo prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 19th September 2018 to 25th S...

Draft TP for STEEL BUTT HINGES prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 18th September 2018 to 25th Sept 2018 for consideration
Posted On: 18/09/2018

Draft TP for STEEL BUTT HINGES prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 18th September 2018 to 25th Sept 2018 for consideration

Draft TP for Radio Frequency Co-axial cable Type 75-7-2
Posted On: 18/09/2018

Draft T.P. for Radio Frequency Co-axial cable Type 75-7-2 prepared as per IS: 5802(Part II):1975 latest and published. Suggestions / Feedback are invited from all stake holders from 18th September to 24th September 2018 for consideration.

Draft TP for Black polythene cap Cover (LDPE)
Posted On: 17/09/2018

Draft TP for Black polythene cap Cover (LDPE) prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 17 th Sept 2018 to 23 rd Sept 2018 for consideration

Blood collection Needles for Vacuum Blood Collection Tubes
Posted On: 12/09/2018

Draft TP for Blood collection Needles for Vacuum Blood Collection Tubes prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 12th September 2018 to 18th September 2018 for consideration

Draft TP for Pest repellent products prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 12th September 2018 to 19th September 2018 for consideration
Posted On: 12/09/2018

Draft TP for Pest repellent products prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 12th September 2018 to 19th September 2018 for consideration

Draft TP for Lead-acid Starter Batteries as per JIS D 5301:2006
Posted On: 11/09/2018

Draft T.P. for Lead-acid starter batteries as per JIS D 5301:2006. Suggestions / Feedback are invited from all stake holders from 11th September to 16th September 2018 for consideration.

Vacuum Blood Collection Tubes
Posted On: 11/09/2018

Draft TP for Vacuum Blood Collection Tubes prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 11th September 2018 to 17th September 2018 for consideration

Technical particulars for Microscopic slide coverslips
Posted On: 11/09/2018

The technical parameters for creation of category for Microscopic slide coverslips is enclosed herewith All stake holders are requested to give there comments if any regarding the technical parameters with in 15 days from 11 Sept 2018 to 26th Sept 20...

Technical particulars for microscopic slides
Posted On: 11/09/2018

The technical parameters for creation of category for Microscopic slides is enclosed herewith All stake holders are requested to give there comments if any regarding the technical parameters with in 15 days from 11 Sept 2018 to 26th Sept 2018 in case...

Concrete Test Hammer (Rebound Hammer)
Posted On: 11/09/2018

Draft TP for Concrete Test Hammer (Rebound Hammer) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 11th September 2018 to 18th September 2018 for consideration

Draft TP for tomato sauce black salt and scrub pad are prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 07th September 2018 to 13th September 2018 for consideration
Posted On: 07/09/2018

Draft TP for tomato sauce black salt and scrub pad are prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 07th September 2018 to 13th September 2018 for consideration

Draft TP for Distribution Transformer
Posted On: 07/09/2018

Draft T.P. for Distribution Transformer conforming to IS: 1180 (Part 1). Suggestions / Feedback are invited from all stake holders from 7th September to 13th September 2018 for consideration.

Glass Ionomer Cement for Dentistry
Posted On: 07/09/2018

Draft TP for Glass Ionomer Cement for Dentistry prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 07th September 2018 to 13th September 2018 for consideration

Collagen Membrane Barrier for Orthopedic & Dental Surgeries
Posted On: 07/09/2018

Draft TP for Collagen Membrane Barrier for Orthopedic & Dental Surgeries prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 07th September 2018 to 13th September 2018 for consideration

Draft TP for White cartridge paper is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 5th September 2018 to 12th september 2018 for consideration
Posted On: 05/09/2018

Draft TP for White cartridge paper is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 5th September 2018 to 12th september 2018 for consideration

Draft TP for Oats Dal Arhar Honey and Butter is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 4rth September 2018 to 11th september 2018 for consideration
Posted On: 04/09/2018

Draft TP for Oats Dal Arhar Honey and Butter is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 4rth September 2018 to 11th september 2018 for consideration

Draft TP for Tissue box is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 4rth September 2018 to 11th september 2018 for consideration
Posted On: 04/09/2018

Draft TP for Tissue box is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 4rth September 2018 to 11th september 2018 for consideration

Draft TP for Green Tea Black pepper and Cube sugar is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 4rth September 2018 to 11th september2018 for consideration
Posted On: 04/09/2018

Draft TP for Green Tea Black pepper and Cube sugar is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 4rth September 2018 to 11th september 2018 for consideration

Draft TP for business card holder box file and display file is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 31st August 2018 to 7 september2018 for consideration
Posted On: 31/08/2018

Draft TP for business card holder box file and display file is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 31st August 2018 to 7 september2018 for consideration

Draft TP for different types of salt is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 31st August 2018 to 7 september2018 for consideration
Posted On: 31/08/2018

Draft TP for different types of salt is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 31st August 2018 to 7 september2018 for consideration

Draft TP for Appointment stand is prepared and published for suggestions and feedback are invited from all stakeholders from 31st August 2018 to 7th September 2018 for consideration
Posted On: 31/08/2018

Draft TP for Appointment stand is prepared and published for suggestions and feedback are invited from all stakeholders from 31st August 2018 to 7th September 2018 for consideration

Mobile Water Treatment Vehicle
Posted On: 31/08/2018

Draft TP for Mobile Water Treatment Vehicle is prepared and published for suggestions and feedback are invited from all stakeholders from 31st August 2018 to 7th September 2018 for consideration

Microphone Trainer Kit For Educational Purpose
Posted On: 30/08/2018

Draft TP for Microphone Trainer Kit For Educational Purpose has been prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 30th August 2018 to 6th Sept 2018 for consideration.

DRAFT TP FOR SS WORKTABLE
Posted On: 29/08/2018

Draft TP for SS WORKTABLE prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 29th August 2018 to 5th Sept 2018 for consideration

DRAFT TP FOR frp urinal cabin
Posted On: 29/08/2018

Draft TP for frp urinal cabin prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 29th August 2018 to 5th Sept 2018 for consideration

DRAFT TP FOR SS SHELF RACK
Posted On: 29/08/2018

Draft TP for SS SHELF RACK prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 29th August 2018 to 5th Sept 2018 for consideration

DRAFT TP FOR SS POT RACK
Posted On: 29/08/2018

Draft TP for SS POT RACK prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 29th August 2018 to 5th Sept 2018 for consideration

Commercial use combination oven
Posted On: 27/08/2018

Draft TP for Commercial use combination oven has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 27th Aug 2018 to 3rd Sep 2018 for consideration

Rice Cooker
Posted On: 27/08/2018

Draft TP for Rice Cooker has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 27th Aug 2018 to 3rd Sep 2018 for consideration

Stainless Steel Bain Marie
Posted On: 27/08/2018

Draft TP for Stainless Steel Bain Marie has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 27th Aug 2018 to 3rd Sep 2018 for consideration

Vegetable Cutter
Posted On: 27/08/2018

Draft TP for Vegetable Cutter has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 27th Aug 2018 to 3rd Sep 2018 for consideration

Industrial Refrigerator
Posted On: 27/08/2018

Draft TP for Industrial Refrigerator has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 27th Aug 2018 to 3rd Sep 2018 for consideration

Draft TP for Digitizer (Graphic Tablet) for suggestion and experoence
Posted On: 27/08/2018

Draft TP for Digitizer (Graphic Tablet) has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 25th Aug 2018 to 1st Sep 2018 for consideration

Draft TP for Hard Disk Cloning Device for suggestion and experience
Posted On: 27/08/2018

Draft TP for Hard Disk Cloning Device has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 25th Aug 2018 to 1st Sep 2018 for consideration

Draft TP for Token Display System for suggestion and feedback
Posted On: 27/08/2018

Draft TP for Token Display System has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 25th Aug 2018 to 1st Sep 2018 for consideration

Draft TP foe Wireless Attendant Calling System for suggestions and feedback
Posted On: 27/08/2018

Draft TP for Wireless Attendant Calling System has been prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 25th Aug 2018 to 1st Sep 2018 for consideration

Draft TP for Coffee in the Forum Suggestions/Feedback are invited from all stake holders from 24th August 2018 to 30th August 2018 for consideration
Posted On: 24/08/2018

Draft TP for Coffee in the Forum Suggestions/Feedback are invited from all stake holders from 24th August 2018 to 30th August 2018 for consideration

Draft TP for Sugar in the Forum Suggestions/Feedback are invited from all stake holders from 24th August 2018 to 30th August 2018 for consideration
Posted On: 24/08/2018

Draft TP for Sugar in the Forum Suggestions/Feedback are invited from all stake holders from 24th August 2018 to 30th August 2018 for consideration

Draft TP for Black Tea in the Forum Suggestions/Feedback are invited from all stake holders from 24th August 2018 to 30th August 2018 for consideration
Posted On: 24/08/2018

Draft TP for Black Tea in the Forum Suggestions/Feedback are invited from all stake holders from 24th August 2018 to 30th August 2018 for consideration

FRP Rigid Inflatable Boat With OBM 4.7 m (Rescue ships or boats )
Posted On: 23/08/2018

FRP Rigid Inflatable Boat With OBM 4.7 m (Rescue ships or boats )

Turbine Response System
Posted On: 23/08/2018

Turbine Response System

Tablet manufacturing machine Rotatory Type
Posted On: 23/08/2018

The technical parameters for creation of category for Tablet manufacturing machine Rotatory type for manufacturing of tablets is enclosed herewith All stake holders are requested to give there comments if any regarding the technical parameters with i...

Technical particulars for Bamboo thin slicer machine
Posted On: 23/08/2018

Request regarding creation of category for Bamboo Processing Machines were received from Forest Department, Madhya Pradesh. In view of the same technical parameters have been prepared for creation of category for Bamboo thin slicer machine. All sta...

Technical particulars for Bamboo slicer machine (Heavy duty)
Posted On: 23/08/2018

Request regarding creation of category for Bamboo Processing Machines were received from Forest Department, Madhya Pradesh. In view of the same technical parameters have been prepared for creation of category for Bamboo slicer machine (Heavy duty) . ...

Technical particulars for Bamboo slitter Grill manual
Posted On: 23/08/2018

Request regarding creation of category for Bamboo Processing Machines were received from Forest Department, Madhya Pradesh. In view of the same technical parameters have been prepared for creation of category for Bamboo splitter(Grill manual) . All ...

Technical particulars for Bamboo External knot removing machine
Posted On: 23/08/2018

Request regarding creation of category for Bamboo external knot removing Machines were received from Forest Department, Madhya Pradesh. In view of the same technical parameters have been prepared for creation of category for External knot removing...

Technical particulars for Bamboo processing machine
Posted On: 23/08/2018

Request regarding creation of category for Bamboo Cross Cutting Machines were received from Forest Department, Madhya Pradesh. In view of the same technical parameters have been prepared for creation of category for Bamboo cross cutting machine. Al...

Mob Control Vehicle
Posted On: 21/08/2018

Draft TP for Mob Control Vehicle is prepared and published for suggestions and feedback are invited from all stakeholders from 21st August 2018 to 28th August 2018 for consideration

Electric Bus
Posted On: 21/08/2018

Draft TP for Electric Bus is prepared and published for suggestions and feedback are invited from all stakeholders from 21st August 2018 to 28th August 2018 for consideration

DRAFT TP FOR Stainless Steel Dining table with fixed chair
Posted On: 21/08/2018

Draft TP for Stainless Steel Dining table with fixed chair prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 21st August 2018 to 28th August 2018 for consideration

Technical particulars for chipping hammer
Posted On: 21/08/2018

The technical parameters for creation of category for chipping hammer which is used in disaster operations is enclosed herewith All stake holders are requested to give there comments if any regarding the technical parameters with in 10 days from 21s...

Technical particulars for Come along
Posted On: 21/08/2018

The technical parameters for creation of category for come along which is used in confined space entry, exit and rescue work is enclosed herewith All stake holders are requested to give there comments if any regarding the technical parameters with ...

Draft TP for Photocopier paper prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 21st August 2018 to 27th August 2018 for consideration
Posted On: 21/08/2018

Draft TP for Photocopier paper prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 21st August 2018 to 27th August 2018 for consideration

RESTORATIVE FILLING AND CARVING INSTRUMENTS SET -DENTAL-(RBSK)
Posted On: 20/08/2018

Draft TP for RESTORATIVE FILLING AND CARVING INSTRUMENTS SET -DENTAL-(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 21st August 2018 to 27th August 2018 for consideration

Distance Vision Testing drum –(RBSK)
Posted On: 16/08/2018

Draft TP for Distance Vision Testing drum –(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 16th August 2018 to 22nd August 2018 for consideration

Illuminated Near Vision test drum –(RBSK)
Posted On: 16/08/2018

Draft TP for Illuminated Near Vision test drum –(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 16th August 2018 to 22nd August 2018 for consideration

Opthalmic Trial frame –(RBSK)
Posted On: 16/08/2018

Draft TP for Opthalmic Trial frame –(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 16th August 2018 to 22nd August 2018 for consideration

Opthalmic Trial Lens set -(RBSK)
Posted On: 16/08/2018

Draft TP for Opthalmic Trial Lens set -(RBSK) prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 16th August 2018 to 22nd August 2018 for consideration

GeM Bags Technology Sabha Award
Posted On: 13/08/2018

Dr Rajesh Narang, CTO, GeM received Technology Award 2018 award on behalf of GeM_India for Enterprise Application Category at Technology Sabha event organised at Vizag on August 9, 2018

Draft TP for Token Display System
Posted On: 12/08/2018

Draft TP for Token Display System has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 12th Aug 2018 to 19th Aug 2018 for consideration

Draft Technical Particulars for Wireless Attendant Calling System
Posted On: 12/08/2018

Draft TP for Wireless Attendant Calling System has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 12th Aug 2018 to 19th Aug 2018 for consideration

Draft TP for Educational Toys is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 10th August 2018 to 17th August 2018 for consideration
Posted On: 10/08/2018

Draft TP for Educational Toys is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 10th August 2018 to 17th August 2018 for consideration

Draft TP for Plotter Paper Roll is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from10th August 2018 to 17th August 2018 for consideration
Posted On: 10/08/2018

Draft TP for Plotter Paper Roll is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 10th August 2018 to 17th August 2018 for consideration

Draft TP for Sodium Thiosulphate in the Forum Suggestions/Feedback are invited from all stake holders from10th August 2018 to 16th August 2018 for consideration
Posted On: 10/08/2018

Draft TP for Sodium Thiosulphate in the Forum Suggestions/Feedback are invited from all stake holders from10th August 2018 to 16th August 2018 for consideration

Technical particulars for Emergency rescue stretcher
Posted On: 09/08/2018

Technical parameters for the creation of category for Emergency rescue stretcher required by NDRF have been prepared and the same is attached herewith Stake holders are request to submit comments suggestions if any with in 7 days from 9th Aug 2018 to...

Technical particulars for Rotary hammer drill
Posted On: 09/08/2018

Technical parameters for the creation of category for roatry hammer drill required by NDRF have been prepared and the same is attached herewith Stake holders are request to submit comments suggestions if any with in 7 days from 9th Aug 2018 to 16th...

DRAFT TP FOR STEEL SHOE RACK
Posted On: 08/08/2018

Draft TP for STEEL SHOE RACK prepared and published in the Forum Suggestions/ Feedback are invited from all stakeholders from 8th August 2018 to 14th August 2018 for consideration

Draft TP for Sodium Carbonate in the Forum Suggestions/Feedback are invited from all stake holders from 8th August 2018 to 15th August 2018 for consideration
Posted On: 08/08/2018

Draft TP for Sodium Carbonate in the Forum Suggestions/Feedback are invited from all stake holders from 8th August 2018 to 15th August 2018 for consideration

Draft TP for Sodium Chloride in the Forum Suggestions/Feedback are invited from all stake holders from 7th August 2018 to 14th August 2018 for consideration
Posted On: 07/08/2018

Draft TP for Sodium Chloride in the Forum Suggestions/Feedback are invited from all stake holders from 7th August 2018 to 14th August 2018 for consideration

Draft TP for Sodium Bicarbonate in the Forum Suggestions/Feedback are invited from all stake holders from 7th August 2018 to 14th August 2018 for consideration
Posted On: 07/08/2018

Draft TP for Sodium Bicarbonate in the Forum Suggestions/Feedback are invited from all stake holders from 7th August 2018 to 14th August 2018 for consideration

Draft TP for Examination answer book in the Forum Suggestions/Feedback are invited from all stake holders from 7th August 2018 to 14th August 2018 for consideration
Posted On: 07/08/2018

Draft TP for Examination answer book in the Forum Suggestions/Feedback are invited from all stake holders from 7th August 2018 to 14th August 2018 for consideration

Draft TP for Potassium Iodate in the Forum Suggestions/Feedback are invited from all stake holders from 7th August 2018 to 14th August 2018 for consideration
Posted On: 07/08/2018

Draft TP for Potassium Iodate in the Forum Suggestions/Feedback are invited from all stake holders from 7th August 2018 to 14th August 2018 for consideration

MM Personality inventory
Posted On: 06/08/2018

Draft TP for MM Personality inventory prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 12th August 2018 for consideration

Raven's Educational CPM/CVS
Posted On: 06/08/2018

Draft TP for Raven's Educational CPM/CVS prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 12th August 2018 for consideration

Wechsler Adult Intelligence Scale
Posted On: 06/08/2018

Draft TP for Wechsler Adult Intelligence Scale prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 12th August 2018 for consideration

Wechsler Intelligence Scale for Children
Posted On: 06/08/2018

Draft TP for Wechsler Intelligence Scale for Children prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 12th August 2018 for consideration

Handles for surgical blades, detachable
Posted On: 06/08/2018

Draft TP for Handles for surgical blades, detachable prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 12th August 2018 for consideration

Blades surgical detachable
Posted On: 06/08/2018

Draft TP for Blades surgical detachable prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 6th August 2018 to 12th August 2018 for consideration

Draft TP for Potassium Bromide in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 13th August 2018 for consideration
Posted On: 06/08/2018

Draft TP for Potassium Bromide in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 13th August 2018 for consideration

Draft TP for Nitric Acid in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 13th August 2018 for consideration
Posted On: 06/08/2018

Draft TP for Nitric Acid in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 13th August 2018 for consideration

Draft TP for Ortho Phasphoric Acid in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 13th August 2018 for consideration
Posted On: 06/08/2018

Draft TP for Ortho Phasphoric Acid in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 13th August 2018 for consideration

Draft TP for Sodium Sulphate in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 13th August 2018 for consideration
Posted On: 06/08/2018

Draft TP for Sodium Sulphate in the Forum Suggestions/Feedback are invited from all stake holders from 6th August 2018 to 13th August 2018 for consideration

Draft TP for Aerial Bunched Cable
Posted On: 06/08/2018

Draft T.P. For Aerial Bunched Cables for working voltages up to and including 1100 Volts Prepared as per IS: 14255:1995 latest and published. Suggestions / Feedback are invited from all stakeholders from 6th August 2018 to 12th August 2018 for co...

Draft TP for Potassium iodide in the Forum Suggestions/Feedback are invited from all stake holders from 3rd August 2018 to 10th August 2018 for consideration
Posted On: 03/08/2018

Draft TP for Potassium iodide in the Forum Suggestions/Feedback are invited from all stake holders from 3rd August 2018 to 10th August 2018 for consideration

Draft TP for Oxalic Acid in the Forum Suggestions/Feedback are invited from all stake holders from 3rd August 2018 to 10th August 2018 for consideration
Posted On: 03/08/2018

Draft TP for Oxalic Acid in the Forum Suggestions/Feedback are invited from all stake holders from 3rd August 2018 to 10th August 2018 for consideration

Sterilization Indicator Tapes for Medical Purposes
Posted On: 03/08/2018

Draft TP for Sterilization Indicator Tapes for Medical Purposes prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 3rd August 2018 to 9th August 2018 for consideration

Water tender Type B or Fire or rescue trucks
Posted On: 02/08/2018

Water tender Type B or Fire or rescue trucks

Water tender Type A or Fire or rescue trucks
Posted On: 02/08/2018

Water tender Type A or Fire or rescue trucks

Draft TP for Boric Acid is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 1st August 2018 to 8th AUGUST 2018 for consideration
Posted On: 01/08/2018

Draft TP for Boric Acid is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 1st August 2018 to 8th AUGUST 2018 for consideration

Draft TP for Glycerine is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 31st July 2018 to 7th AUGUST 2018 for consideration
Posted On: 31/07/2018

Draft TP for Glycerine is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 31st July 2018 to 7th AUGUST 2018 for consideration

Draft TP for Ammonia is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 31st July 2018 to 7th AUGUST 2018 for consideration
Posted On: 31/07/2018

Draft TP for Ammonia is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 31st July 2018 to 7th AUGUST 2018 for consideration

Desktop Computer TP Augmented
Posted On: 30/07/2018

Draft TP for Desktop Computer TP Augmented has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 30th July 2018 to 6th August 2018 for consideration

Technical Particulars for Hydraulic Jack System 20 tons for Disaster Operations
Posted On: 30/07/2018

Consultative committee meeting for preparation of technical parameters for a Hydraulic Jack System 20 Tons for Disaster Operations were held on 13th july 2018 .Based on the discussions in the CCM and technical parameters for creation of categor...

Draft TP for Barium Chloride in the Forum Suggestions/Feedback are invited from all stake holders from 27th July 2018 to 4th August 2018 for consideration
Posted On: 27/07/2018

Draft TP for Barium Chloride in the Forum Suggestions/Feedback are invited from all stake holders from 27th July 2018 to 4th August 2018 for consideration

Draft TP for Acetic Acid in the Forum Suggestions/Feedback are invited from all stake holders from 27th July 2018 to 4th August 2018 for consideration
Posted On: 27/07/2018

Draft TP for Acetic Acid in the Forum Suggestions/Feedback are invited from all stake holders from 27th July 2018 to 4th August 2018 for consideration

Draft TP for Boot Brush prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 27th July 2018 to 4th August 2018 for consideration
Posted On: 27/07/2018

Draft TP for Boot Brush prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 27th July 2018 to 4th August 2018 for consideration

Draft TP for PORTA CABIN - Cement Fiber Board
Posted On: 20/07/2018

Draft TP for PORTA CABIN - Cement Fiber Board is prepared and published in the Forum Suggestions / Feedback are invited from all stake holders from 20 th July 2018 to 246th July 2018 for consideration before finalization of TP on Gem

Draft TP for Cold mix is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 18th July 2018 to 23rd July 2018 for consideration
Posted On: 19/07/2018

Draft TP for Cold mix is prepared and published in the Forum Suggestions/Feedback are invited from all stakeholders from 18th July 2018 to 23rd July 2018 for consideration

Technical particulars for Spirit Level
Posted On: 18/07/2018

Technical particulars for Spirit Level for creation of category in gem portal is prepared and attached herewith All stake holders are requested to offer there comments or suggestions within 7 days from 18th July 2018 to 25th July 2018 In case no ...

DRAFT TP FOR POLICE BOOTH
Posted On: 18/07/2018

Draft TP for POLICE BOOTH is prepared and published in the Forum Suggestions / Feedback are invited from all stake holders from 18 th July 2018 to 24 th July 2018 for consideration before finalization of TP on Gem

Technical Particulars for Replacement metal cutting blades for recirpocating saw
Posted On: 18/07/2018

In order to discuss the technical parameters for creation of category for Replacement metal cutting blades for Reciprocating Saw Used in Disaster Management CCM was held on 12th July . After discussions in the CCM technical parameters have been prepa...

Technical Particulars for Replacement wood cutting blades for recirpocating saw
Posted On: 18/07/2018

In order to discuss the technical parameters for creation of category for Replacement wood cutting blades for Reciprocating Saw Used in Disaster Management CCM was held on 12th July . After discussions in the CCM technical parameters have been prepar...

Technical Particulars for Battery operated Reciprocating saw
Posted On: 18/07/2018

In order to discuss the technical parameters for creation of category for Battery Operated Reciprocating Saw Used in Disaster Management CCM was held on 12th July . After discussions in the CCM technical parameters have been prepared which is attache...

Draft TP for Pre School Kit is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 17th July 2018 to 22nd July 2018 for consideration
Posted On: 17/07/2018

Draft TP for Pre School Kit is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 17th July 2018 to 22nd July 2018 for consideration

Draft TP for Pre School Kit for the Govt of Chhattisgarh is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 16th July 2018 to 21st July 2018 for consideration
Posted On: 16/07/2018

Draft TP for Pre School Kit for the Govt of Chhattisgarh is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 16th July 2018 to 21st July 2018 for consideration

Draft TPs for Zinc oxide magnesium metal powder starch and gum arabic are prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 16th July 2018 to 21th July 2018 for consideration
Posted On: 16/07/2018

Draft TPs for Zinc oxide magnesium metal powder starch and gum arabic are prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 16th July 2018 to 21th July 2018 for consideration

Published of software items along with reference price in Computer Aided Textile Designing (CATD) Software category and other categories
Posted On: 15/07/2018

Published of software items along with reference price in Computer Aided Textile Designing (CATD) Software category and Document Management system and Digital E-Learning Software

Therapeutic balls for exercise -(RBSK)
Posted On: 13/07/2018

Draft TP for Therapeutic balls for exercise -(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 13th July 2018 to 19th July 2018 for consideration

Head Circumference measuring tape -(RBSK)
Posted On: 13/07/2018

Draft TP for Head Circumference measuring tape -(RBSK) prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 13th July 2018 to 19th July 2018 for consideration

Therapy floor mat for exercise -(RBSK)
Posted On: 13/07/2018

Draft TP for Therapy floor mat for exercise -(RBSK) prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 13th July 2018 to 19th July 2018 for consideration

Technical particulars for twin shaft shredder
Posted On: 13/07/2018

In order to discuss the technical parameters for creation of category of shredder machines for disposal of municipal waste CCM was held on 26-6-18 . After discussion in the CCM technical parameters have been prepared for twin shaft shredder which ...

Mid-upper Arm Circumference (MUAC) tape -(RBSK)
Posted On: 10/07/2018

Draft TP for Mid-upper Arm Circumference (MUAC) tape -(RBSK) prepared and published in the Forum Suggestions/ Feedback are invited from all stake holders from 10th July 2018 to 16th July 2018 for consideration

Reusable Sanitary Napkins or Maternity pads
Posted On: 10/07/2018

Draft TP for Reusable Sanitary Napkins or Maternity pads prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 10th July 2018 to 16th July 2018 for consideration

Draft TP for Metallic Signage or Viterous Enamel Metallic Signage is prepared and published for suggestions and feedback are invited from all stakeholders from 10th July 2018 to 17th July 2018 for consideration
Posted On: 10/07/2018

Draft TP for Metallic Signage or Viterous Enamel Metallic Signage is prepared and published for suggestions and feedback are invited from all stakeholders from 10th July 2018 to 17th July 2018 for consideration

Electronic Theodolite
Posted On: 09/07/2018

Draft TP for Electronic Theodolite is prepared and published for suggestions and feedback are invited from all stakeholders from 9th July 2018 to 16th July 2018 for consideration

Draft TP for Books is prepared and published for suggestions and feedback are invited from all stakeholders from 9th July 2018 to 16th July 2018 for consideration
Posted On: 09/07/2018

Draft TP for Books is prepared and published for suggestions and feedback are invited from all stakeholders from 9th July 2018 to 16th July 2018 for consideration

Tree Guard
Posted On: 06/07/2018

Draft TP for Tree Guard is prepared and published for suggestions and feedback are invited from all stakeholders from 6th July 2018 to 13th July 2018 for consideration

Market/Reference price of Layered Voice Analysis
Posted On: 06/07/2018

Layered Voice Analysis (LVA 6.50) software item has been published on GeM portal with reference price and so we are requesting you to provide feedback / suggestion/ comments that if anybody has purchased the item or similar items in the past at ...

Draft TP for Audio Digital Signal Processor
Posted On: 05/07/2018

Draft TP for Audio Digital Signal Processor has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 4th July 2018 to 10th July 2018 for consideration

Draft TP for Counter Communication System
Posted On: 05/07/2018

Draft TP for Counter Communication System has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 4th July 2018 to 10th July 2018 for consideration

Draft TP for Speakerphone
Posted On: 05/07/2018

Draft TP for Speakerphone has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 4th July 2018 to 10th July 2018 for consideration

Draft TP for Switcher
Posted On: 05/07/2018

Draft TP for Switcher has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 4th July 2018 to 10th July 2018 for consideration

DIGITAL BUTYRO REFRACTOMETER FOR DAIRY PRODUCTS
Posted On: 05/07/2018

Draft TP for DIGITAL BUTYRO REFRACTOMETER FOR DAIRY PRODUCTS is prepared and published for suggestions and feedback are invited from all stakeholders from 5th July 2018 to 12th July 2018 for consideration

Draft TP for Micro PC
Posted On: 03/07/2018

Draft TP for Micro PC has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 3rd July 2018 to 9th July 2018 for consideration

Infantometer
Posted On: 03/07/2018

Draft TP for Infantometer prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 3rd July 2018 to 9th July 2018 for consideration

Draft TP for High End 3D/4D Colour Doppler Equipment published in forum seeking comments n suggestions if any from stakeholders Buyers or Sellers during the period ending on 14th July 2018 before firming up for creation of new product category
Posted On: 02/07/2018

Draft TP for High End 3D/4D Colour Doppler Equipment published in forum seeking comments n suggestions if any from stakeholders Buyers or Sellers during the period ending on 14th July 2018 before firming up for creation of new product category

Technical Particulars for Wrist and Forearm Splints and Braces
Posted On: 28/06/2018

ConsultativeCommittee Meeting for category Wrist and Forearm Splints and Braces was held on 21st June and the finalised technical Particulars for the category taking in to account of discussions in the CCM is attatched herewith All stake holders ...

Technical Particulars for Knee Splints and Braces
Posted On: 28/06/2018

ConsultativeCommittee Meeting for Knee Splints and Braces category was held on 21st June and the finalised technical Particulars for the category taking in to account of discussions in the CCM is attatched herewith All stake holders ae requested to ...

Draft TP for Antimony Sulphide prepared and published in the Forum. Suggestions / Feedback are invited from all stakeholders from 28th June 2018 to 3rd July 2018 for consideration.
Posted On: 28/06/2018

Draft TP for Antimony Sulphide prepared and published in the Forum. Suggestions / Feedback are invited from all stakeholders from 28th June 2018 to 3rd July 2018 for consideration.

Draft TP for Varnish prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 22nd June 2018 to 29th June 2018 for consideration
Posted On: 22/06/2018

Draft TP for Varnish prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 22nd June 2018 to 29th June 2018 for consideration

Draft TP for Sodium Nitrate prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 22nd June 2018 to 29th June 2018 for consideration
Posted On: 22/06/2018

Draft TP for Sodium Nitrate prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 22nd June 2018 to 29th June 2018 for consideration

Draft TP for Silver Nitrate prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 22nd June 2018 to 29th June 2018 for consideration
Posted On: 22/06/2018

Draft TP for Silver Nitrate prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 22nd June 2018 to 29th June 2018 for consideration

Draft Technical Particulars for Air Filter for Data Centre has been prepared and attached for perusal and suggestions if any on the same from 21 June 2018 to 28 June 2018
Posted On: 21/06/2018

Draft Technical Particulars for Air Filter for Data Centre has been prepared and attached for perusal and suggestions if any on the same from 21 June 2018 to 28 June 2018

Draft Technical Particulars for sign boards has been prepared and attached for perusal and suggestions if any on the same from 21 June 2018 to 28 June 2018
Posted On: 21/06/2018

Draft Technical Particulars for sign boards has been prepared and attached for perusal and suggestions if any on the same from 21 June 2018 to 28 June 2018

Draft TP for Low Temperature Hydrogen Peroxide Steriliser published in forum seeking comments n suggestions if any from stakeholders Buyers or Sellers during the period ending on 27th June 2018 before firming up for creation of new product category
Posted On: 20/06/2018

Draft TP for Low Temperature Hydrogen Peroxide Steriliser published in forum seeking comments n suggestions if any from stakeholders Buyers or Sellers during the period ending on 27th June 2018 before firming up for creation of new product category

Draft TP for Laboratory Hotplates published in forum seeking comments n suggestions if any from stakeholders Buyers or Sellers during the period ending on 26th June 2018 before firming up for creation of new product category
Posted On: 19/06/2018

Draft TP for Laboratory Hotplates published in forum seeking comments n suggestions if any from stakeholders Buyers or Sellers during the period ending on 26th June 2018 before firming up for creation of new product category

Technical Particulars For Single Shaft Shredder
Posted On: 15/06/2018

On the Basis of request Recieved from a Municipal Corporation category of Single Shaft Shredder used for disposal of Municipal Waste was taken up for category Creation The Draft Technical Particulars prepared is enclosed here with Consultatiove Comm...

Technical Particulars for Plastic Bailing Machine
Posted On: 15/06/2018

On the Basis of request Recieved from a Municipal Corporation category of Plastic Bailing Machine used for disposal of Municipal Waste was taken up for category Creation The Draft Technical Particulars prepared is enclosed here with Consultatiove Com...

Technical Particulars for Cork Sheet Display Board
Posted On: 14/06/2018

In terms of request recieved from Education Department Delhi Goverment it has been decided to create a category Cork Sheet Display Board in the GeM Portal Draft TP for same is prepared and same is attatched herewith Suggestions and feedback are i...

Draft TP for RFID Reader Equipment
Posted On: 14/06/2018

Draft TP for RFID Reader Equipment TP is prepared and published for suggestions and feedback are invited from all stakeholders from 14th June 2018 to 22th June 2018 for consideration

Technical Particulars For Bolt Cutter
Posted On: 13/06/2018

Technical Particulars prepared on the basis of IS 5200 for Bolt Cutters is attatched herewith All stake holders from Buyers and Sellers are requested to offer thir comments and suggestions regarding changes if any required in the Technical Paramete...

Draft TP for Educational Toys is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 13th June 2018 to 20th June 2018 for consideration
Posted On: 13/06/2018

Draft TP for Educational Toys is prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 13th June 2018 to 20th June 2018 for consideration

Draft TP for iso propyl alcohol prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 12th June 2018 to 18th June 2018 for consideration
Posted On: 12/06/2018

Draft TP for iso propyl alcohol prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 12th June 2018 to 18th June 2018 for consideration

Draft TP for Rectified Spirit prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 12th June 2018 to 18th June 2018 for consideration
Posted On: 12/06/2018

Draft TP for Rectified Spirit prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 12th June 2018 to 18th June 2018 for consideration

Draft TP forPotassium Nitrate prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 12th June 2018 to 18th June 2018 for consideration
Posted On: 12/06/2018

Draft TP forPotassium Nitrate prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 12th June 2018 to 18th June 2018 for consideration

Intubation stylets
Posted On: 11/06/2018

Draft TP for Intubation stylets prepared and published in the Forum Suggestions/Feedback are invited from all stake holders from 12th June 2018 to 18th June 2018 for consideration

Thermocol ice box for Medical purposes
Posted On: 11/06/2018

Draft TP for Thermocol ice box for Medical purposes prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 12th June 2018 to 18th June 2018 for consideration

Draft Technical Particulars for Sodium Hypochlorite Solution GRADE 1 prepared and published for suggestions and feedback are invited from all stakeholders from 11th June 2018 to 18th June 2018 for consideration
Posted On: 11/06/2018

Draft Technical Particulars for Sodium Hypochlorite Solution GRADE 1 IS 11673 Latest has been prepared and attached for perusal and suggestions if any on the same

Feedback on Draft Technical Particulars of the new products viz Biscuits Cake Savory Snacks Juices Soft Drinks and Wafers
Posted On: 07/06/2018

Technical Particulars prepared for category creation in the GeM Portal for Biscuits Cake Savory Snacks Juices Soft Drinks and Wafers are attatched herewith All stakeholders are requested to give their comments and suggestions regarding changes if a...

Postponement of Consultation meetings for TP paper Roll Digester and Bioredeem and Decomposter scheduled on 6 June 2018
Posted On: 05/06/2018

It is informed that the consultation meetings for finalising the technical particulars of TP paper Roll Digester and Bioredeem and Decomposter scheduled on 6 June 2018 have since been postponed due to unavoidable reasons Inconvenience is regreted The...

GeM Technical Particulars for Canvas Walking Shoes with Direct Moulded PU Sole
Posted On: 04/06/2018

Draft GeM technical Particulars for Canvas Walking Shoes with Direct Moulded PU Sole are uploaded herewith for inputs from various stake holders till 11th June 2018

Buyer - Seller Consultative Meeting to finalize specs of TP Roll, Digester, Bioredeem and Decomposter
Posted On: 01/06/2018

Government eMarketplace is pleased to invite buyers and sellers to attend the consultative meeting on Wednesday 6th June 2018 to finalize the technical particulars of the following products as per schedule given below: 1. TP Paper Roll: from 3.00 -...

Startup Category Health Kiosk
Posted On: 25/05/2018

Draft TP for Health Kiosk prepared and published in the Forum Suggestions Feedback are invited from all the stake holders from 25th MAY 2018 to 1st June 2018 for consideration

Draft TP for200 KVA Online UPS for Critical Infrastructures prepared and published in the Forum. Suggestions, Feedback are invited from all stake holders from 23rd May 2018 to 29th May 2018 for consideration
Posted On: 23/05/2018

Draft TP for200 KVA Online UPS for Critical Infrastructures prepared and published in the Forum. Suggestions, Feedback are invited from all stake holders from 23rd May 2018 to 29th May 2018 for consideration

Reference Price of Software Items Feedback suggestions required
Posted On: 21/05/2018

Following software items will be published on GeM portal with reference price mentioned as per attachment You are requested to publish these above software items along with reference price for feedback / suggestion/ comments from all stakeholders tha...

ELECTRIC SCOOTERS
Posted On: 11/05/2018

Draft Technical Particulars for ELECTRIC SCOOTERS has been prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 11th May 2018 to 18th May 2018 for consideration

Draft TP for Portable Fire extinguisher
Posted On: 11/05/2018

Draft TP for Portable Fire extinguisher prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 11th May 2018 to 18th May 2018 for consideration

Draft TP for Riser Pipes Draft TP for Portable Fire extinguisher
Posted On: 11/05/2018

Draft TP for Portable Fire extinguisher prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 11th May 2018 to 18th May 2018 for consideration

Draft TP for Casing Pipes
Posted On: 11/05/2018

Draft TP for Casing Pipes prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 11th May 2018 to 18th May 2018 for consideration

Draft TP for Dry powder Metal Fire Extinguisher
Posted On: 11/05/2018

Draft TP for Dry powder Metal Fire Extinguisher prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 11th May 2018 to 18th May 2018 for consideration

Draft TP for Submersible Cable
Posted On: 11/05/2018

Draft TP for Submersible Cable prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 11th May 2018 to 18th May 2018 for consideration

Draft TP for Borewell Pipes
Posted On: 11/05/2018

Draft TP for Borewell Pipes prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 11th May 2018 to 18th May 2018 for consideration

Draft TP for Wireless Bridge
Posted On: 05/05/2018

Draft TP for Wireless Bridge for Navigation prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 5th MAY 2018 to 12th May 2018 for consideration

Draft TP for GPS for Navigation
Posted On: 05/05/2018

Draft TP for GPS for Navigation prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 5th MAY 2018 to 12th May 2018 for consideration

Draft TP for Waterless Shampoo
Posted On: 03/05/2018

Draft TP for Waterless Shampoo prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 3rd MAY 2018 to 8th May 2018 for consideration

Draft TP for Waterless Body Wash
Posted On: 03/05/2018

Draft TP for Waterless Body Wash prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 3rd MAY 2018 to 8th May 2018 for consideration

Driving cum Mechanics Tool Kit
Posted On: 02/05/2018

Draft TP for Driving Cum Mechanics Tool Kit prepared and published in the Forum Suggestions and Feedback are invited from all stake holders from 02nd MAY 2018 to 8th May 2018 for consideration In case Stake holders feel there is necessity to add more...

Draft Technical Particular of "Encrypted Removable Storage Media"
Posted On: 02/05/2018

Draft Technical Particular of "Encrypted Removable Storage Media" prepared and published in the Forum Suggestions and feedback are invited from all stake holders from 2nd May 2018 to 7th May 2018 for consideration

Draft TP for PORTABLE ORTHO HEATING PAD -ELECTRICAL
Posted On: 26/04/2018

Draft TP for PORTABLE ORTHO HEATING PAD -ELECTRICAL prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 27th April 2018 to 3rd May 2018 for consideration

Draft TP for REBREATHING BAG OR RESUSCITATOR BAG
Posted On: 25/04/2018

Draft TP for REBREATHING BAG OR RESUSCITATOR BAG prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 25th April 2018 to 1st May 2018 for consideration

Draft TP for PORTABLE WATER PURIFIERS OR FILTERS
Posted On: 25/04/2018

Draft TP for PORTABLE WATER PURIFIERS OR FILTERS prepared and published in the Forum Suggestions Feedback are invited from all stake holders from 25th April 2018 to 1st May 2018 for consideration

Veterinary artificial inseminating machine Or iVET Scope (for large and small animals)
Posted On: 17/04/2018

Draft TP for the Veterinary artificial inseminating machine Or iVET Scope (for large and small animals)

Draft Technical Parameters for PORTABLE EMERGENCY LIGHTING SYSTEM With Battery Bank with Tower/Telescopic Tower/Vertical Mast Type
Posted On: 03/03/2018

A consultative meeting was held on 19th February 2018 for Portable Emergency Lighting System with AC Gen set / Battery bank with Tower/Telescopic/Vertical mast based items with Buyers and Sellers for which the details are attached

Draft technical parameters for Flasher Light for Police Vehicles
Posted On: 03/03/2018

A Consultative Meeting was held on 16th February, 2018 for Flasher Light for Police Vehicles with Sellers and Buyers for which the details are attached

Draft Technical Parameters for LED Luminaire for Flood Light
Posted On: 03/03/2018

A Consultative Meeting was held on 16th February, 2018 for LED Luminaire for Flood Light with Sellers and Buyersfor which the details are atatched

Draft Technical Parameters for Body Light
Posted On: 03/03/2018

A Consultative Meeting was held on 16th February, 2018 for Body Light for Police with Sellers and Buyers. The details of the discussion and the technical parameters is attached

Draft Technical Parameters for MCCB
Posted On: 03/03/2018

Consultative meeting was held at Conference Hall 2nd Floor on 16.02.18 to discuss on the technical parameters of MCCB for which the details is attached for your feedback.

Draft Technical Particulars for LED Luminaire for Recessed type street light
Posted On: 02/03/2018

Consultative Meeting was held on 16.02.2018 at 02.30 p.m. in the Conference Room, 2nd Floor with buyers and sellers for LED Luminaire for Recessed type street light The details are atatched

Draft Technical Particulars of LED Luminiaire for Residential Street Lights
Posted On: 02/03/2018

Buyer-Seller consultation on LED Luminaries Road and street lights was held on 16th February, 2018 for which the details are attached

Consultative Meeting Schedule
Posted On: 28/02/2018

As you are aware that the Government e-Marketplace (GeM) is an online marketplace for Central Govt./State Govt/PSUs buyers for procurement of common use Goods and Services. The marketplace is enabling the wide range of product offers by GeM Seller(s...

The draft Technical Particulars and Minutes of the Consultative Meeting of Stationery Items such as Gum, Cotton Tag, Transparent Tape and PVC Tape for suggestions on forum
Posted On: 03/01/2018

Technical attributes of Stationery Items (Gum, Cotton Tag, Transparent Tape and PVC Tape) is being considered to be update in GeM Portal. The draft Technical Particulars and Minutes of the Consultative Meeting are available. Suggestions are invited f...

The draft Technical Particulars and Minutes of the Consultative Meeting of Air Purifier and Fogging Machine for suggestions on forum
Posted On: 03/01/2018

Technical attributes of Air Purifier and Fogging Machine is being considered to be update in GeM Portal. The draft Technical Particulars and Minutes of the Consultative Meeting are available. Suggestions are invited from all stake holders from 3rd Ja...

The draft Technical Particulars and Minutes of the Consultative Meeting of Stationery Items for suggestions on forum
Posted On: 03/01/2018

Technical attributes of Stationery Items (Envelope, Folder file cover, Ring binder, Report Cover, Lever Arch File) is being considered to be update in GeM Portal. The draft Technical Particulars and Minutes of the Consultative Meeting are available. ...

The draft Technical Particulars and Minutes of the Consultative Meeting of Napthalene Balls for suggestions on forum
Posted On: 03/01/2018

Technical attributes of Napthalene Balls is being considered to be update in GeM Portal. The draft Technical Particulars and Minutes of the Consultative Meeting are available. Suggestions are invited from all stake holders from 3rd January to 10th Ja...

Hyper converged infrastructure
Posted On: 11/12/2017

Hyper converged infrastructure is being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 11th December 2017 to 18th December 2017 for consideration

Forklifts
Posted On: 08/12/2017

Fork Lift is being considered for uploading on GeM Portal covering Diesel Engine operated and Battery operated Fork Lift The draft technical particular are available Suggestions are invited from all stake holders from 8122017 to 15 th December 2017

Draft Technical Particulars for Polycarbonate Shield (Riot shields)
Posted On: 05/12/2017

Polycarbonate Shield (Riot shields) is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 5th December to 13th December 2017 for consideration

Draft Technical Particulars for Digital Clock
Posted On: 05/12/2017

Digital Clock is being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 5th December 2017 to 12th December 2017 for consideration

Armored Motor Vehicles
Posted On: 04/12/2017

Armored Motor Vehicles are being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 4th December 2017 to 11th December 2017 for consideration

Draft Technical Particulars of Auditorium Chairs
Posted On: 01/12/2017

Auditorium Chairs TP is being considered to be put in GeM Portal The Draft Technical particulars are available ad suggestions are invited from all stake holders from 01122017 to 07122017 for consideration

Draft Technical Particulars of Card Room Furniture
Posted On: 27/11/2017

Card Room Furniture TP is being considered to be put in GeM Portal The Draft Technical particulars are available and suggestions are invited from all stake holders from 27112017 to 03122017 for consideration

Draft Technical Particulars of Restaurant Furniture
Posted On: 27/11/2017

Restaurant Furniture TP is being considered to be put in GeM Portal The Draft Technical particulars are available and suggestions are invited from all stakeholders from 27112017 to 04122017 for consideration

ELECTRIC CARS
Posted On: 27/11/2017

ELECTRIC CARS are being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 27th November 2017 to 4th December 2017 for consideration

Draft Technical Particulars for Compatible Factory New Printer Ribbon Cartridge
Posted On: 23/11/2017

Compatible Factory New Printer Ribbon Cartridge TP is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 23rd November to 30th November 2017 for consideration

Draft Technical Particulars for OEM Printer Ribbon Cartridge
Posted On: 23/11/2017

OEM Printer Ribbon Cartridge TP is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 23rd November to 30th November 2017 for consideration

The draft Technical Particulars of Electronic Paper Collator
Posted On: 20/11/2017

Technical attributes of Electronic Paper Collator is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 20th November to 27th November 2017 for consideration

Retractable Belt Barrier Stanchion
Posted On: 17/11/2017

Retractable Belt Barrier Stanchion is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 17th November to 27th November 2017 for consideration

Draft Technical Particulars for Network Attached Storage
Posted On: 15/11/2017

Network Attached Storage is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 15th November to 22nd November 2017 for consideration

Draft Technical Particulars for Hard Disk Degausser
Posted On: 15/11/2017

Hard Disk Degausser is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 15th November to 22nd November 2017 for consideration

Draft Technical Particulars for Hard Disk Crusher
Posted On: 15/11/2017

Hard Disk Crusher is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 15th November to 22nd November 2017 for consideration

Technical Particulars for Survival Blanket
Posted On: 10/11/2017

Survival Blanket MK 1 is being considered to be put in GeM Portal Suggestions on draft Technical Particulars are invited from all stake holders till 17th November 2017 for consideration

Technical Particulars for Bag Waterproof
Posted On: 07/11/2017

Bag Waterproof is being considered to be put in GeM Portal Suggestions on draft Techinical Particulars are invited from all stake holders till 15th November 2017 for consideration

Bomb basket or Blast guard container
Posted On: 07/11/2017

Bomb basket or Blast guard container is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 7th November to 15th November 2017 for consideration

SBM Litter Picker( Vacuum type)
Posted On: 06/11/2017

SBM Litter Picker( Vacuum type) is being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 6th November 2017 to 12th November 2017 for consideration

Technical Particulars for Coat Extreme Cold Climate
Posted On: 03/11/2017

Coat Extreme Cold Climate is being considered to be put in GeM Portal Suggestions on draft Techinical Particulars are invited from all stake holders till 10th November 2017 for consideration

Table Fan
Posted On: 31/10/2017

Table Fan is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 31st October to 6th November 2017 for consideration

Technical particulars for different categories of sutures
Posted On: 31/10/2017

TP cover the categories of sutures stake holders from buyer organisations and sellers are requested to offer their comments with in one week by 7th November 2017

Hydration Pack
Posted On: 31/10/2017

Suggestion are herewith invited from various stakeholders on technical particulars for Hydration Pack till 7th November 2017

CHLORINE Tablets
Posted On: 30/10/2017

CHLORINE Tablets are being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 30th October 2017 to 6th November 2017 for consideration

Sodium Dichloro isocyanurate NADCC Tablets
Posted On: 26/10/2017

Sodium Dichloro isocyanurate(NADCC) Tablets are being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 26th October 2017 to 2nd November 2017 for consideration

Deep Search Metal Detector
Posted On: 23/10/2017

Deep Search Metal Detectors being considered to be put on GeM Portal The draft Technical Particulars are available and Suggestions are invited from all stake holders

Suggestion for Draft GeM TP Leaf Colour Chart (LCC)
Posted On: 23/10/2017

Suggestion for Draft GeM TP Leaf Colour Chart (LCC) is being considered to be put in GeM Portal The draft Technical Particulars are available and Suggestions are invited from all stake holders from 23 October to 31 October 2017 for consideration ...

Draft Technical Particulars of Hard Disk
Posted On: 17/10/2017

Hard Disk is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 17th October to 24th October 2017 for consideration

Draft Technical Particulars for Enterprise SAN Storage
Posted On: 17/10/2017

Enterprise SAN Storage is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 17th October to 24th October 2017 for consideration

Draft Technical Particulars for Object Storage
Posted On: 17/10/2017

Object Storage is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 17th October to 24th October 2017 for consideration

Draft Technical Particulars of PDF GEM Hyper Converged Infrastructure for Data Centers
Posted On: 16/10/2017

The Draft Technical Particulars of PDF GEM Hyper Converged Infrastructure for Data Centers are available and suggestions are invited from all Stakeholders for consideration

Draft Technical Particulars of Neoprine Sheet
Posted On: 12/10/2017

The Draft Technical Particulars of Neoprine Sheet are available and suggestions are invited from all Stakeholders for consideration

Draft Technical Particulars for Oxygen Gas Cylinders
Posted On: 12/10/2017

The Draft Technical Particulars of Oxygen Gas Cylinders are available and suggestions are invited from all Stakeholders for consideration

Draft Technical Particulars for Mosquito Net LLINs
Posted On: 12/10/2017

The Draft Technical Particulars of Mosquito Net LLINs are available and suggestions are invited from all Stakeholders till 23rd Oct 2017 for consideration

Draft Technical Parameters of Table Fan
Posted On: 06/10/2017

Draft Technical Parameters of Table Fan being considered to be put on GeM Portal and Suggestions are invited from all stake holders

Suggestion for Draft GeM TP Benches
Posted On: 21/09/2017

Benches is being considered to be put in GeM Portal The draft Technical Particulars are available and Suggestions are invited from all stake holders from 21 September to 28 September 2017 for consideration

Suggestion for Draft GeM TP Santary Post
Posted On: 21/09/2017

Santary Post is being considered to be put in GeM Portal The draft Technical Particulars are available and Suggestions are invited from all stake holders from 21 September to 28 September 2017 for consideration

Suggestion for Draft GeM TP STEEL PIPES FOR WATER AND SEWAGE
Posted On: 21/09/2017

STEEL PIPES FOR WATER AND SEWAGE is being considered to be put in GeM Portal The draft Technical Particulars are available and Suggestions are invited from all stake holders from 21 September to 28 September 2017 for consideration

Draft Technical Particulars For VSAT
Posted On: 20/09/2017

VSAT is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 20th September to 27th September 2017 for consideration

Draft Technical Specifications of SSL Certificates
Posted On: 19/09/2017

SSL Certificates are being considered to be brought on GeM portal All stakeholders are requested to give their comments or suggestions on the draft specifications latest by 25th Sep 2017

TUBES for Pneumatic TYRES for Automotive vehicles
Posted On: 08/09/2017

TUBES for Pneumatic TYRES for Automotive vehicles are being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 8th September to 15th September 2017 for consideration

Pneumatic TYRES for Automotive vehicles
Posted On: 08/09/2017

Pneumatic TYRES for Automotive vehicles are being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 8th September to 15th September 2017 for consideration

GeM TP for Gypsy Horn
Posted On: 07/09/2017

Gypsy horn is being considered to be put in GeM Portal. The draft Technical Particulars are available Suggestions are invited from all stake holders from 07th September to 14th September 2017 for consideration

School Administration & Automation Software
Posted On: 07/09/2017

Draft Technical specification of School Administration & Automation Software considered for GeM portal The suggestion are invited from all stake holders till 15th Sep 2017

Language / Multilingual Software'
Posted On: 07/09/2017

Draft Technical specification of Language / Multilingual Software' ' considered for GeM portal The suggestion are invited from all stake holders till 15th Sep 2017

Accounting Software
Posted On: 07/09/2017

Draft Technical specification of Accounting Software' considered for GeM portal The suggestion are invited from all stake holders till 15th Sep 2017

'Backup and Replication Software
Posted On: 07/09/2017

Draft Technical specification of 'Backup and Replication Software' considered for GeM portal The suggestion are invited from all stake holders till 15th Sep 2017

Various Units of Video Conferencing System
Posted On: 07/09/2017

Draft Technical specification of Various units of Video Conferencing System for bunching considered for GeM portal The suggestion are invited from all stake holders till 15th Sep 2017

Draft Technical Particulars for Electronic Paper Collator
Posted On: 06/09/2017

Electronic Paper Collator is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 6th September to 13th September2017 for consideration

GeM TP for Electronic Total Station
Posted On: 05/09/2017

Electronic Total Station is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 5th September 13th September 2017 for consideration

Draft GeM Technical Particulars for T Shirt
Posted On: 05/09/2017

Technical attributes of T Shirt is being considered to be put in GeM Portal and suggestions are invited on the draft Technical Particulars from all stake holders till 12th September 2017 for consideration

GeM TP for Night vision device
Posted On: 05/09/2017

Night vision device is being considered to be put in GeM Portal. The draft Technical Particulars are available Suggestions are invited from all stake holders from 05th September to 12th September 2017 for consideration

Replacement/ Compatible (Factory new) INK CARTRIDGES WITHOUT PRINT HEAD ASSEMBLY
Posted On: 29/08/2017

Draft Technical specification of Replacement/ Compatible (Factory new) INK CARTRIDGES WITHOUT PRINT HEAD ASSEMBLY considered for GeM portal The suggestion are invited from all stake holders till 8th Sep 2017

Resource Management Software
Posted On: 29/08/2017

Draft Technical specification of Resource Management Software considered for GeM portal The suggestion are invited from all stake holders till 7th Sep 2017

Performance and Management Tools for Virtualisation
Posted On: 29/08/2017

Draft Technical specification of Performance and Management Tools for Virtualisation considered for GeM portal The suggestion are invited from all stake holders till 7th Sep 2017

Audit and Compliance Software
Posted On: 29/08/2017

Draft Technical specification of Audit and Compliance Software considered for GeM portal The suggestion are invited from all stake holders till 7th Sep 2017

Technical attributes of Pantoon Boats(Floating Jetty) under Rescue ships or boats
Posted On: 29/08/2017

Technical attributes of Pantoon Boats (Floating Jetty) under Rescue ships or boats is being considered to be put in GeM Portal Suggestions are invited from all stake holders from 29th August to 6th september 2017 for consideration

NETWORK / WEB SECURITY SOFTWARE - APPLIANCES
Posted On: 29/08/2017

Draft Technical specification of NETWORK / WEB SECURITY SOFTWARE - APPLIANCES considered for GeM portal The suggestion are invited from all stake holders till 6th Sep 2017

ENDPOINT PROTECTION SOFTWARE / APPLIANCES
Posted On: 29/08/2017

Draft Technical specification of ENDPOINT PROTECTION SOFTWARE / APPLIANCES considered for GeM portal The suggestion are invited from all stake holders till 6th Sep 2017

E-MAIL SECURITY SOFTWARE / APPLIANCES
Posted On: 29/08/2017

Draft Technical specification of E-MAIL SECURITY SOFTWARE / APPLIANCES considered for GeM portal The suggestion are invited from all stake holders till 6th Sep 2017

Product-water Tanker mounted on two wheels trailer for GeM portal
Posted On: 28/08/2017

Draft Technical specification of Product-water Tanker mounted on two wheels trailer for GeM portal The suggestion are invited from all stake holders till 5th Sep 2017

Business Intelligence and Data Analysis Software'
Posted On: 28/08/2017

Draft Technical specification of Business Intelligence and Data Analysis Software' considered for GeM portal The suggestion are invited from all stake holders till 5th Sep 2017

GeM TP for Insulated needles for plexus anesthesia and nerve blocks
Posted On: 28/08/2017

Insulated needles for plexus anesthesia and nerve blocks is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 28 th August to 04th September 2017 for considerati...

PRISON VAN Police Vehicle
Posted On: 23/08/2017

PRISON VAN Police Vehicle is being considered to be put on GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 22nd August to 30th August 2017 for consideration

Video Conferencing System
Posted On: 23/08/2017

Technical attributes of Video Conferencing System is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 23th August to30th August 2017 for consideration

Chlorine Dioxide for treating Drinking Water
Posted On: 22/08/2017

Chlorine Dioxide for treating Drinking Water is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 22th August to 28th August 2017 for consideration

GeM TP for Light Bars
Posted On: 21/08/2017

Light bars is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 21th August to 28th August 2017 for consideration

GeM TP for Blinker Light
Posted On: 21/08/2017

Blinker light is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 21th August to 28th August 2017 for consideration

Suggestion Regarding Counter Chair Hydraulic for GeM
Posted On: 17/08/2017

Counter Chair Hydraulic is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 18th August to 28th August 2017 for consideration

GeM TP for (Mortar and Pestle)Wooden
Posted On: 16/08/2017

Mortar and Pestle (wooden) is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 16 th August to 23th August 2017 for consideration.

GeM TP for Scoops
Posted On: 16/08/2017

Scoops is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 16 th August to 23th August 2017 for consideration.

Technical attributes of under vehicle search mirror for uploading on GeM portal
Posted On: 11/08/2017

Technical attributes of under vehicle search mirror is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 11th August to 18 th August 2017 for consideration

GeM TP for Loud Hailer
Posted On: 10/08/2017

Loud hailer is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 10 th August to 18th August 2017 for consideration

GeM TP for Hand held metal detector
Posted On: 10/08/2017

Hand held metal detector is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 10 th August to 18th August 2017 for consideration

GeM TP for Door frame metal detector
Posted On: 10/08/2017

Door frame metal detector is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 10 th August to 18th August 2017 for consideration.

GeM TP for Mechanical shaker machine with timer.
Posted On: 10/08/2017

Mechanical shaker machine with timer is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 10 th August to 18th August 2017 for consideration

GeM TP for Soil sample grinder
Posted On: 10/08/2017

Soil sample grinder is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 10 th August to 18th August 2017 for consideration.

MINIVAC SUCTION DRAIN
Posted On: 09/08/2017

Atomic Absorption Minivac Suction Drain is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 9th August to 17th August 2017 for consideration

SELF INFLATING RESERVOIR BAG
Posted On: 09/08/2017

Atomic Absorption Self Inflating Reservoir Bag is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 9th August to 16th August 2017 for consideration

IRRADIANCE METER
Posted On: 09/08/2017

Atomic Absorption Irradiance Meteris being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 9th August to 16th August 2017 for consideration

Technical attributes of Demineralizer water plant
Posted On: 09/08/2017

Technical attributes of Demineralizer water plant is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 9th August to 16th August 2017 for consideration

Technical attributes of ECG Unit for uploading on GeM portal
Posted On: 09/08/2017

Technical attributes of ECG Unit is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 9th August to 16th August 2017 for consideration

Technical attributes of Double distillation water unit for uploading on GeM portal
Posted On: 09/08/2017

Double distillation water unit is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 9th August to 16th August 2017 for consideration

Techinical specification for Pulse Oxymeter
Posted On: 09/08/2017

Pulse Oxymeter is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 9th August to 16th August 2017 for consideration

Product under consideration Atomic Absorption Spectrophotometer
Posted On: 07/08/2017

Atomic Absorption Spectrophotometer is being considered to be put in GeM Portal The draft Technical Particulars are available Suggestions are invited from all stake holders from 7th August to 15th August 2017 for consideration

* Please send your suggestions to sanjay[dot]joseph[at]gem[dot]gov[dot]in or create a ticket in support center.