04-February-2025 03:00:00 PM |
13-January-2025 08:08:08 PM |
13-January-2025 08:08:08 PM |
Leading, loading, unloading & stacking of P.Way material from different stations i.e. Ghaziabad, Lucknow and other places to anywhere in Delhi division & in Track depot Shakurbasti in the section of SSE/P.Way/TD/SSB under DEN/Track. (including all leads & lift, GST, taxes etc, so nothing will be paid extra whatsever the case may be)/NIT-29-24-25-WC/79503668 |
Ministry of Railways |
N/A |
|
N/A |
04-February-2025 03:00:00 PM |
13-January-2025 02:03:40 PM |
13-January-2025 02:03:40 PM |
CTR(S)= 24.873 T.K.M in the section of ADEN-II-LKO under DEN-V-LKO/49-DEN-V-LKO-2024-25/79503991 |
Ministry of Railways |
N/A |
|
N/A |
22-January-2025 03:00:00 PM |
14-January-2025 06:50:00 PM |
14-January-2025 06:50:00 PM |
Upgradation/Modernization of existing parks/green Belts./56/EE/ELD-12/DDA/2024-25/2025_DDA_843282_2 |
Delhi Development Authority||CE-Electrical-DDA||EE(El)/ED-12-Dwarka-DDA |
N/A |
|
|
05-February-2025 03:00:00 PM |
13-January-2025 03:47:00 PM |
13-January-2025 03:47:00 PM |
Provision of Foot over bridge at Tiruchchirappalli town & Pichchandarkovil stations in VM-TPJ (chord line) section, Tiruchchirappalli Fort station in ED-TPJ section and Dismantling of existing foot over bridge at Tiruchchirappalli Fort station./TPJ-01-2025-03/79502899 |
Ministry of Railways |
N/A |
|
N/A |
11-February-2025 03:00:00 PM |
13-January-2025 05:26:25 PM |
13-January-2025 05:26:25 PM |
Supply, erection, testing and commissioning of Automatic Fault Locator (AFL) for 2x25 KV AC traction system based on auto transformer neutral current ratio for SP, SSP and TSS on MUMBAI- NDLS-ROUTE in MUMBAI, VADODARA and RATLAM Divisions of Western Railway in connection with Raising of Speed to 160kmph over existing Mumbai-New Delhi route ./EL-TR-C-CCG-AFL-03-24-25/79503375 |
Ministry of Railways |
N/A |
|
N/A |
20-January-2025 06:00:00 PM |
14-January-2025 06:00:00 PM |
14-January-2025 06:00:00 PM |
CompleteRepairing/Overhauling of Make-M and P Pump,600G.P.M., 06 Stages,Sl.No.BH(S)/M-0756A Of WaterTreatment Plant, BhowraSouth Colliery/BCCL/EJA/ENM/E Tender/2024-25/203/2025_BCCL_325774_1 |
Bharat Coking Coal Limited||BCCL_EJ AREA |
N/A |
|
|
22-January-2025 09:00:00 AM |
15-January-2025 09:00:00 AM |
14-January-2025 06:00:00 PM |
Supply and Constr of Qty 02 Fd WSS (Static Water Tank 100 KL)/2764/RFP/24-25/OP WKS (S AND C)/2025_ARMY_693259_1 |
IHQ of MoD (Army)-(OSCC)||Eastern Comd-IHQ of MoD (Army)-(OSCC)||CORPS 1-Eastern Comd-IHQ of MoD (Army)-(OSCC)||DIV A-CORPS1-Eastern Comd-IHQ of MoD |
N/A |
|
|
05-February-2025 03:00:00 PM |
13-January-2025 06:49:41 PM |
13-January-2025 06:49:41 PM |
Comprehensive Asset Management of Traction Control System (IGBT based TCC & LCC of AC-AC TCS) of EMD Make HHP locos capital equipment rehabilitation of ABR Shed./M2331632024-25AMCofTC/79502753 |
Ministry of Railways |
N/A |
|
N/A |
05-February-2025 03:00:00 PM |
13-January-2025 03:43:42 PM |
13-January-2025 03:43:42 PM |
Provision of foot over bridge at Kille, Kollidam and Anandatandavapuram stations in VM-TPJ (Main line) section./TPJ-01-2025-02/79502450 |
Ministry of Railways |
N/A |
|
N/A |
24-January-2025 06:00:00 PM |
14-January-2025 06:00:00 PM |
14-January-2025 06:00:00 PM |
Installation and commissioning of 1000 mm wide x 140 mtr long belt conveyor at 25L 58 dip to 62 dip at mill incline of Shankarpur colliery/ECL/GM/BA/E TENDER/24-25/ENM/361 Dt 14.01.2025/2025_ECL_325785_1 |
Eastern Coalfields Limited||ECL_Bankola area |
N/A |
|
|