17-January-2025 03:00:00 PM |
26-December-2024 12:16:47 PM |
26-December-2024 12:16:47 PM |
Annual sectional contract for petty works, maintenance, repair work & supply of materials under SSE/WORKS/KAWR section for the year 2024-25./KR-KW-OL-W-2024-98-RB/79074651 |
Ministry of Railways |
N/A |
|
N/A |
17-January-2025 03:00:00 PM |
26-December-2024 07:25:39 PM |
26-December-2024 07:25:39 PM |
ADEN(Works)BVP: Construction of precast wall for prevention of encroachment at MDDTI hostel. (740.0 Rm)/172-2024-25/79077584 |
Ministry of Railways |
N/A |
|
N/A |
17-January-2025 12:00:00 PM |
27-December-2024 06:00:00 PM |
27-December-2024 06:00:00 PM |
Lining of Contract for Complete Track renewal of platform Loading Tracks of A and B side/GEM/2024/B/5751382/2024_MCF_783230_1 |
Department of Fertilisers||National Fertilisers Limited |
N/A |
|
N/A |
17-January-2025 03:00:00 PM |
26-December-2024 11:59:46 AM |
26-December-2024 11:59:46 AM |
Providing Bore well with pipeline at Thivim Station in Goa State./KR-KW-OL-W-2022-104-DW-R1/79071380 |
Ministry of Railways |
N/A |
|
N/A |
20-January-2025 12:30:00 PM |
26-December-2024 03:38:48 PM |
26-December-2024 03:38:48 PM |
At BJU ELS Shed 06 nos. high mast light (12.5 meter) has urgently required in the ELS/BJU shed premises and along the roadside of the shed./L-Open-24-25-20Dt26-12-24/79053061 |
Ministry of Railways |
N/A |
|
N/A |
17-January-2025 03:00:00 PM |
26-December-2024 05:00:03 PM |
26-December-2024 05:00:03 PM |
Cess making and protection of embankment between km.733.5-733.850 on UP line./PGT-Works-2024-n24-06/79054540 |
Ministry of Railways |
N/A |
|
N/A |
17-January-2025 05:00:00 PM |
27-December-2024 05:40:00 PM |
27-December-2024 05:30:00 PM |
Supply, Installation, Commissioning and Training of (i) Plug Flow Reactor with compressor and (ii) Continuous Stirred Tank Reactor with compressor/SVNIT-CPP-416/DoChE/2024-2025/2024_SVNIT_841668_1 |
S. V. National Institute of Technology-Surat||Estate and Store Section |
N/A |
GEM/GARPTS/27122024/95X4557OBAKP |
|
17-January-2025 03:00:00 PM |
26-December-2024 04:58:06 PM |
26-December-2024 04:58:06 PM |
Proposed Track machine siding and allied works at Kollengode stations (work includes High Level/Rail level platforms work connecting CC road and trolley path for platforms, covered shed, Electrical tool room watering arrangement etc)./PGT-Works-2024-N24-03/79048415 |
Ministry of Railways |
N/A |
|
N/A |
27-January-2025 11:00:00 AM |
26-December-2024 05:22:11 PM |
26-December-2024 05:22:11 PM |
A) Provision of spider glazing system to work as OHS protective screen across track at 1) CLA station CSMT end FOB at KM 15/114-116 2) CLA station FOB at KM 15/116-118 3) TNA station middle FOB at KM 32/30-31 4) DI station FOB KYN end at KM 48/4-5.B) Repairs to FOB s staircase - damaged / wotn-out / slippery flooring, staircase, staircase roof sheet and side sheeting at CSMT, MSD, BY, PR, DR, MTN and SION station between CSMT-CLA sections. C) Repairs to FOB s Ramps damaged / worn-out/CR-DRMWBB-2024-32-09/79033343 |
Ministry of Railways |
N/A |
|
N/A |
17-January-2025 11:00:00 AM |
26-December-2024 12:03:55 PM |
26-December-2024 12:03:55 PM |
Stripping and fitting of Cushioning in GS, Non ACCZ, CN, AC, ACCZ type coaches for 24 months in Mechanical Workshop, Gorakhpur/42-GKP-MWS-2024-25/79040915 |
Ministry of Railways |
N/A |
|
N/A |