31-December-2024 11:30:00 AM |
23-November-2024 09:47:46 AM |
23-November-2024 09:47:46 AM |
Control Panel for Radiator Fan Motors of Diesel Engine for LHB Power Car/05241267/106533347 |
Ministry of Railways |
N/A |
|
N/A |
15-January-2025 02:00:00 PM |
23-November-2024 09:29:16 AM |
23-November-2024 09:29:16 AM |
Silicone Rubber Compound Sealant which satisfied the specified parameters of the specification (1) Specific gravity (g/cm3 ) at 25 degree C = (1.0-1.1). (2) Hardness = (20A - 30A shore). (3) Tensile strength (Kg/cm2) = (15 - 25). (4) Elongation = (400 percent - 800 percent). (5) Specific voltage (KV/mm) - >=20. (6) Colour - Red/white/Translucent. (7) Neutral cure sealant with non-corrosive properties./25243609A/106530057 |
Ministry of Railways |
N/A |
|
N/A |
30-December-2024 03:00:00 PM |
23-November-2024 12:39:59 PM |
23-November-2024 12:39:59 PM |
Kit Valve Assembly Handle/08241324/106526874 |
Ministry of Railways |
N/A |
|
N/A |
30-December-2024 02:25:00 PM |
23-November-2024 01:32:47 PM |
23-November-2024 01:32:47 PM |
Tungsten Carbide Tamping Tool as per Plasser part no. CU30.10840-FR-I/60241302/106524738 |
Ministry of Railways |
N/A |
|
N/A |
20-January-2025 10:45:00 AM |
23-November-2024 10:18:23 AM |
23-November-2024 10:18:23 AM |
PISTON SEAL KIT/P1241423B/106511695 |
Ministry of Railways |
N/A |
|
N/A |
30-December-2024 03:00:00 PM |
23-November-2024 11:56:53 AM |
23-November-2024 11:56:53 AM |
Carrying Out Detailed Technical Inspection of Important/Major (Girder) Bridges in Between DFC Chainage 119 to 278 Between MREN (New Manauri)-DDUN (New Deen Dayal Upadhyay) station under CGM/PRYJ(E)stations of Eastern Dedicated Freight Corridor Corporation of India Limited./PRYJ_E_EN-BI-2024/78612803 |
Ministry of Railways |
N/A |
|
N/A |
26-December-2024 03:00:00 PM |
23-November-2024 12:24:05 PM |
23-November-2024 12:24:05 PM |
Design, supply, erection testing and commissioning of 25 KV, Single Phase, AC OHE works, in connection with following works:
MRIDCL (Deposit Work)
(1)Construction of ROB at Km. 662/18-19 at Badnera station.
(2)Construction of ROB & LHS in Lieu of LC No. S-2 at Km. 666/07-08 on Badnera-Amravati section.
(3)Construction of RUB in Lieu of LC No. JK-6 at Km. 545K/21-22 on Jalamb-Khamgaon section.
(4)Construction of ROB at Rly. Km. 417/23N-25N on Jalgaon-Shirsoli section./BSL_Elect_TRD_36_2024/78607058 |
Ministry of Railways |
N/A |
|
N/A |
03-January-2025 03:00:00 PM |
23-November-2024 10:58:30 AM |
23-November-2024 10:58:30 AM |
Electrical work in connection with Provision of safety platform for maintenance of Locos, MEMU, Wagons, DETC and safety protection Jali guard/coverage heavy duty type/wiremachine guards for High speed machines at various shop of Dahod workshop./ELM384-G-2024-25-13/78590737 |
Ministry of Railways |
N/A |
|
N/A |
27-December-2024 12:00:00 PM |
23-November-2024 06:23:42 PM |
23-November-2024 06:23:42 PM |
Setting up of South Coast Railway Zone: Construction of GM office complex (B2+B1+ G+9), and other associated works at Visakhapatnam/ETCECONIVSKP2024048/77187364 |
Ministry of Railways |
N/A |
|
N/A |
30-December-2024 03:00:00 PM |
11-December-2024 05:00:00 PM |
23-November-2024 06:55:00 PM |
Supply, installation and commissioning of Mass Spectrometer (MS MALDI TOF/TOF)/Pur/4(04)/45/2024-25/T-57/2024_CSIR_216061_1 |
Council of Scientific and Industrial Research||CLRI-Chennai - CSIR||Purchase-CLRI - CSIR |
N/A |
GEM/GARPTS/23112024/XCENFUR8GG1S |
N/A |