31-December-2024 03:00:00 PM |
03-December-2024 06:10:16 PM |
03-December-2024 06:10:16 PM |
Appointment of Authority Engineer for Providing Project Management Services for Engineering, Procurement, Construction and Commissioning of 25 kV, 50 Hz, Single Phase, AC, Electrification work including FOCS and ROCS in Bhairabi - Sairang New single line Section in connection with New Line Project of Bhairabi - Sairang of N.F. Railway, including works of Supply, erection, modification, testing and commissioning of SCADA for the section and electrical general work of CLS (51.38RKM/65.45TK/EL-C-RE-MLG-07-24-25/78547318 |
Ministry of Railways |
N/A |
|
N/A |
27-December-2024 03:00:00 PM |
03-December-2024 10:13:53 PM |
03-December-2024 10:13:53 PM |
Provision of Dual MSDAC for train detection in Rajgarh City station of Kota Division in Connection with RMA-BPL New BG Line Work (262km)/BPLNCSnTBPL24-25-03/78543107 |
Ministry of Railways |
N/A |
|
N/A |
15-January-2025 03:00:00 PM |
03-December-2024 04:30:54 PM |
03-December-2024 04:30:54 PM |
Running Contract For Manufacture and supply of Improved SEJ RDSO Drg. No.T-6922./6324ENG54/78523985 |
Ministry of Railways |
N/A |
|
N/A |
02-January-2025 03:00:00 PM |
03-December-2024 10:55:12 AM |
03-December-2024 10:55:12 AM |
S&T work in connection with construction of LHS in lieu of LC no. 8, 9 & 17 of Jabalpur division on West Central Railway (Signalling Work)./JBP-N-SIG-TENDER-2024-36/78453905 |
Ministry of Railways |
N/A |
|
N/A |
30-December-2024 03:00:00 PM |
03-December-2024 12:14:57 PM |
03-December-2024 12:14:57 PM |
Londa-Miraj section-Construction of ROB at Km.613/800-900 in lieu of LC No 392 between Belagavi-Sambre station as 1x36m Composite Girder clear span ( Railway Portion) with 5x18.71m PSC Girder (NH end) and 6x18.71 m PSC girder (Mutaga end) and CC block in approaches between Belagavi and Sambre stations.(Composite Work)/LD-MRJ-ROB-LC-392/78342632 |
Ministry of Railways |
N/A |
|
N/A |
27-December-2024 03:00:00 PM |
03-December-2024 05:38:56 PM |
03-December-2024 05:38:56 PM |
BZA-DVD section: Vijayawada Division - Additions and alterations to OHE in connection with Proposed ADB Road expansion at Deep Water port lines in Vijayawada - Visakhapatnam section under DEPOSIT WORKS./B-E29-TRD-TNDR-14-24-25/78336628 |
Ministry of Railways |
N/A |
|
N/A |
09-January-2025 02:30:00 PM |
03-December-2024 06:57:55 PM |
03-December-2024 06:57:55 PM |
Earthwork in formation for railway BG embankment, blanketing work as per RDSO specification in revised alignment (Ch. 13.6 Km to 15.0 Km, Ch.-15.5 km to 17.8 km and 24.5 km to 27.9 Km), superstructure of Bridge No.-06 (OWG-1x30.5m), construction of RCC retaining wall and drain, protection work, 3 Nos of Gate goomty, 4 Nos of LOC huts, 2 Nos of OC huts, 3 Nos of auto huts; manufacturing, supplying & stacking of 50 mm size of machine crushed track ballast of approved quality conforming to l/CE-CON-KK-MIS-2024-13/78286561 |
Ministry of Railways |
N/A |
|
N/A |
07-January-2025 02:30:00 PM |
03-December-2024 04:26:43 PM |
03-December-2024 04:26:43 PM |
Name of work: Earthwork in formation for railway BG embankment, blanketing work as per RDSO specification, construction of RUBs (1 Nos) along with protection works, construction of RCC retaining walls & drains, 1 Nos. B Class station Building (MFA),1 Nos Outer cabin,3 Nos level crossing gate gumties & 1 Nos D class station building (MNEP) with circulating area and high level passenger platforms, 2 nos. 3m wide FOBs and all other connected ancillary works between Km 24.00 to Km 35.540/CE-CON-KM-MIS-2024-12/78269660 |
Ministry of Railways |
N/A |
|
N/A |
27-December-2024 03:00:00 PM |
03-December-2024 05:39:08 PM |
03-December-2024 05:39:08 PM |
Design, Supply, Erection, Testing and Commissioning of OHE Electrification work (25KV, 50HZ) and modification work of switching stations (TSS/SP/SSP) (Phase -I of 90 km) in connection with Doubling of Agra Fort-Bandikui section of Agra Division of N.C. Railway./AGC-EL-C-T-06-2024-25/78174332 |
Ministry of Railways |
N/A |
|
N/A |
27-December-2024 03:30:00 PM |
03-December-2024 06:55:02 PM |
03-December-2024 06:55:02 PM |
(I) Construction of Relay room (7.10m x 4.60m), IPS room (3.70m x 4.60m) and Battery room (3.00m x 4.60m) between HLD-BDO in connection with provision of IBSS in UP and DN direction between Haludpukur (HLD) - Bahalda Rd. (BDO) over Chakradharpur Division. (II) Construction of new Goomty at TB-53 at KM-315/02-03 and TB-4 at KM.253/10-11 in TATA-BMPR Section./CKP-EAST-24-25-33/78119454 |
Ministry of Railways |
N/A |
|
N/A |